The purpose of the 2018 International Residential Code (IRC), and of all building codes for that matter, is expressed in IRC Section R101.3: “The purpose of this code is to establish minimum requirements to safeguard the public safety, health, and general welfare …” This statement provides important information about building codes and code inspections. Building codes are minimum requirements. A house built to minimum requirements is not necessarily a high-quality house built by craftsmen according to best practices. Code inspections are about safety and health. They are not about fit, finish, and other cosmetic issues. They are not even about functional issues that are not specifically addressed in the code. Understanding the purpose of building codes helps you set realistic expectations about the limits of building codes and code inspections.

Building codes change; most do so on a three-year cycle. Many code changes are little more than rewording or reorganization in an attempt to make code provisions easier to understand and easier to find. Many code changes and additions are substantive, and homeowners should be aware of these as they perform repairs and remodeling projects. Substantive additions and changes are the reasons for this updated edition of Codes for Homeowners.

Trying to condense a 900-page code book that is mostly text and tables in very small print into significantly fewer pages filled with pictures and illustrations is a challenge. We have not included many code provisions, because homeowners will not use them. The provisions we include have been simplified to make them easier to understand. This means that Codes for Homeowners is not your local building code. Your local building code, as interpreted by your building inspector, is the code with which you must comply. You must do so even if you do not obtain a building permit for your work. If you have any doubts or questions about how a building code provision applies in your area, you should ask your local building inspectors. In almost every case, if you approach them as a resource and not as an obstacle, you will find your local inspectors to be friendly, knowledgeable, and eager to help.

Codes & Permits: The Basics

In just the United States you will find hundreds of code books describing thousands upon thousands of building code provisions. On top of this, there are even more books that look and feel like code books but are really only attempting to describe best practices. Almost all of these have their own inherent value. But almost none of them apply to a typical homeowner living in a typical single-family home. As a homeowner and DIYer, perhaps the hardest thing about building codes is learning how to tell which one applies to you and, if there is a disagreement, which takes precedence. As an introduction, here are some brief biographies of the more common codes and enforcement agencies you’re likely to encounter.

The International Residential Code

The IRC 2018 is one of an extensive collection of model building codes published by the International Code Council (ICC). A model building code is a recommended building code developed by a national organization that specializes in writing building codes. When adopted by a government agency, the IRC regulates the construction, renovation, maintenance, and repair of buildings used as homes. The IRC, by itself, has no formal legal status. A government agency must first adopt the IRC before it has any legal status in a local area.

The International Residential Code has no jurisdiction of its own but is the basis for many state and local residential building codes.

State & Local Building Codes

Almost all areas of the United States have adopted some version of a building code. Some states, such as California, Florida, and New York, have a state building code. Some large cities, such as Chicago and New York City, have a city building code. Many of these state and local building codes are based on model building codes from the ICC.

Smaller cities and counties often use ICC model building codes, such as the IRC. Some rural areas may not have adopted a building code, but this is becoming a rare situation. If you do any work that is regulated by the local building code, you are responsible for knowing, or for hiring someone who knows, the applicable building code where the building is located. Ignorance of the code is no excuse.

Some states and cities have their own building codes.

Local Code Amendments

Most building departments that use the IRC adopt local changes to the IRC. Many of these changes are minor and help to adapt the IRC to local conditions and needs. Some of these changes can significantly alter IRC provisions. The building department should publish, in writing, any changes adopted by the local government. You are responsible for knowing and complying with all local changes. Ask the building official if there are any local code changes.

Most jurisdictions have their own code amendments. Your city or municipality likely maintains a website with building ordinances posted and updated regularly.

Other Building Codes

The IRC is not the only building code. Others commonly used include: The International Building Code (IBC), The International Mechanical Code (IMC), The International Plumbing Code (IPC), The Uniform Plumbing Code (UPC), The International Fuel Gas Code (IFG), The National Electrical Code (NEC), and The International Energy Conservation Code (IECC). Each of these building codes regulates a different aspect of building construction.

The IBC regulates the structural aspects of all buildings, although it is not commonly applied to residential buildings. The IBC usually applies to commercial, industrial, and multi-family buildings, such as apartments. The IRC references the IBC and the IECC when a part of a residential building is not addressed by the IRC.

Each major system in a building has its own code. The IMC regulates heating, ventilation, and air conditioning systems; the IPC regulates plumbing systems; and the IFG regulates gas piping and gas equipment. These codes usually apply to commercial-type buildings. The UPC is a separate code, published by another code-writing organization, that also regulates plumbing systems. It may replace the IRC plumbing chapters in areas that adopt the UPC. The NEC regulates electrical systems. The IRC contains an adapted version of the NEC in the IRC electrical chapters. When the IRC does not address an electrical situation in a home, the NEC usually applies.

The IECC regulates energy-related aspects of all buildings. These aspects include: insulation, air infiltration, and window and door energy efficiency. The IRC contains a simplified subset of the IECC.

You should know which codes apply to your construction project. Ask your local building official which codes apply in your area.

Trade-oriented building codes with a more specific focus apply in some situations. Most of these are primarily for nonresidential construction.

Zoning Ordinances

Many areas, particularly the more densely populated ones, have land use and zoning ordinances that control what you can build on your property. You are responsible for knowing and complying with them. In larger jurisdictions, the planning and zoning department may be separate from the building inspection department, and sometimes one does not know what the other is doing. It is possible that the building inspection department might issue a permit that would create a zoning violation. Projects that might run afoul of zoning ordinances include new, free-standing buildings, basement remodels that add a bedroom, bathroom, and kitchen, and any project that adds an additional full kitchen on property zoned for single-family use.

Buildings Governed by the IRC

Apply the IRC to buildings containing one or two individual residential dwelling units in one building. Duplex is a common term for one building containing two individual dwelling units.

Apply the IRC to townhouses. A townhouse contains at least three individual dwelling units in one building.

Apply the IRC to all single-family homes.

Each dwelling unit in any building within the scope of the IRC must have a separate means of egress. This is often interpreted to mean that each dwelling unit must have a separate door to the outside.

Apply the IRC to residential buildings with not more than three stories above grade plane. A story above grade plane is: (a) one where the finished floor is entirely above grade plane, (b) is more than 6 feet above grade plane, or (c) is more than 12 feet above finished ground level at any point. The definition of grade plane is complex and is measured at the lowest point 6 feet from each building foundation wall. Refer to the definitions in the IRC and consult the local building official if there is a question about whether a basement is a story above grade plane.

Apply the IRC to owner-occupied guest accommodations (such as a bed and breakfast) if the building contains not more than five guest rooms and if a fire suppression system is installed in the building.

Do not apply the IRC to buildings used for business, office, commercial, industrial, or other residential purposes, such as a fraternity house. This is true even if the building was once used as a residence. You may apply the IRC to an office in the home if the office is incidental to the residential use of the building. Refer to the IBC and other applicable codes for code provisions governing buildings not governed by the IRC.

Apply the IRC to multi-family buildings, such as duplexes and townhomes.

Building Departments

A local building department enforces the building code in its jurisdiction. The technical term often used to describe this department is the Authority Having Jurisdiction (AHJ). The term used to describe the person responsible for enforcing the code is the Building Official or Chief Building Official. The public name for the local building department varies by jurisdiction. Many building departments will have the terms “building” or “safety” somewhere in the name. In some larger jurisdictions, the building department may be a division of a larger agency that is also responsible for land planning, zoning, and development. Some building department names may not sound like they have anything at all to do with building code enforcement. If you do any work that requires a building permit, you are responsible for finding and contacting the building department. Work done without a permit can have serious legal and financial consequences.

Consider your local building department to be a friendly place with extremely valuable resources to help you get your projects done correctly.

Working with Government Building Inspectors

The building official is the king of his building jurisdiction. Don’t mess with the king. He can make your life very difficult. If you must disagree with him, do so respectfully and with facts that support your position. The building official has the right to interpret any code provision. While he does not have the right to waive code provisions or to require more than the code requires, interpretations can sometimes have that effect. Even if his interpretation seems unreasonable, eventually it will probably prevail. In almost all cases, you should just smile and do what he tells you.

Most building officials and inspectors are honest, hardworking people who want to ensure that your project is safe and complies with local building codes. They can be a valuable resource. Take advantage of that resource. Ask questions and work with them. Most will, in turn, work with you.

Who Is Responsible for Code Compliance?

The general answer is that everybody associated with the project is responsible for code compliance, but with one exception. The primary responsibility usually falls on the permit holder, which is one reason why it is a warning signal if a contractor asks the property owner to pull the permit. A contractor who does not want to pull a permit may not have an active license, may have a bad reputation with the building inspectors, or there may be other reasons, few of which are good.

The one exception is the building inspectors. Building inspectors are not responsible for code compliance. They are responsible for inspecting to catch code violations, but they are usually not responsible if they do not catch a violation. Thus, passing an inspection and obtaining a certificate of occupancy is not a guarantee of code compliance.

Manufacturer’s Instructions

The IRC requires installing all components, equipment, and appliances according to the manufacturer’s instructions. This requirement is so important that it is repeated many times in the IRC. Manufacturer’s instructions are an enforceable extension of the IRC. This means that it is a code violation to install something in a manner that does not conform to manufacturer’s instructions.

Manufacturer’s instructions are an important part of ensuring that components are safe. Independent organizations test many components used to build homes. This includes almost all manufactured components. The tests are conducted under defined conditions that include using the manufacturer’s instructions to install the component. The testing organization certifies that the component is safe when installed and used according to manufacturer’s instructions. The testing organization places the certified components on a list maintained by the testing organization. This process is called listing, and the components are referred to in the IRC as listed.

The IRC cannot anticipate every possible building component and every possible way the component could be installed. As such, the IRC relies on the manufacturer’s instructions to specify how components should be installed.

When a difference between the IRC and the manufacturer’s instructions occurs, the IRC assumes that the manufacturer is in a better position to know its product and how it should be installed in a given situation. This is why the IRC usually defers to the manufacturer’s instructions. Ask the local building official for an interpretation if there is a difference between the manufacturer’s instructions and the IRC.

Manufacturer’s installation instructions must be followed to the letter, and they are an enforceable extension of the IRC.

Grandfathering Existing Work

In almost all situations, you are not required to abandon, remove, or alter existing work that is lawfully in existence and safely functioning. Lawfully in existence means the work was inspected and complied with the code when installed and/or modified.

In almost all situations, when updating, modifying, or repairing existing work, you are required to perform the update, modification, or repair according to the code in force when the work is performed. You are usually not required to make the existing work comply with current code.

Building Permits & Inspections

Contact your local building officials to determine which construction activities require a building permit and to determine the documents and procedures required to obtain a permit. The building official you speak with may not enforce some building permit requirements contained in the IRC, but may add building permit requirements not contained in the IRC.

You must wait until the required permit is issued before beginning work. Beginning work before the permit is issued may result in fines, and the building official could require removal of the work.

Comply with the building code applicable to where the building is located. The applicable building code is usually the code in force when the permit is issued. If you do not obtain a building permit, comply with the building code in force when the work is performed. The building code applies whether or not you obtain a building permit. This is important. Lack of a building permit does not relieve the building owner or the contractor of responsibility for code compliance.

Post the job site inspection card so the inspector can see it.

Required Inspections

Contact the building official to determine the required inspections for a construction project. Each jurisdiction has its own rules for inspections. These rules include: which inspections it performs, what work must be complete before requesting the inspection, how and when to schedule the inspection, and how it handles inspections of work that fails inspection.

Note that some jurisdictions conduct a separate inspection for each trade, some jurisdictions conduct one inspection when all trade work is complete, and some jurisdictions conduct trade inspections during the framing inspection. Check with the building official to determine if other inspections are required. Further required inspections may include flood plain and elevation, roof coverings, insulation and energy efficiency, interior drywall, and exterior wall coverings, such as stucco and masonry.

Final Inspections

Prior to final inspection, you should: Install all plumbing, HVAC, and electrical fixtures, equipment, and appliances and install all required safety components, such as stair handrails and guards, safety glazing, and smoke alarms. Note that jurisdictions have different rules about whether you must install finish components, such as floor coverings, before the final inspection. Jurisdictions also differ on whether tasks such as final grading and landscaping must be installed.

Do not assume that passing an inspection or receiving a certificate of occupancy is a waiver of any code violations. The building owner and contractor are responsible for any code violations regardless of whether the building has passed inspections.

Preparing for Inspections

Concrete footing inspections must be done before concrete is poured. Try to coordinate the inspection for the day before the planned pour, so you leave enough time to make corrections if required.

1. Install, square, and level forms.

2. Dig footing and pier trenches.

3. Install any required reinforcing bars.

Isolated footings, such as those used to support deck columns, must be inspected before the concrete is poured. The footings will be inspected for size and depth. Some footings may require reinforcing bars.

Concrete foundation wall inspections will focus on the wall thickness, base preparation, and reinforcement. All forms must be approved prior to the pour.

1. Install, square, straighten, plumb, and secure wall forms.

2. Install any required reinforcing bars.

Plumbing rough-in inspection

1. Install plumbing water supply and drain pipes in the building. The building sewer pipe inspection is usually a different inspection from the interior drainage and water supply pipe inspection. Install fixtures, such as tubs and showers, that may be difficult to install after the wall construction is complete.

HVAC inspection

1. Install HVAC ducts, pipes, and thermostat wires.

2. Install (or have installed) appliances, such as furnaces and air handlers, that may be difficult to install after the construction is complete.

Electrical rough-in inspection

1. Have electrical service panel and subpanel cabinets installed.

2. Install boxes for switches, receptacles, fixtures, and all electrical cables.

Framing inspection

1. Install all interior and exterior walls, floor joists and subflooring, ceiling joists and rafters, and roof sheathing. Install all required wall bracing, firestops, and draftstops.

2. Note that some jurisdictions may require installation of other components, such as moisture barriers and roofing felt, before calling for a framing inspection.

Building Design & Safety

One of the most important reasons for building codes is to promote the health and safety of building occupants. Health issues involve topics such as minimum room size, minimum ceiling height, and requirements for removing moisture and fumes that could damage your home and make you sick. Safety issues involve topics such as the size and location of emergency escape openings, design and construction of stairs (one of the most dangerous areas in a home), and the location and installation of smoke and carbon monoxide alarms.

This chapter will help you understand building code requirements that you may encounter when doing projects such as adding rooms and remodeling basements and attics. While this chapter will help you avoid the most common health and safety code violations, it does not address all code requirements. You should refer to other sources for more information before tackling complex projects.

In this chapter:

Habitable Rooms

Fire Separations

Stairways

Emergency Escape Openings

Egress Doors

Exterior Doors

Door & Window Hazards

Ventilation & Exhaust

Smoke & Carbon Monoxide Alarms

Habitable Rooms

Habitable rooms (also called habitable spaces) are living, sleeping, eating, and cooking rooms. Bathrooms, toilet rooms, closets, hallways, storage, and utility rooms are not habitable rooms. Habitable rooms have their own set of requirements for size, ceiling height, heating, lighting, and ventilation. Rooms that are not habitable do not have these requirements.

Measure between finished floor and the lowest part of the ceiling in most rooms and basements to determine if minimum ceiling height standards are met. Ceiling-mounted lights and fans do not factor into the height measurement.

Provide at least 84” of clear ceiling height between the finished floor and the ceiling at the center of the room. If the ceiling slopes, only that floorspace where the ceiling height is at least 60” may be considered habitable. Heights less than 60”, such as kneewall areas, may be useful for storage, but they aren’t considered living space.

Minimum Ceiling Height

1. Provide at least an 84-inch-tall finished ceiling height in habitable rooms and in hallways, including a basement containing habitable rooms and hallways. Measure ceiling height from the finished floor to the lowest projection from the ceiling. Projections usually include components such as joists, beams, and ducts. Projections do not usually include light fixtures and ceiling fans.

2. You may have obstructions that are at least 76 inches above the finished floor in a basement containing habitable rooms and hallways.

3. Provide at least an 80-inch-tall finished ceiling height in a basement that does not contain habitable rooms or hallways. You may have obstructions that are at least 76 inches above the finished floor in these basement areas. Use these basement areas only for mechanical equipment and for storage.

4. Provide at least an 80-inch finished ceiling height in bathrooms and laundry rooms. This does not mean that all of the bathroom must have an 80-inch-tall ceiling. The ceiling height above sinks and toilets may be less than 80 inches high but must be high enough to safely use the fixture. How much less is subject to interpretation by the building inspector.

5. Provide at least an 84-inch-tall finished ceiling height in habitable rooms with a sloped ceiling. Provide this ceiling height for at least 35 square feet of the finished floor area. Do not count any area with a ceiling height less than 60 inches toward the minimum 70-square-foot habitable room floor area.

Bathroom Design Standards

A 6’-tall person should be able to use a sink or toilet without bumping his or her head on the ceiling.

Provide at least 80” of finished ceiling height for all of the required floor area in showers and in tubs containing showers.

Codes (and good design practices) insist on ample space between bathroom fixtures.

Shower Size

1. Provide showers with a finished area of at least 900 square inches and a finished minimum dimension of at least 30 inches. Maintain the minimum dimensions from the top of the threshold to at least 70 inches above the shower drain outlet. Measure the shower from the center line of the threshold (curb). You may install valves, shower heads, soap dishes, and grab bars that encroach into the minimum dimensions. You may install a fold-down seat in the shower if the minimum dimensions are maintained when the seat is up.

2. You may provide a shower with a finished minimum dimension of at least 25 inches if the finished area is at least 1,300 square inches.

3. Provide a shower compartment entry opening of at least 22 inches finished width.

4. Swing hinged shower doors out from the shower stall. Hinged doors may swing into the shower stall if they also swing out. Sliding shower doors are also allowed.

Fire Separations

Fire Separation: Garage & Home

Many fires begin in garages. Unfortunately, garage fires often are more intense than fires that start elsewhere, because gasoline, cardboard, newspapers, and other flammable materials are usually stored in the garage. Fire safety is an important rationale for many IRC provisions. Because of this the IRC has special requirements to help prevent the spreading of garage fires into the home.

A fire-rated door with a minimum rating of 20 minutes is required in walls shared between a garage and a home.

VIOLATION! DO NOT install pet doors in doors that separate the garage from the dwelling.

Fire Separation Doors

In walls that are shared between your dwelling and your garage, use at least a 20-minute fire-rated door. These may be made from solid wood or honeycomb-core steel. Use doors that are at least 13/8 inch thick.

Doors in a garage wall may not open directly into a bedroom. You also may not install pet doors or other openings in doors or walls from a garage into the home unless the pet door or opening is listed to maintain fire separation. Install self-closing hinges on doors between the garage and the home.

Fire Separation Walls & Ceilings

Walls and ceilings that separate the home from the garage should be covered on the garage side with gypsum drywall that’s at least 1/2 inch thick. A garage must have a ceiling made of Type X drywall that’s a minimum of 5/8 inch thick if the garage is beneath a habitable room. (Type X has fibrous reinforcement to help the drywall maintain its integrity when exposed to high heat).

Maintain the same fire separation for drywall penetrations, such as attic scuttle holes, pull-down attic stairs, gas vents, and plumbing pipes, as provided by the gypsum drywall. Most pull-down attic stairs interrupt the ceiling fire separation, because the panel to which the stairs are attached is thin plywood. Seal penetrations between the garage and the home, such as pipes and ducts, with materials that resist the free flow of fire and smoke. Such materials include fire-resistant caulk.

Type X drywall is required on garage ceilings if the space above is habitable.

VIOLATION! Do not install pull-down stairs in a garage ceiling unless they maintain the required fire separation. The standard plywood covers do not maintain fire separation.

HVAC Ducts & Registers in Garages

Use at least 26-gauge sheet steel or other approved material to construct HVAC ducts that are installed in a garage and ducts that pass through garage walls and ceilings. Do not install HVAC supply or return air openings in the garage. This restriction does not apply to an independent HVAC system that serves only the garage. Do not use flexible HVAC duct or duct board to penetrate garage walls and ceilings. Flexible ducts and duct board may attach to steel ducts after the steel ducts penetrate the garage firewall.

Stairways

Interior and exterior stairways are regulated closely by most codes because they are inherently very dangerous parts of a house. Many of the regulations deal with lighting issues, including the type and location of fixtures and switches. The size, grippability, and location of handrails and railing balusters also account for much of the regulatory wording on stairways. Regulations for interior stairways also apply to exterior stairways. They include riser height, tread depth, and handrails and guards. It is important to comply with exterior stairway regulations, because they are used when wet or covered with snow and ice.

Interior Stairway Lighting & Switching

You should install as many light fixtures as necessary to illuminate all stairway landings and treads. The areas at the top and bottom of stairs are landings, so the lights should illuminate them too. For example, a light fixture at the top of a stairway may not provide enough light to illuminate the bottom landing, especially if the stairway changes direction. The light must be capable of illuminating treads and landings to at least 1 foot-candle.

NOTE: A foot-candle is a unit of light measurement approximating the amount of light you receive from a birthday cake candle when it is held 12 inches from your eyes. Photographer’s light meters may be used to measure foot-candles.

You must locate a switch for interior stairway lights at the top and bottom of all interior stairs with at least six risers. Only one switch is required for interior stairs with fewer than six risers. Locate all stair switches so they can be used without climbing any steps.

Exterior Stairway Lighting & Switching

Codes for outdoor stairway lighting differ somewhat from interior requirements and recommendations. In exterior areas, you must locate a light fixture near the top landing for stairs providing access to doors above grade level. You must also locate a light fixture near the bottom landing for stairs providing access to doors below grade level. Locate the switch inside the dwelling for exterior stairs.

Install a light switch at the top and bottom of stairways with at least six risers.

Install a light at the top landing of above-grade exterior stairs.

One light at a center landing may not be enough to illuminate the top and bottom landings.

Provide a finished width of at least 36” above the handrail and at least 311/2” at and below one handrail.

Stairway Width

1. Provide a finished stairway width of at least 36 inches above handrail to the minimum headroom height.

2. Provide a finished stairway width of at least 311/2 inches at and below the handrail for stairs with one handrail and at least 27 inches at and below both handrails for stairs with two handrails.

Riser Height

1. Provide a finished riser height of not more than 73/4 inches. Measure riser height vertically from leading edges of adjacent treads. The IRC does not mandate a minimum riser height.

2. Do not exceed 3/8-inch finished riser height difference between any two risers in a flight of stairs.

3. Do not allow open risers to fit a 4-inch-diameter sphere for passthrough. This includes interior stairs and exterior stairs, such as stairs for decks and balconies, but does not include spiral stairs.

4. Do not include the height of carpets, carpet pads, rugs, and runners when measuring riser height.

Maximum riser height is 73/4”. Maximum difference between two risers in a flight of stairs is 3/8”.

Open risers have the potential to trap the head of a small child. Do not allow an open riser to pass a 4” diameter sphere. Install filler strips to reduce riser opening size, beginning with the fourth riser.

Provide a tread depth of at least 10” if treads have a nosing or at least 11” if treads have no nosing.

Tread Depth

1. Provide a finished tread depth of at least 10 inches. Measure tread depth horizontally from the leading edges of adjacent treads and at a right angle to the tread’s leading edge.

2. Do not exceed 3/8-inch finished tread depth difference between any two treads in a flight of stairs. This does not apply to consistently shaped winder treads contained within the same flight of stairs.

Tread Nosing

1. Provide a finished tread nosing depth of at least 3/4 inch and not more than 11/4 inches for stairs with solid risers. Add the nosing depth to the 10-inch minimum tread depth. Tread nosing is not required if treads are at least 11 inches deep.

2. Do not exceed 3/8-inch finished tread nosing depth difference between any two treads for all treads between two stories, including at floors and landings. Note that this differs from the tread and riser maximum difference. The tread and riser differences are for a flight of stairs, and the nosing depth difference is for all treads between two stories.

3. Do not exceed 9/16 inch for the curvature radius of a tread nosing, and do not exceed 1/2 inch for the bevel of a tread nosing.

Tread Slope

1. Slope treads and landings not more than 2 percent from horizontal in any direction.

Winder Stair Treads

1. Locate the winder tread walkline at 12 inches from the inside of where the winder tread turns. Measure the tread depth at the widest point along the walkline.

2. Provide a finished winder tread depth of at least 6 inches at any point on a winder tread within the finished width of the stairway and at least 10 inches at the walkline.

3. Do not exceed 3/8-inch finished tread depth difference between any two treads in a flight of stairs measured at the walk line.

4. Do not compare the depth of winder treads to the depth of rectangular treads in a flight of stairs if: (a) the winder treads all have a consistent shape, and (b) the winder treads comply with the winder tread depth requirements. Winder treads will not have the same depth as the rectangular treads, so the winder tread depth will not be within 3/8 inch of the rectangular tread depth.

Stairway Headroom Height

1. Provide a finished stairway headroom height of at least 80 inches measured vertically from a sloped plane connecting the tread nosing or from the finished floor of a landing. Projections from the ceiling are permitted above the minimum finished headroom height.

Provide a tread nosing depth of at least 3/4” and not more than 11/4”. Do not exceed 9/16” radius for a curved nosing or 1/2” depth for a beveled nosing.

The step up from landings should be not more than 73/4”. Measure the step to the top of the threshold. Make landings at least as wide as the stairway and at least 36” deep.

Stairway Landings

1. Provide a landing or floor at the top and bottom of most stairs.

2. You are not required to provide a landing or floor at the top of interior stairs, including stairs in an attached garage, unless a door swings over those stairs. This means you may terminate a flight of interior stairs directly into a door if the door swings away from the stairs.

3. Do not exceed 151 inches vertical rise of a flight of stairs without providing a landing or a floor. Example: do not install more than twenty 73/8-inch-high risers without an intermediate landing.

4. Make rectangular and square landing widths at least as wide as the stairway. Example: if the stairway is 36 inches wide, build the landing at least 36 inches wide.

  1. Make rectangular and square landings depth at least 36 inches, measured in the direction of travel.

6. You may make landings with shapes other than rectangular or square if: (a) the depth of the landing at walk line is at least as wide as the stairway and (b) the total area of the landing is at least as large as a 1/4 circle with a radius equal to the required width of the landing. The walk line is 12 inches from the narrow side of the landing. The area of a circle is 3.14 multiplied by the circle’s radius squared. Example: the minimum area of a curved landing serving a 36-inch-wide stairway is calculated (36 in.2 × 3.14) × .25 = 1,017.9 square inches.

Guards: Definition

A guard is a barrier that protects occupants from falling from a raised surface, such as a stairway, deck, or balcony. Guards are often call guardrails when the guard also serves as a handrail; however, guards need not be an open rail. A guard may be a partial height solid wall, a partial height wall containing safety glazing, or any other structure that complies with IRC requirements.

Handrails & Guards: Location

1. Provide a handrail on at least one side of every continuous flight of stairs with four or more risers.

2. Provide a guard at raised walking surfaces more than 30 inches above an adjacent interior or exterior surface. Areas that require guards include porches, balconies, decks, hallways, screened enclosures, ramps, and the open sides of stairs with a total rise of more than 30 inches.

Height

1. Install the handrail at least 34 inches and not more than 38 inches above the treads measured vertically from a sloped plane connecting the tread nosing or from the finished floor of a ramp.

2. You may exceed the 38-inch maximum height where a handrail connects with a guard to provide a continuous structure. Example: a handrail connects to a guard at an intermediate stairway landing. The handrail height at the beginning and ending of the intermediate landing guard may exceed 38 inches high.

3. Provide guards at least 36 inches tall at raised surfaces other than the open sides of stairs.

4. Provide guards at least 34 inches high on the open sides of stairs. Measure the guards vertically from the nosing of the treads.

5. Limit the height of guards that are also handrails to not more than 38 inches. The IRC does not limit guard height other than for handrails.

Install a handrail on stairways with at least four risers. Provide a continuous handrail beginning above the first riser and ending at or above the last riser.

Install handrails at least 34” and not more than 38” above a sloped line connecting the stair treads.

The maximum space between guard vertical members is a 4”-diameter sphere. The maximum space for stairway guards is a 43/8” diameter sphere.

Install handrails that have the required gripping surface dimensions. Three of the above profiles will suffice. Handrails using 2 × 4 and larger lumber are too large to be grippable and thus do not meet the dimensions standard.

Continuity

1. Run the handrail continuously from at least a point directly above the top riser of the flight of stairs to at least a point directly above the lowest riser of the flight.

2. Begin and end all handrails with a newel post, volute, starting easing, or starting newel.

3. Project handrails at least 11/2 inches and not more than 41/2 inches from any adjacent wall.

4. You may interrupt a handrail with a newel post at a turn.

5. Provide continuous guards for open sides of the entire flight of stairs, even if some of the flight is less than 30 inches above an adjacent surface.

6. You need not provide a guard if the entire flight of stairs is less than 30 inches above an adjacent surface. This applies even if a lower flight of stairs connects with an upper flight of stairs at a landing. Example: a landing occurs before the last three risers of a stairway. The last three risers are a separate flight of stairs and do not require a guard or a handrail.

Shape

1. Use material with an outside diameter of at least 11/4 inches and not more than 2 inches for Type 1 circular handrails.

2. Use material with a perimeter dimension of at least 4 inches and not more than 61/4 inches and a cross-section dimension of not more than 21/4 inches for Type 1 non-circular handrails.

3. Provide Type 2 handrails that have a perimeter dimension greater than 61/4 inches with a graspable finger recess on both sides of the profile.

4. Apply handrail shape requirements to interior and exterior stairways, including stairways for decks and balconies.

Openings

1. Do not allow openings in horizontal guards to pass a 4-inch-diameter sphere.

2. Do not allow stair guard openings, such as balusters, to pass a 43/8-inch-diameter sphere.

3. Do not allow openings under stair guards formed by a riser, tread, and the guard’s bottom rail to pass a 6-inch-diameter sphere.

Handrails & Guards Live Loads

1. Install handrails and guards so they will resist a uniform distributed force of at least 200 pounds per square foot applied in any direction at any point along the top.

The maximum space in the triangle formed by a tread, riser, and stair guard bottom rail is a 6” diameter sphere.

Emergency Escape Openings

An emergency escape and rescue opening, commonly called an egress opening, is required in all bedrooms and in most basements. Codes are very specific concerning the minimum clearances of the openings and how they can be accessed, as well as how they can be exited from the exterior. Rooms that are not intended for sleeping typically do not need to meet egress requirements. You may use an operable window or a side-hinged or sliding door as the escape opening.

Escape Opening Locations

1. Provide at least one escape opening in every bedroom, including bedrooms above, at, and below ground level.

2. Provide at least one escape opening in most basements. You are not required to provide a basement escape opening if: (a) the basement area is not more than 200 square feet and (b) the basement is used only to house mechanical appliances.

3. Provide each basement bedroom with an escape opening. You are not required to provide other escape openings in basements in addition to the bedroom escape openings.

4. Open all escape openings directly onto an area that leads directly to a public way. This means that escape openings cannot open onto an enclosed courtyard or onto a similar area that does not lead directly and without obstruction to an area that is accessible by the public.

5. You may open an escape opening under a deck or porch if: (a) the escape opening can be opened to the full required dimensions and (b) the space under the deck or porch is at least 36 inches high.

6. Note that an escape opening may be required when converting a previously unfinished basement into finished space, especially if the finished space is a bedroom. Verify requirements with the local building official.

Egress windows allow emergency exit from a structure and must meet certain minimum size and accessibility codes. They are required primarily in bedrooms and basements.

Escape Opening Size

1. Provide escape openings with a clear opening area of at least 5.7 square feet. This includes escape openings above and below grade level. You may reduce an escape opening at grade level to at least 5.0 square feet.

2. Provide each escape opening with a clear opening at least 24 inches high and at least 20 inches wide.

3. Locate the sill of each escape opening not more than 44 inches above the finished floor. Measure the sill height from the finished floor to the where the clear opening begins (the bottom of the opening).

4. Measure escape opening height and width using the clear opening area, which does not include obstructions, such as window frames.

To satisfy building codes for egress, a basement window must have a minimum opening of 5.7 sq. ft. through one sash, with at least 20” of clear width and 24” of clear height. Casement, double-hung, and sliding window styles may be used as long as their dimensions for width and height meet these minimum requirements.

NOTE: If the window opening is the minimum in both dimensions, it will be too small; at least one dimension must be more than minimum to meet the code requirement.

Window & Area Wells

1. Provide all below-grade escape windows with a window well and below-grade escape doors with an area well. The following apply to both window wells and area wells.

2. Provide each well with at least a 9-square-foot clear opening area and a depth and width of at least 36 inches in each direction.

3. Install a permanent ladder if the well bottom is more than 44 inches below grade. Ladder rung specifications include: a rung width of at least 12 inches, a rung projection of at least 3 inches from the well wall, and a rung vertical spacing of not more than 18 inches apart. A ladder may encroach not more than 6 inches into the minimum well width or depth dimension.

Egress wells must be at least 36” wide and project 36” from the foundation. Those deeper than 44” must have a means of escape, such as an attached ladder or a tiered design that forms steps. Drainage at the bottom of the well should be connected to the foundation drain or to another approved drainage system.

Egress Doors

The egress door opens to the outside and meets all egress door requirements for accessibility and opening size. Every dwelling must have at least one egress door. The egress door is usually the front door. Other exterior doors need not comply with the egress door requirements.

Egress Door Requirements

1. Provide at least one egress door that: (a) is accessible from all areas of the home and (b) allows people to go directly outside without traveling through the garage.

2. Install a side-hinged egress door that provides a clear opening at least 32 inches wide and 78 inches high. Measure door width between the face of the door when open to 90 degrees and the outer edge of the door stop. Measure door height between the top of the threshold and the bottom of the stop. This means that a 36-inch by 80-inch door is required when using standard-size doors.

3. Provide a landing on the interior and exterior sides of the door. Build each landing at least as wide as the door. Example: if the door is 36 inches wide, then build each landing at least 36 inches wide. Build each landing at least 36 inches deep, measured in the direction of travel.

4. Build the interior and exterior landings not more than 11/2 inches below the top of the threshold.

5. You may build the exterior landing not more than 73/4 inches below the top of the threshold, if the egress door does not swing over the landing. You may build the exterior landing with not more than a 2 percent slope away from the door. You may have a storm door or a screen door swing over any landing.

6. Provide a ramp or a stairway to any egress door that is not at grade level.

Build a landing at least 36” deep on both sides of the egress door. You may build the exterior landing not more than 73/4” below the top of the threshold.

Exterior Doors

A landing area is required on both sides of exterior doors.

Exterior Door Landing Requirements

1. Provide a landing on the interior and exterior sides of exterior doors.

2. Build each landing at least as wide as the door served. Example: if the door is 36 inches wide, then build each landing at least 36 inches wide.

3. Build each landing at least 36 inches deep, measured in the direction of travel.

4. Build each landing not more than 11/2 inches below the top of the threshold.

5. You may build the exterior landing with not more
than a 2 percent slope away from the door.

6. You are not required to build a landing on the exterior side of a door if: (a) a stairway of not more than two risers is on the exterior side and (b) the exterior door does not swing over the stairway.

7. You may build an exterior landing not more than 73/4 inches below the top of the door threshold if the exterior door does not swing over the landing.

8. Provide a ramp or a stairway to any exterior door that is not at grade level.

9. You may have a storm door or a screen door swing over any stairway and landing serving as a door into the house.

10. You are not required to build a landing on the exterior side of a door that opens to a narrow, above-grade balcony or similar structure.

Door & Window Hazards

You may have seen pictures of people severely cut when they fell or were pushed through doors and windows containing regular glass. Regular glass usually breaks into large pieces that can cause severe injury. Safety glass shatters into very small pieces that are less likely to cause severe cuts.

General codes designate several locations as hazardous, where people could fall or be pushed through glass. These locations are mostly near doors, near water, and near stairs. A large window where the sill is close to the floor is also a hazardous location.

Safety glazing usually means tempered glass; however, other materials also qualify. This is why it is called safety glazing, not safety glass. Most safety glazing should be identified with permanent writing in one corner of the glazing. This writing can be very difficult to see, so look closely before deciding that glazing is not safety glazing.

Laminated glass is one type of safety glazing that has a clear membrane in the center layer to keep the shattered glass more or less in place when it breaks. Tempered glass is another common type of safety glazing.

Another window hazard involves children falling from windows where the sill is close to the floor. Recent general codes require a mechanism that prevents a child from opening these windows enough so that they can climb through them and fall.

Safety glazing and fall hazard rules are complicated and have many exceptions. Our objective here is to introduce the subject and point out some hazardous locations that you might encounter if you remodel or add to your home.

The sidelights on both sides of the door should contain safety glazing. Safety glazing is not required in the transom above the door.

Windows along stairways and at landings should contain safety glazing if the bottom edge of the glazing is less than 36” above the stair walking surface.

Safety Glazing In & Near Doors

1. Use safety glazing in doors, including swinging and sliding doors, outside doors, and interior doors such as French doors. Exceptions include decorative glazing, such as stained glass, and glazing in very small openings in the door.

2. Use safety glazing in windows that are within 24 inches on either side of a door. Exceptions include decorative glazing and windows when the bottom edge of the glazing is located 60 inches or more above the walking surface.

Safety Glazing Near Stairs & In Guards

1. Use safety glazing in guards, including guards at decks, balconies, raised walkways, and similar locations.

2. Use safety glazing in stairway handrail guards.

3. Use safety glazing in windows within stairways when the bottom edge of the glazing is less than 36 inches above the adjacent walking surface. Exceptions include if a handrail is between the stairs and the window and if the window is 36 inches or more away from the nearest part of the stairs.

4. Use safety glazing in windows within 60 inches of the last tread at the bottom of a stairway when the bottom of the glazing is less than 36 inches above the adjacent walking surface.

Windows above bathtubs and showers should contain safety glazing unless the bottom of the glazing is located 60” or more above the tub or shower floor.

Safety Glazing Near Wet Surfaces

1. Use safety glazing in bathtub and shower doors and enclosures.

2. Use safety glazing in walls, enclosures, and fences that are less than 60 inches horizontally from the edge of bathtubs, showers, swimming pools, whirlpool tubs, hot tubs, saunas, and steam rooms. Exceptions include windows when the bottom edge of the glazing is located 60 inches or more above the walking surface and windows that do not face the bathtub, etc.

Window Fall Protection

1. Install a means to restrict the distance that an operable window can open so that a 4-inch-diameter sphere cannot pass when: (a) the top of the window sill is less than 24 inches above the finished floor and (b) the top of the window sill is more than 72 inches above the exterior surface below.

2. You may comply with this provision by permanently restricting the window opening distance, except where the window serves as an emergency escape and rescue opening.

3. You may comply with this provision by installing a window opening control device that complies with ASTM F2090.

Ventilation & Exhaust

Controlling moisture levels in a home is important for your comfort and health, as well as for the health of your home. Although inadequate moisture levels can cause discomfort for some people and can cause furnishings and some construction materials to become brittle, it is not usually a significant risk to you or to your home, so the IRC has no provisions governing minimum moisture and humidity levels. Too much moisture, however, can be a significant risk to you and your home, so the IRC has several provisions governing the removal of excess moisture. Current indoor air quality best practices also encourage removal of excess moisture and other contaminants from the home.

The greatest threat posed by water vapor is that it provides one of the three things that mold needs to grow. The other two are the correct temperature and food. Mold grows at the same temperatures we humans prefer, so there is little we can do about that. Because mold eats almost any wood-based product and our homes are filled with these products, there is little we can do about the food risk. The one thing we can do something about is moisture.

Water vapor travels in the air. When water vapor condenses on visible surfaces, it provides the moisture that mold needs. We then see what is often called mildew. Mildew is another name for mold. When water vapor travels into attics and wall cavities, it can condense and provide moisture for mold. Mold can grow in these hidden spaces for long periods before it is discovered. Damage to your home and health can be significant when mold grows for long periods of time.

Water vapor is always present in every home. Some water vapor occurs naturally in the air. We introduce some water vapor into the home with every breath we take. Much of the water vapor in a home results from activities such as bathing, cooking, and clothes drying. The IRC has provisions that help remove the excess water vapor caused by these activities.

Moisture exhaust requirements generally are met with a combination of natural (windows and doors) and mechanical (ventilation fans) solutions. The bathroom and kitchen are the two rooms where ventilation is most critical.

Air Movement Requirements

1. Provide outdoor light and ventilation to bathrooms, toilet rooms, and similar areas using windows or doors containing glazing. Provide a total glazing area of at least 3 square feet with at least 11/2 square feet operable. Open the glazing directly onto a street, public alley, or onto a yard or court located on the same lot. Best practice is to equip every bathroom with a ventilation fan.

2. You may replace the glazing with artificial light and exhaust ventilation. Provide exhaust ventilation of at least 20 cubic feet per minute (cfm) continuous ventilation or at least 50 cfm for a switched ventilation fan.

3. Comply with the ventilation fan manufacturer’s instructions or general codes about exhaust duct type and length. Three-inch diameter duct may not be allowed as an exhaust duct. Four-inch diameter or larger duct may be required.

4. Discharge bathroom and toilet room ventilation fan exhaust directly outdoors. Discharging a ventilation fan exhaust duct into or toward an attic, soffit, or crawl space ventilation opening does not comply with this provision.

5. Terminate exhaust fans at least: (a) 3 feet from property lines, gravity air intake openings, operable windows and doors; (b) 10 feet horizontally or 3 feet above mechanical air intake openings (such as for a heat recovery ventilation unit).

6. Do not recirculate air from bathrooms within a residence or into another residence.

7. Provide an automatic or gravity-operated damper for exhaust systems that will close the damper when the system is not operating.

8. Do not direct outdoor exhaust openings, such as from bathroom and kitchen exhaust fans, onto a walkway.

9. Protect outdoor air intake and exhaust openings with a corrosion-resistant screen having openings at least 1/4 and not more than 1/2 inch or by louvers, dampers, or similar means. This does not include clothes dryer exhaust openings. Do not cover clothes dryer exhaust openings with a screen.

10. Protect outdoor openings against local weather conditions, such as rain and snow infiltration and blockage by snow accumulation.

Terminate exhaust ducts directly outdoors with a cover that protects against weather and pest infiltration.

VIOLATION! Do not terminate exhausts into attic or crawl space areas.

Kitchen Exhaust Requirements

General Installation Requirements

1. You need not install either a recirculating or an externally ducted kitchen exhaust hood; however, externally ducted kitchen exhaust hoods are recommended. Verify kitchen exhaust hood requirements with the local building official, because interpretation of kitchen exhaust hood requirements can vary among jurisdictions.

2. Terminate a kitchen exhaust hood duct, if any, to the outdoors when natural or mechanical ventilation is not provided in the kitchen area. Natural ventilation usually means an operable window in the kitchen area. Mechanical ventilation may be provided by a ducted central heating system that is connected to a ventilation opening terminating outdoors. Mechanical ventilation may be provided by a heat recovery or energy recovery ventilation system. Most homes have either natural or mechanical ventilation in the kitchen area, so external discharge of range hoods is rarely required.

3. You may, but are not required to, install a recirculating kitchen hood if the kitchen is provided with natural or mechanical ventilation.

4. Provide a backdraft damper at the duct termination or other approved location. Many kitchen hoods and cabinet-mounted microwave ovens have backdraft dampers integrated into the appliances.

Use galvanized metal ductwork for range hood ducts, and be sure to seal the joints very well so the airborne grease doesn’t escape into walls and cabinets, where it poses a fire hazard.

Aboveground Exhaust Duct Construction

1. Discharge the kitchen exhaust fan to the outdoors using a duct. Do not discharge the fan through a framed cavity.

2. Use galvanized steel, stainless steel, or copper to construct kitchen exhaust ducts.

3. Seal the exhaust duct air tight to avoid leaking flammable grease into wall or floor cavities or between the kitchen exhaust hood and the kitchen cabinet.

Externally exhausted range hoods are not required by codes except in very rare situations. Typical cabinet-mounted models, such as the one seen here, are quite popular, however, and are recommended whenever practical.

Exhaust Duct Termination

1. Terminate kitchen exhaust hood ducts outside the building. This does not include attics and crawl spaces.

2. Provide a backdraft damper at the duct termination or other approved location. Many kitchen exhaust hoods and cabinet-mounted microwave ovens have backdraft dampers integrated into the equipment.

Kitchen Exhaust Fan Rates

1. Provide an exhaust rate of at least 100 cfm for intermittently operated exhaust hoods or at least 20 cfm for continuously operating exhaust hoods.

2. Provide makeup air for exhaust fans with a capacity of more than 400 cfm. Install a gravity operated or an electrically operated damper to open and close the takeup air duct.

Replacing a Range Hood with a Microwave Oven

This is a popular upgrade that is often installed incorrectly. Failure to read and follow manufacturer’s instructions can be a fire hazard and a burn hazard. It can also reduce the microwave’s service life. The following address some of the most frequent installation errors.

1. Leave enough space between the microwave and the range top. A typical instruction is to have at least 66 inches between the floor and the top of the microwave, at least 30 inches between the range top and the bottom of the cabinet, and at least 2 inches between the bottom of the microwave and the range control panel.

2. Connect the microwave to a dedicated 120-volt circuit. Most microwaves should be served by a 20-amp circuit.

3. Plug a microwave that comes with an attachment plug into a receptacle. Do not connect the microwave directly to the electrical wires, and do not use an extension cord.

4. Use the size and type of exhaust duct material and termination fittings specified by the microwave manufacturer. Do not exceed the exhaust duct effective length specified by the manufacturer. Effective length adds for the losses created by elbows and termination fittings.

5. Connect the microwave to the exhaust duct. Do not simply blow the exhaust at the hole in the cabinet where the exhaust duct is located.

6. Install the backdraft damper if one is supplied with the microwave.

Downdraft ventilation is a space-saving alternative to exhaust hoods, often used on kitchen islands with built-in cooktops. It is less efficient but will mitigate some of the cooking vapors and airborne particulate matter.

Many manufacturers recommend at least 66” between the floor and the top of the microwave.

Clothes Dryer Exhaust Requirements

General Installation Requirements

1. Construct, install, and terminate clothes dryer exhaust ducts according to the clothes dryer manufacturer’s installation instructions. If the clothes dryer manufacturer is not known during construction, use general requirements.

2. Do not connect clothes dryer exhaust ducts to any other system, such as bathroom exhaust fan ducts, plumbing vents, or fuel-burning equipment vents and flues.

3. Do not install clothes dryer exhaust ducts in or through any fireblocking-, draftstopping-, or fire-resistance-rated assembly, unless the duct is constructed and installed to maintain the code that requires fireblocking or draftstopping.

4. Do not run clothes dryer exhaust ducts into or through other ducts or plenums. Example: do not run a clothes dryer exhaust duct into or through an HVAC supply or return duct or into or through a combustion air duct.

5. Install the clothes dryer exhaust duct during construction if space for a clothes dryer is provided.

6. You may install a dryer duct booster fan to extend the dryer exhaust duct’s length. Install the fan according to the fan manufacturer’s instruction.

Duct Construction

1. Use a 4-inch-diameter, smooth wall metal duct that is at least 28 gauge, unless the clothes dryer manufacturer’s instructions allow another diameter.

2. Install duct joints so that the inside part of the joint fits into the outside part of the joint in the direction of the air flow.

3. Fasten duct joints with mechanical fasteners, such as screws or pop rivets. Do not use screws or other fasteners that penetrate the duct more than 1/8 inch. Longer fasteners could trap lint.

4. Seal the duct joints with metal tape or mastic.

5. Support the duct at least every 12 feet. Joints and elbows are vulnerable areas for separation.

6. Protect the duct with at least 16-gauge shield plates if the duct is within 11/4 inches from the edge of a framing member. Extend the shield plate at least 2 inches above sole plates and below top plates. Protect the duct with shield plates at any other location where it is likely to be penetrated by fasteners.

Limit clothes dryer exhaust duct developed length to not more than 35’.

Use strap hangers to support rigid ducts. Install hangers at joints at intervals not exceeding 12’.

Duct Length

1. Do not exceed 35 feet developed length between the beginning of the clothes dryer duct and the duct termination, unless the clothes dryer manufacturer’s installation instructions allow a longer length. Developed length means the straight line length of the duct, reduced by bends in the duct. The clothes dryer manufacturer is rarely known during construction, so the manufacturer’s installation instruction exception rarely applies.

  1. Add 21/2 feet for every 45-degree bend and 5 feet for every 90-degree bend to the dryer duct’s developed length. You may use the manufacturer-provided developed length for smooth radius bends. You may use the IRC table for smooth radius bend developed length if the manufacturer’s instructions are not available.

3. Do not include the transition duct in the dryer duct developed length.

4. Locate a permanent label within 6 feet of the clothes dryer exhaust duct connection that shows the exhaust duct’s developed length. This requirement applies only when the duct developed length is more than 35 feet.

Duct Termination

1. Terminate clothes dryer exhaust ducts outside the building. Outside the building does not include attics or crawl spaces.

2. Locate the clothes dryer exhaust duct termination at least 3 feet from: (a) the property line and (b) operable and non-operable openings. Operable openings include windows and doors. Non-operable openings include eave ventilation openings and combustion air openings. This provision does not apply if the clothes dryer manufacturer’s installation instructions allow other locations. The clothes dryer manufacturer is rarely known during construction, so the manufacturer’s installation instruction exception rarely applies.

3. Provide a backdraft damper at the duct termination or at another approved location.

4. Do not install a screen at the exhaust duct termination. A screen will trap lint.

5. Make the open area of the exhaust duct termination at least 12.5 square inches.

Transition Duct

1. The transition duct is the duct (usually flexible duct) between the dryer and the start of the smooth wall dryer exhaust duct.

2. Limit the transition duct length to 8 feet.

3. Use only one piece of transition duct. Do not splice together two or more lengths of transition duct material.

4. Do not run the transition duct through walls or in concealed spaces.

Clothes Dryer Makeup Air

1. Provide makeup air for clothes dryers that exhaust more than 200 cubic feet per minute. General codes do not specify how to provide makeup air or specify that the makeup air come from outdoors.

2. Provide a net free opening of at least 100 square inches when clothes dryers are installed in closets or provide makeup air by other approved means.

Use and install transition ducts according to the clothes dryer’s instructions. Replace plastic transition ducts (bottom) with flexible metal transition ducts (top).

Cut the transition duct to the shortest length possible. Eliminate bends and kinks that will reduce air flow.

Smoke & Carbon Monoxide Alarms

Smoke alarms and carbon monoxide (CO) alarms have been required in houses for many years. Combination smoke and CO alarms are not preferred, because the service life of the different alarms are different, meaning that one alarm could fail before the other.

You should replace old smoke and carbon monoxide alarms. Smoke alarms have a useful life of about 10 years. Carbon monoxide alarms have a useful life of about 7 years. Install carbon monoxide alarms near all bedrooms and inside bedrooms with a fuel-burning appliance, such as a gas fireplace.

Smoke alarms and carbon monoxide (CO) alarms have been required in houses for many years. Carbon monoxide alarms (A) are triggered by the presence of carbon monoxide gas. Smoke alarms are available in photoelectric and ionization models. In ionization alarms (B), a small amount of current flows in an ionization chamber. When smoke enters the chamber, it interrupts the current, triggering the alarm. Photoelectric alarms (C) rely on a beam of light, which when interrupted by smoke triggers an alarm. Heat alarms (D) sound an alarm when they detect areas of high heat in the room. Also available are combination smoke/CO alarms and ionization/photoelectric smoke alarms. The combination ionization/photoelectric alarms are recommended, because they detect smoke from different types of fires.

Install smoke alarms in and near all bedrooms and on all levels of a home.

Smoke & CO Alarm Required Locations

1. Locate a smoke alarm: (a) in every bedroom; (b) outside all bedroom areas in the immediate vicinity (usually about 10 feet) of all bedrooms; (c) on every level in the home, including basements; and (d) within 3 feet horizontally from the door of a bathroom containing a tub or a shower.

2. Do not install an ionization smoke alarm closer than 20 feet horizontally from a permanently installed cooking appliance. Do not install a photoelectric smoke alarm closer than 6 feet horizontally from a permanently installed cooking appliance.

3. You may substitute a security system that includes smoke alarms if it provides the same protection as hard-wired smoke alarms. The security system smoke alarms must: (a) comply with the National Fire Protection Association (NFPA) 72 standard and (b) must be a permanent fixture in the home. Security system smoke alarms installed as a substitute system cannot be leased. They must be a permanent part of the home.

4. You are not required to locate smoke alarms: (a) in crawl spaces and in uninhabitable attics, and (b) on the middle level of split-level homes if smoke alarms are installed on the upper level, if the middle level is less than one story below upper level, and if there is no door between levels. Note that some jurisdictions require smoke alarms on all levels of a split-level home.

Smoke Alarm Power Source

1. Install smoke alarms that take primary power from the building electrical wiring and that have a battery backup.

2. Connect all smoke alarms together so one alarm activates all alarms (interconnection). Physical interconnection is not required if the alarms are listed for wireless interconnection.

3. Provide arc-fault circuit-interrupter protection for the smoke alarm primary power.

Do not locate a smoke alarm closer than 4” to the intersection of a wall and ceiling. The smoke alarm may not detect smoke in this dead air zone.

Smoke Alarm Installation

1. Install smoke alarms according to manufacturer’s instructions. This often includes locating the smoke alarm on the ceiling or on a wall not more than 12 inches from the ceiling. Do not locate a smoke alarm closer than 4 inches to the intersection of a wall and ceiling. The smoke alarm may not detect smoke in this dead air zone.

Smoke Alarm & CO Alarm Updates When Remodeling

1. Update the entire smoke alarm and carbon monoxide alarm system to current code requirements (including alarm interconnection and hard-wiring) when building alterations, repairs, or additions require a permit. This update requirement does not apply to: (a) exterior work such as roofing, siding, window, and door repair and replacement, (b) installation of or repairs to plumbing and HVAC systems, and (c) situations where access does not exist to allow installing electrical wires that would provide power and interconnection to the carbon monoxide alarms.

Carbon Monoxide Alarm Requirements

1. Install carbon monoxide alarms in homes equipped with fuel-fired appliances, such as gas and oil-fired furnaces, and in homes with an attached garage or a fireplace. The alarms must comply with UL2034.

2. Install an alarm outside of bedroom areas in the immediate vicinity (usually about 10 feet) of all bedrooms.

3. Connect all carbon monoxide alarms together so one alarm activates all alarms (interconnection). Physical interconnection is not required if the alarms are listed for wireless interconnection.

4. Install carbon monoxide alarms in a bedroom if a fuel-fired appliance is located in the bedroom or in an attached bathroom.

Structural Components

A safe and healthy building begins with a solidly built structure. The building’s foundation should rest on stable soil and should be strong enough to support the home during normal conditions as well as during disasters, such as hurricanes and earthquakes. The building’s floors, walls, and roof should be secured to the foundation and to each other and should be strong enough to support the home during extreme conditions.

This chapter will help you understand basic structural requirements for building as defined by the building codes. The intent is to help you identify work that may violate building codes so that you can bring it to the attention of a contractor or other qualified professional. Except for projects such as simple decks and storage sheds, you should seek guidance from qualified professionals before using the information in this chapter to design you own buildings or to perform structural remodeling on existing buildings.

In this chapter:

Foundations

Crawlspaces

Decks

Floor Systems

Wall Systems

Wall Penetration Flashing

Roof Systems

Special Requirements for High Wind & Seismic Risk Areas

Seismic Design Areas

1. Provide increased strength and structural integrity for foundations, walls, roofs, gas pipes and appliances, and other components in seismic design areas. Refer to the IRC and consult a qualified engineer or other qualified professional when building in seismic design areas.

2. Verify the seismic design category with the local building official. The following may be in seismic design areas: large parts of Alaska, California, Hawaii, Nevada, Oregon, and Washington State; small parts of Arizona, Colorado, Idaho, Montana, New Mexico, New York, and Utah; the area near Memphis, Tennessee, and the area near Charleston, South Carolina.

High Wind Design Areas

1. Provide increased strength and structural integrity for foundations, walls, roofs, windows, and other components in high wind design areas. Refer to the IRC and consult a qualified engineer or other qualified professional when building in high wind design areas.

2. Verify the wind design category with the local building official. The following may be in high wind design areas: much of Florida and Hawaii; the areas within about 100 miles of the coastlines of Alabama, Alaska, Georgia, Louisiana, Mississippi, North and South Carolina, Texas, and Virginia; the areas within about 50 miles of the coastlines of Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, and New York. Several “Special Wind Areas” exist in scattered areas of the country. These areas are mostly in mountainous areas and in the West.

Hurricane ties. If building codes in your area require them, nail metal hurricane ties to the wall top plates before installing the rafters.

Deflection of Structural Components

Most readers should not deal with bending of structural components, such as floors, walls, ceilings, and roofs. Leave this to qualified engineers and contractors. Because “spongy” floors and rattling walls are common complaints, this section explains some basic concepts involved in deflection and helps you understand when deflection may be excessive.

Deflection & Loads: Definitions

Deflection is when a component of a building bends under a load. It can be a single component, such as a floor joist, or it can be a system, such as a floor or a wall. Deflection causes a component to compress on one side (compression) and expand on the other side (tension).

A load is a force (weight) placed on a component of a building. Example: a building’s foundation carries the load of the entire building. The dead load is the weight of the construction materials, such as drywall, shingles, siding, and floor coverings, and the weight of fixed equipment, such as a water heater. The live load is the weight of people and furnishings that occupy a building. A point load is a load in a small area. The heel of a high-heel shoe is an example of a point load. Environmental loads include wind, snow, and forces created during earthquakes.

A point load is a type of live load that is concentrated in a small area, such as a footstep. Point loads are temporary, and in many cases they can exceed the deflection minimums without causing any particular problems.

Deflection Under Live Load

1. Install structural components, such as joists, studs, and rafters, so that they will not bend more than the amount shown in Table 1 under an evenly distributed live load. L is the unsupported length of the component in inches. H is the unsupported height of the component in inches. Example: for a bedroom floor, the general codes assume that a live load of at least 30 pounds of people, floor coverings, and furnishings will be placed over each square foot of the floor area. Example: the maximum deflection of bedroom floor joists with the length between supports of 180 inches would be 180/360, or 1/2 inch.

Foundations

Soil Load-Bearing Capacities

1. Place structural footings on undisturbed soil of known bearing capacity or on a bed of fill material approved by an engineer.

2. Have a geotechnical engineer evaluate the soil in areas known to have expansive or other unfavorable soils or if the soil-bearing capacity is unknown. Beware of clay soils. Some clay soils are unstable and can cause serious foundation problems.

3. Use the following table to estimate soil-bearing capacity if the soil type is known and if the local building official approves.

Common Soil Types

Gravel and sandy gravel soils have a presumed 3,000 psi load-bearing capacity.

Sandy soils have a presumed 2,000 psi load-bearing capacity.

Clay and silt soils have a presumed 1,500 psi load-bearing capacity.

Footing Width & Depth

Footing Width

1. Use the tables in general codes to determine the minimum footing width and depth required to support load-bearing walls. You may also use material found in The American Concrete Institute document ACI 332 (see Resources).

2. Refer to general codes for special footing and footing reinforcement requirements in seismic design areas.

Footing Thickness & Slope

1. Make spread footings at least 6 inches thick.

2. Project spread footings at least 2 inches beyond the foundation wall. Do not project the footing beyond the foundation wall more than the thickness of the footing. Example: if the footing is 6 inches thick, then the edge of the footing should be not more than 6 inches beyond the edge of the foundation wall.

3. Locate the bottom of footings at least 12 inches below finish grade or below the local frost line, whichever is deeper. This does not apply to accessory buildings with an area 600 square feet or less and an eave height of 10 feet or less, and this does not apply to decks not supported by the home.

4. Do not place footings on frozen ground unless the frozen condition is permanent (permafrost).

5. Make the top surface of footings level.

6. You may slope the bottom of footings not more than 10 percent, without reducing the minimum thickness.

7. Make step footing thickness at least 6 inches. Make step footing height not more than the length of the footing above the step.

Leveling footing forms is very important. Measure footing depth and width at the top of the forms. Here, batterboards and strings are used to level footing forms.

Spread footing for basement or crawlspace (A), interior load-bearing wall footing (B), or step footing (C).

Specifications for Foundation Concrete

Concrete in Basement Slabs & Interior Slabs-on-Grade (Not Garage Floors)

1. Use at least 2,500 psi concrete in all weathering potential environments.

2. Use air-entrained concrete (between 5 and 7 percent total air content) in severe weathering potential environments if the concrete may be subject to freezing and thawing during construction.

Concrete in Foundation Walls, Exterior Walls & Other Vertical Concrete Exposed to Weather

1. Use at least 2,500 psi concrete in environments with negligible weathering potential.

2. Use at least 3,000 psi air-entrained concrete (between 5 and 7 percent total air content) in moderate and severe weathering potential environments.

Concrete in Porches, Garage & Carport Floors & Other Horizontal Concrete Exposed to Weather

1. Use at least 2,500 psi concrete in environments with negligible weathering potential.

2. Use at least 3,000 psi air-entrained concrete (between 5 and 7 percent total air content) in moderate weathering potential environments.

3. Use at least 3,500 psi air-entrained concrete (between 5 and 7 percent total air content) in severe weathering potential environments.

4. You may use at least 4,000 psi air-entrained concrete with at least 3 percent total air content in steel-troweled garage floors in moderate and severe weathering potential environments.

Confirm with the concrete provider that the product you’ve ordered meets specs for your area, and be sure to have your forms inspected and approved well in advance of the delivery.

Foundation Anchors

1. Install at least 1/2-inch-diameter bolts in exterior footings, stem walls, basement walls, interior braced walls, monolithic slabs, and other places to which sill or sole plates for load-bearing and braced walls will be attached.

2. Install and tighten a nut and washer on each bolt. Verify washer size with your local building official.

3. Locate the bolts at least seven bolt diameters and not more than 12 inches from the ends of each plate and not more than every 6 feet on center in between.

4. Locate bolts in the middle third of the plate.

5. Install at least two bolts per plate section.

6. Embed the bolts at least 7 inches into the foundation.

7. Use approved fasteners to anchor the sole plates of interior load-bearing walls that are not braced walls.

8. You may substitute anchor straps for bolts if they provide equal anchorage. Place straps in the same locations as bolts, or per strap manufacturer’s instructions.

9. Refer to general codes for foundation anchor exceptions involving braced walls 24 inches long and shorter. These walls may require 1 or 0 foundation anchors.

Install 1/2”-diameter anchor bolts every 6’, not more than 12” from the end of each bottom plate, and in the middle 1/3 of the plate.

You may substitute anchor straps for anchor bolts.

Crawlspaces

Crawlspace Ventilated to Exterior

1. Provide at least 1 square foot of net free ventilation area for every 150 square feet of crawlspace floor in a ventilated crawlspace. You may reduce the net free ventilation area to at least 1 square foot for every 1,500 square feet of crawlspace floor if you cover the floor with a vapor retarder, such as 6-mil polyethylene sheeting.

2. Install covers in the ventilation openings. Use screens, grates, grills, or plates with openings at least 1/8 inch and not more than 1/4 inch.

3. Subtract the space used by opening covers from the net free ventilation area of a ventilation opening. Example: a 1-square-foot opening may be reduced to an effective 2/3-square-foot opening when covered by a cast iron grill or grate. The cover manufacturer’s instructions should indicate the cover’s opening reduction amount.

4. Locate a ventilation opening not more than 3 feet from every corner of the crawlspace wall.

5. There is considerable controversy about the effectiveness of crawlspace ventilation, particularly in warm, humid climates. Check with a qualified energy efficiency professional before adding insulation between floor joists in crawlspaces. Check the condition of existing floor joist insulation in crawlspaces at least annually.

Unventilated crawlspaces are recommended by experts for most crawlspaces.

Unventilated Crawlspace

1. You may eliminate crawlspace ventilation openings by insulating the crawlspace walls or floor system as required by general codes and by installing all the following moisture control and ventilation components:

(a) Cover all exposed soil in the crawlspace floor with an approved vapor retarder, such as 6-mil, preferably thicker, polyethylene sheeting.

(b) Lap all vapor retarder seams by at least 6 inches, and seal or tape the seams.

(c) Extend the vapor retarder at least 6 inches up the crawlspace wall, and attach and seal the vapor retarder to the wall.

(d) Provide one of the following ventilation methods:

• continuous mechanical exhaust ventilation

• a conditioned air supply at a rate of 1 cfm for every 50 square feet of crawl space floor area and provide a return air opening to the building interior

• dehumidification designed to provide at least 70 pints of moisture removal per day for every 1,000 square feet of crawlspace floor area

2. Do not connect the return air opening for the building interior to a forced-air return duct. Use an opening in the floor or use an unpressurized duct between the crawl space and the building interior.

3. There is some controversy about providing conditioned air to a crawl space. Do not exceed the 1 cfm conditioned air ventilation rate.

Ventilation Opening Locations

Provide 1 sq. ft. of ventilation for every 150 sq. ft. of crawlspace soil floor area or 1 sq. ft. for every 1,500 sq. ft. of vapor-retarder-covered floor area.

Unventilated and insulated crawlspaces often perform better than ventilated crawlspaces.

Decks

Most decks are relatively simple structures, but even a basic deck project must conform to the requirements of building codes in your area. In fact, virtually every aspect of your deck—from its location on your property to the design you choose and the materials you buy to build it—must meet stringent guidelines for safety. Codes vary, sometimes significantly, among jurisdictions. Your local building inspector can provide you with a list of the relevant deck codes and help you interpret them so you can create code-compliant plans for your deck project. You may also want to download a free PDF copy of the “DCA6-12 Prescriptive Residential Deck Construction Guide” (see Resources).

Meet or exceed all lumber size codes. For example, use lumber that is at least 4 × 4” posts for decks up to 8’ above the footing and 6 × 6” posts for decks up to 14’ above the footing.

General Deck Building Guidelines

1. Use hot-dipped zinc-coated galvanized steel for all fasteners (nails and screws) and hardware (joist hangers and support post caps and bases). Stainless-steel fasteners and hardware are recommended when building decks near water, and are required for decks located within 300 feet from saltwater.

2. Drill holes for bolts at least 1/32 inch and not more than 1/16 inch larger than the bolt. Predrill holes for 1/2-inch-diameter and larger lag screws.

3. Use hot-dipped zinc-coated galvanized steel or flexible flashing material when installing flashing at the deck ledger. Be sure that the flexible flashing is approved for exposure to sunlight. Do not use aluminum flashing.

4. Use at least #2 grade preservative-treated lumber or #2 grade naturally durable lumber for deck structural members. Lumber for deck structural components should be rated for ground contact, UC4A or better. You may use approved composite materials for components, such as deck flooring and railings. Read and follow manufacturer’s instructions when using composite materials.

5. Field-treat cuts, holes, and notches in preservative-treated wood with an approved preservative, such as copper napthenate.

6. Consult with the building inspector or a qualified engineer when building decks in seismic and high wind zones, in areas with heavy snowfall, and when building complex decks, such as multi-level decks.

Deck Ledger Attachment to the Home

1. Install a preservative-treated #2 grade or better Southern Pine or Hem Fir deck ledger board that’s at least a 2 × 8 in size.

2. Secure the deck ledger to one of the following band or rim joists: (a) 2-inch-thick (11/2-inch actual thickness) SPF sawn lumber, (b) 1 inch minimum thickness by 91/2 inches deep Douglas fir laminated veneer lumber, or (c) another approved engineered material.

3. Secure the band or rim joist to sawn lumber joists or wood I-joists that are perpendicular to the band or rim joist.

4. Use hold-down tension devices to provide lateral load connections. You may use one of the following methods.

(a) Install two 1,500 pound hold-down tension devices according to the device manufacturer’s instructions.

(b) Install four 750 pound hold-down tension devices according to the device manufacturer’s instructions.

5. Support the band or rim joist directly on the foundation or on a wall supported directly on the foundation. Do not support the band or rim joist using a cantilevered structure, such as a bay window or a framed chimney. Do not support the band or rim joist on veneer, such as masonry and stone.

6. You may use other methods and materials when the details are designed by a qualified structural engineer.

7. You may make a deck entirely self-supporting as an alternative to attaching the deck to the home.

Hang a double joist between joists to support the deck in areas where obstructions won’t allow a ledger.

Do not attach the ledger directly to siding or other wall coverings. Remove all wall coverings in the installation area so you can attach the ledger to the wall framing members. Cut the siding with a circular saw, and finish the corners with a chisel. Do not attach the ledger to brick or stone wall coverings. A self-supporting deck may be necessary.

Lateral load connector hardware should be attached to the deck joists and house rim joist to minimize lateral sway. A Simpson Strong-Tie DTT1 connector is seen here. Photo courtesy Simpson Strong-Tie

Deck Ledger Attachment Using Screws or Bolts

1. Install the screws or bolts in the deck ledger board and in the band joist or rim board according to Table 5A. Stagger the screws or bolts vertically along the length of the deck ledger board.

2. Install at least 1/2-inch hot-dipped galvanized lag screws or machine bolts (not carriage bolts) as specified in Table 3B.

NOTE: there are proprietary screws that are thinner than 1/2 inch and are approved for attaching deck ledgers to the home. Read and follow the manufacturer’s instructions if you use these screws.

3. Install a washer on each end of the machine bolts and a washer on the head end of the lag screws.

4. Make the distance between the interior face of the ledger board and the exterior face of the band board (rim joist) not more than 1 inch.

5. Use lag screws that are long enough to penetrate the band or rim board but not long enough to penetrate through the interior wall.

Deck Footings

1. Place the bottom of footings for deck support posts below the local frost line. You do not need to place deck footings below the frost line if the deck is not attached to the home (but it is best practice to do so anyway).

2. Place the bottom of footings for deck support posts that are within 5 feet from the house at the same level as the house footings.

3. Refer to DCA-6 or local codes for footing size and thickness.

4. Space footings as required for beam support. See the DECK BEAMS section shown here.

Install staggered fasteners on the ledger board using spacing specified in Table 3B.

Deck Joists

1. Use the correct size joist hanger to attach joists to ledgers and beams.

2. Fasten joist hangers using the size and type of fastener specified by the joist hanger manufacturer. In general, place a fastener in every round and oblong hole.

3. Support joists on a joist hanger (the joist should be fully seated in the hanger), on at least 11/2 inches of wood, or on at least 3 inches of concrete or masonry.

4. You may use three 8d nails to fasten joists that bear on top of a beam to the beam if the deck is supported by the house. Best practice is to use hurricane clips to fasten all joists to a beam.

5. Secure the rim joist to the deck floor joists using at least three 10d nails or three #10 × 3-inch wood screws.

6. Use Table 3C or local codes to determine the correct joist span and on center spacing.

Measuring Deck Joist Span

You may toenail joists to a beam only if the deck is attached to the house. Best practice is to secure joists to the beam using a hurricane clip.

Rim joist connections. Attach rim joists to the end of each joist with three #10 × 3” minimum wood screws. Secure decking to the top of rim joists with two #10 × 3” wood screws in each piece of decking to attach the decking to each joist.

Ledgers and block walls. When fastening ledgers to hollow concrete block walls, the block cells in the ledger attachment areas must be filled with concrete or grout. Secure the attachment bolts to the wall with approved epoxy anchors with washers.

Deck Beams

1. Fasten beam members to each other using two staggered rows of at least 10d nails spaced not more than 16 inches on center.

2. Place splices between beam members above deck posts.

3. Use Table 3D or local codes to determine the correct beam span and on-center post spacing.

Fasten beam members using two staggered rows of 10d nails at 16” on center. Fasten 3-member beams from both sides of the beam.

Deck Posts

1. You may use preservative-treated 4 × 4 wood posts for decks up to 8 feet tall and 6 × 6 posts for decks up to 14 feet tall. Measure post height from the top of the footing to the bottom of the beam.

2. Consult with the building official or an engineer about wood deck support posts taller than 14 feet and about support posts that are not preservative-treated wood, such as steel posts.

3. Secure the post to the footing. You may embed the post in the footing; however, this is not recommended because the post may deteriorate over time. Best practice is to use a post base.

4. Secure the post to the beam as described in the photo caption (right).

One way to attach a beam to a 6 × 6 post is to notch the post and secure the beam using 1/2”-diameter galvanized steel machine bolts and washers. Or, you can mount beams on top of posts with galvanized post cap hardware.

Joists may not be attached to posts with through bolts, even when mortises are cut into the posts to house the joists.

Deck Flashing

1. Install flashing between the deck ledger and the house when the deck is attached to the house. Proper flashing is essential. A common cause of deck collapse is the deck pulling away from rotted wood caused by improper flashing.

Best Practice for Installing Deck Flashing

Deck flooring made from composite materials may last longer and require less maintenance than wood flooring. Install composite materials according to the manufacturer’s instructions.

Deck Flooring

1. You may use 2-inch-thick (nominal) wood, 11/4-inch-thick wood (5/4 board), or other listed deck flooring (wood composites, metal) material as deck flooring.

2. Do not install 2-inch-thick flooring across joists that are more than 24 inches on center when the flooring is perpendicular to the joist or more than 16 inches on center when the flooring is diagonal (maximum 45 degrees) to the joist.

3. Do not install 11/4-inch-thick flooring across joists that are more than 16 inches on center when the flooring is perpendicular to the joist or more than 12 inches on center when the flooring is diagonal (maximum 45 degrees) to the joist.

4. Install two 8d threaded nails or two #8 × 3-inch wood screws per floorboard in each joist.

5. Install flooring across at least 4 joists.

6. Leave about 1/8 inch between flooring boards, including at the ends, to allow for drainage and for expansion.

7. Install other listed deck flooring material according to manufacturer’s instructions.

Deck Stairs Recommendations

1. Use 2 × 12 #2 or better Southern Pine or equivalent lumber for deck stair stringers.

2. Leave at least 5 inches of uncut wood when cutting the stair risers and treads into the stringers. Do not cut the stringer past the riser and tread.

3. Do not exceed 6 feet of unsupported length for deck stair stringers where the risers and treads are cut into the stringer (cut stringers).

4. Do not exceed 13 feet, 3 inches of unsupported length for deck stair stringers where the risers and treads are not cut into the stringer (solid stringers).

5. Measure stringer length horizontally. You may support long stringers near the center to reduce the unsupported length.

6. Provide a solid landing, such as concrete, at the bottom of deck stairs. Support the stringers on the landing or by appropriate footings.

7. Support the entire stringer plumb cut at the top landing on the deck rim board or by other approved means.

8. Attach the stringers to the top landing support using hangers or brackets. Do not rely only on nails or screws to attach stringers to supports.

9. Do not exceed 18 inches of unsupported length for deck stair treads using 2 × 4 or 5/4 Southern Pine. Refer to DCA-6 for maximum stair tread lengths for other lumber sizes and species. Install treads made from composite materials according to manufacturer’s instructions.

1. Refer to the guards and handrails section of this book for general guidelines about installing guards and handrails for decks. The guidelines for interior guards and handrails apply to exterior guards and handrails too (see here).

2. Space deck guard 4 × 4 support posts at least every 6 feet. This also applies to stair guards and handrails.

3. Secure the deck guard support posts to deck floor joists using at least 1/2-inch-diameter bolts and attachment hardware. Do not rely only on the deck band and rim boards to secure deck guard support posts.

4. Refer to DCA-6 or attachment hardware manufacturer’s instructions for information about attaching deck guard support posts if the posts do not line up with deck floor joists.

Cut stringers (above) should be supported every 6’. Solid stringers (bottom) should be supported every 13’ to 3”.

Attach stringers to support using a hanger, not just nails.

Deck Bracing Recommendations

1. Install bracing between the deck support posts and the deck beam on all decks that are more than 2 feet above the ground.

2. Install bracing between the deck support posts and a deck rim board, floor joist, or blocking on free-standing decks that are more than 2 feet aboveground.

3. Use 2 × 4 or larger lumber for the brace.

4. Secure the braces using at least 3/8-inch-diameter bolts with washers on both ends.

5. Secure the brace at least 2 feet away from the support post.

Deck guard support posts should be secured using attachment hardware for long-term strength.

Bracing is recommended to reduce movement that can weaken the deck and cause it to collapse.

Floor Systems

Floor Joist Span Tables (Selected)

1. Use 30 psf live load and 10 psf dead load for joists under bedrooms and in attics with access by permanent stairs, in most cases. Permanent stairs do not include pull-down folding attic ladders.

2. Use 40 psf live load and 10 psf dead load for joists under living areas, other than bedrooms, and under decks, and balconies, in most cases.

3. Use L/360 deflection (length of joist span in inches divided by 360) for all floor joists.

4. Refer to the IRC or to the AF&PA Span Tables for Joists and Rafters to find joist spans not contained in the following tables.

5. Apply the following tables to floor systems framed with nominal 2-inch-wide dimensional lumber, such as 2 × 10. An engineer must design floor truss and I-Joist systems.

Floor joists must conform to minimum span rating codes according to how long they are, how far apart they are spaced, and the type and grade of wood from which they are made.

Install floor system framing members according to this illustration. The provisions in this section refer to floor system framing using nominal 2”-thick dimensional lumber. Follow engineering instructions when using floor truss and I-joist systems.

Floor Joists Under Load-Bearing Walls

1. Install additional floor joists under load-bearing walls that run parallel with the floor joists. Ensure that the number of joists is sufficient to support the load imposed by the wall and the loads supported by the wall. Parallel floor joists run the same direction as the wall being supported. Example: install at least two floor joists under a wall supporting a roof and at least three floor joists under a wall supporting a full story and a roof.

2. You may separate the additional joists under a load-bearing wall, if necessary, to fit pipes, vents, or ducts. Install solid 2-inch-thick blocking at least every 4 feet along the full depth of the separated joists.

3. Place load-bearing walls that run perpendicular to the floor joists not more than one joist depth from the supporting wall or beam below unless the joists are sized to carry the load. Perpendicular joists run at a 90-degree angle to the wall being supported. Example: place a load-bearing wall that runs perpendicular to 2 × 10 floor joists not more than 10 inches from the supporting wall or beam below.

Place additional joists under load-bearing walls running parallel to the joists.

Header, Girder & Floor Joist Bearing on Supports

1. Place at least 11/2 inches of a floor joist, header, girder, or beam on the supporting wood or metal wall. Supporting wood includes a sill plate bearing on a masonry or concrete wall.

2. Place at least 3 inches of a floor joist, header, girder, or beam on the supporting masonry or concrete wall. Comply with this requirement when the member bears directly on the masonry or concrete wall, not on a sill plate that bears on the wall. This requirement usually applies to beams and girders.

3. You may support floor joists on at least a 1 × 4 ledger if the ledger is attached to each stud and if the joist is attached to a stud.

Place load-bearing walls running perpendicular to the joists not more than one joist depth away from the supporting wall or beam.

Place at least 11/2” of wood on the supporting wood.

Place at least 3” of wood on supporting concrete or masonry.

Lap joists that meet over supports with at least 3” overlap. Reinforce the lap joint with at least three 10d nails.

Attaching the ends of the floor joists to a band board is a common way to keep joists from twisting.

Attach floor joists to beams using metal joist hanger hardware.

Floor Joist Lap at Supports

1. Lap floor joists from opposite sides that meet over a bearing support at least 3 inches at the support, and nail the joists at the lap using at least three 10d nails. You may substitute a wood or metal splice of equal or greater strength for the nailed lap.

Floor Joist Attachment to Beams

1. Use an approved joist hanger or at least a 2 × 2 wood ledger to support floor joists that connect to a beam or girder.

Floor Joist Blocking

1. Install full-depth solid blocking that’s at least 2 inches thick at both ends of floor joists. Or, attach the joists to a header, band, or rim joist or to an adjoining stud. This helps reduce joist twisting.

2. Install blocking at all intermediate load-bearing supports in seismic design areas.

Attach floor joists to beams using a 2 × 2 or larger ledger for support.

Floor Joist Bridging

1. Install bridging at intervals not more than every 8 feet of floor joist length on floor joists deeper than 2 × 12.

2. You may use solid, full-depth blocking, wood or metal diagonal bridging, or other means to provide required floor joist bridging. Some code officials require bridging on all floor joists regardless of what the code stipulates.

Options for floor bridging include: Full depth lumber bridging (A); metal X bridging (B); wood X bridging (C).

Floor Joist Openings Not More than 4 Feet Wide

1. Install double trimmer joists on both sides of header joists. You may use a single trimmer joist on both sides of the header joists if the header is not more than 3 feet from the trimmer bearing point.

2. You may use a single header joist if the header joist span is not more than 4 feet wide.

3. Install approved joist hangers or a 2 × 2 ledger strip to connect tail joists to header joists and header joists to trimmer joists.

Use double trimmer joists at most openings. Use double header joists if the opening is more than 4’ wide.

Floor Joist Openings More than 4 Feet Wide

1. Install double trimmer joists and double header joists if the header joist span is more than 4 feet wide.

2. Install approved joist hangers to connect header joists to trimmer joists if the header joist span is more than 6 feet wide.

3. Install approved joist hangers or a 2 × 2 ledger strip to connect tail joists to header joists if the tail joists are more than 12 feet long.

Floor Sheathing

1. Install wood floor sheathing panels: (a) so that they continuously span at least two framing members, (b) with the long dimension perpendicular (90-degree angle) to supports, and (c) that are at least 24 inches wide. Panels less than 24 inches wide can deflect or fail under load.

2. Support wood floor sheathing panel edges with solid blocking, tongue-and-groove edges, or other approved means. An additional underlayment layer that is at least 1/4 inch or 3/4-inch wood floor covering can substitute for edge support in some cases.

3. You may use wood floor sheathing panels (such as 23/32-inch and 3/4-inch nominal thickness plywood or OSB and 3/4-inch sanded plywood) as a combination subfloor and underlayment. Install combination subflooring as described in #1 above. Be aware that while combination subflooring panels comply with the IRC, they may not comply with manufacturer’s installation for some floor coverings, such as tile.

Support edges of floor sheathing with tongue-and-groove edges.

Support edges of floor sheathing with solid blocking.

Draftstopping

Draftstopping helps limit the spread of fires in floor framing and in floor/ceiling assemblies. It is most often required when using open web floor trusses and when a ceiling is suspended under a floor. Do not confuse draftstopping with fireblocking. Fireblocking occurs in wall assemblies.

Installing Draftstopping

1. Install draftstopping when usable space exists both above and below the floor/ceiling assembly and when the open area within the concealed floor/ceiling assembly exceeds 1,000 square feet.

2. Use at least 1/2-inch drywall, 3/8-inch wood structural panels (plywood or OSB), or other approved material.

3. Divide the space to be draftstopped into areas that are approximately equal.

4. Install the draftstopping material parallel with the framing.

5. Repair draftstopping that is damaged or penetrated by pipes, ducts, or other materials.

Some floor trusses require draftstopping to prevent horizontal air movement that can conduct fire. Solid wood floor joist systems typically do not, because they are naturally closed off. Install a draftstop in web floor trusses when there is usable space above and below and when the concealed area is more than 1,000 sq. ft. Drywall and wood structural panels may be used for draftstops.

Fire Protection of Floor Framing

1. Install at least 1/2-inch-thick drywall or 5/8-inch-thick wood structural panels on the bottom side of floor systems in basements and in crawlspaces containing fuel-fired or electric-powered heating appliances. This provision does not apply if the floor system is built using 2 × 10 or larger dimensional lumber; it will usually apply only to floor systems built using wood I-joists.

Notches & Holes in Joists & Rafters

Boring & Notching Definitions

A bore is a hole drilled in a stud or joist. Use the actual dimensions to determine the depth of framing lumber and when calculating the maximum hole diameter.

A notch is a piece cut from the smaller dimension of framing lumber, such as a stud or joist. Use the actual dimensions to determine the depth of framing lumber and when calculating the maximum notch depth. Actual dimensions are the dimensions of framing lumber after finishing at the mill. Example: the nominal dimensions of a 2 × 6 are 2 inches by 6 inches, and the actual dimensions, after finishing, are about 11/2 inches by 51/2 inches.

Wood Joist Notching & Boring

1. You may notch solid lumber rafters, floor and ceiling joists, and beams not deeper than 1/6 the depth of the member. You may notch the ends of the member not deeper than one fourth the depth of the member. Example: notch a 2 × 10 joist not deeper than 11/2 inches, except at the ends, where you may notch not deeper than 25/16 inches.

2. You may notch solid lumber rafters, floor and ceiling joists, and beams not longer than one-third the depth of the member. Example: notch the top or bottom of a 2 × 10 joist not longer than 31/16 inches.

3. You may notch solid lumber rafters, floor and ceiling joists, and beams only within the outer one-third of the span. Example: notch a 10-foot-long joist only within 40 inches from each end.

4. You may notch the tension side (bottom) of solid lumber rafters, floor and ceiling joists, and beams more than 4 inches thick only at the ends.

5. You may drill holes in solid lumber rafters, floor and ceiling joists, and beams with a diameter not more than 1/3 of the depth of the member. Example: drill a hole with a diameter not more than 31/8 inches in a 2 × 10 joist.

6. Locate holes at least 2 inches from the edge of the member and at least 2 inches from any other hole or notch.

7. Use actual joist depths, not nominal joist depths. Example: use 91/4 inches for a 2 × 10 joist, not the nominal depth of 10 inches.

Drill holes not more than 1/3 of the member depth and cut member notches not deeper than 1/6 of the member depth.

Notch wood joists and rafters not longer than 1/3 of the depth and only in the outer 1/3 of the member.

Drill holes in wood joists and rafters not larger than 1/3 the depth and at least 2” from the edge of the member.

Wall Systems

Whether they are interior or exterior, load-bearing or nonload-bearing, made from wood studs or metal, walls must meet very specific construction standards to ensure that they do not impede the structural integrity of a house and do their part to prevent fires from spreading within wall cavities. Nevertheless, be aware that designing and building load-bearing walls is a closely regulated process. In most cases, you would be well advised to consult a structural engineer to make sure that the lumber sizes and spacing conform to code standards and that any beams are appropriately sized, properly supported, and made from qualifying materials.

Even nonload-bearing walls must conform to construction codes.

Wood Nailing Requirements

Wood Nailing General Installation Requirements

1. Use nails that are at least as thick and long as indicated in the following tables. Common nails and box nails are thicker and longer than hand-driven sinker nails and pneumatic-driven nails commonly used in residential construction. You cannot directly substitute sinker and gun nails for common, box, or deformed shank nails. Substitution of sinker and gun nails should be based on engineering analysis.

Wood Nailing to Framing Materials

1. Use Tables 8, 9, and 10 to determine the type of nail and nail spacing for attaching wood framing materials to other wood framing materials in other than high wind and seismic design areas. Refer to the general codes for fastener type, quantity, and spacing in high wind and seismic design areas.

Install nails around the edge of wood panels and at intermediate supports at the required on-center spacing.

Wall Stud Size & Spacing

Wood Grades Used in Wall Construction

1. Use Number 3, standard, or stud grade wood for most load-bearing walls not more than 10 feet tall. Do not use this wood for load-bearing walls more than 10 feet tall. Use Number 2 grade or better lumber for walls more than 10 feet tall.

2. You may use utility grade wood for nonload-bearing walls.

3. Refer to general codes for more information about other wall height and stud spacing combinations.

4. Refer to general codes for wall height and stud spacing requirements in high wind, heavy snow load, and seismic design areas.

Wall studs taller than 10’ require No. 2 or better grade construction lumber. Shorter walls may be built with cheaper No. 3 grade in most cases.

Stud Size & Spacing for Load-Bearing Walls Not More than 10 Feet Tall

1. Use Table 11 to determine stud size and spacing when the unsupported vertical height of an exterior load-bearing wall is not more than 10 feet. Measure vertical height between points of horizontal (lateral) support between studs. Vertical wall height is usually measured between the bottom of the sole or sill plate and the bottom of the floor or ceiling. Consult a qualified engineer before measuring unsupported vertical wall height between points other than at floor levels.

Stud size and spacing depends on what the studs are supporting.

Stud Size & Spacing for Nonload-Bearing Walls

1. Use Table 12 to determine stud size and spacing for nonload-bearing walls. Measure vertical height between points of horizontal (lateral) support between studs. Vertical wall height is usually measured between the bottom of the sole or sill plate and the bottom of the floor or ceiling. Consult a qualified engineer before measuring unsupported vertical wall height between points other than at floor levels.

Top & Bottom Plate Construction

1. Use at least two 2-inch-deep (nominal) top plates that are at least as wide as the studs at the top of load-bearing walls. Examples: use two 2 × 4 top plates on top of a 2 × 4 wall, and use 2 × 6 top plates on top of 2 × 6 walls.

2. Offset joints where two pieces of top plate meet by at least 24 inches. You do not need to place a stud under a joint in a top plate unless the stud would be placed there for other reasons.

3. Lap one top plate from one wall over the top plate of an intersecting wall at the wall corners and at the intersection with load-bearing walls.

4. You may use a single top plate at the top of nonload-bearing walls.

5. Install one galvanized metal strap at least 0.054 inch thick (16 gauge) and 11/2 inches wide on a top plate if it is cut more than 50 percent of its actual depth. These metal straps are sometimes called FHA straps. It is not necessary to install a strap on both top plates for purposes of this section. You may need to install shield plate to protect plumbing pipes and electrical wires.

6. Extend the strap at least 6 inches beyond each side of the cut opening. Secure the strap with at least eight 16d nails on each side of the strap.

7. Apply this strap requirement to top plates in exterior and interior load-bearing walls.

8. You do not need to install the strap if wood structural panel sheathing covers the entire side of the wall with the notched or cut top plates.

9. Use at least one 2-inch-deep (nominal) bottom plate that is at least as wide as the studs. Note that some jurisdictions allow treated plywood to serve as the bottom plate for curved walls. Verify this local exception with the building official.

Offset joints where two top plates meet by at least 24”. Nail the top plate on each side of the splice as described in Table 10.

Install a strap across one top plate when it is notched more than half its width. Install another strap or a shield plate when required to protect pipes and electrical wires.

Notches & Holes in Wall Studs

Boring & Notching Definitions

A bore is a hole drilled in a stud or joist. Use the actual dimensions to determine the depth of framing lumber and when calculating the maximum hole diameter.

A notch is a piece cut from the smaller dimension of framing lumber, such as a stud or joist. Use the actual dimensions to determine the depth of framing lumber and when calculating the maximum notch depth. Actual dimensions are the dimensions of framing lumber after finishing at the mill. Example: the nominal dimensions of a 2 × 6 are 2 inches by 6 inches, and the actual dimensions, after finishing, are about 11/2 inches by 51/2 inches.

Wood Stud Notching

1. Notch a load-bearing stud not more than 25 percent of its actual depth. Example: notch a 2 × 6 load-bearing stud not more than 13/8 inches.

2. Notch a nonload-bearing stud not more than 40 percent of its actual depth. Example: notch a 2 × 6 nonload-bearing stud not more than 21/4 inches.

Wood Stud Boring

1. Bore a hole in a single load-bearing stud not more than 40 percent of its actual depth. Example: bore a 2 × 6 load-bearing stud not more than 21/4 inches in diameter.

2. You may bore holes in load-bearing studs not more than 60 percent of their actual depth if you install a double stud and do not bore more than two successive studs.

3. Bore a hole in a nonload-bearing stud not more than 60 percent of its actual depth. Example: bore a 2 × 6 nonload-bearing stud not more than 31/4 inches in diameter.

4. Leave at least 5/8 inch of undisturbed wood between the hole and the stud edge.

5. Do not place a hole and a notch in the same horizontal section of the stud.

Notch a load-bearing stud not more than 25 percent of its actual depth.

Drill a hole in a load-bearing stud not more than 40 percent of its actual depth.

Double two load-bearing studs if the holes are not more than 60 percent of their actual depth.

VIOLATION! Do not locate a notch and a hole in the same part of the stud.

Cripple Wall Framing

Cripple Wall Requirements

1. Install cripple walls using studs that are at least the same width as the wall studs above.

2. Frame cripple walls more than 4 feet tall as though they are full height walls. This means using the stud sizes and framing requirements previously described. Example: if full height wall studs on the same floor level as the cripple wall are 2 × 6, use 2 × 6 studs for the cripple wall.

3. Brace cripple walls using the same bracing method and length as the wall above, except multiply the cripple wall brace length by 1.15. Example: if the cripple wall is a 2-foot-tall basement wall and the wall brace length for the first story wall above is 3 feet, brace at least 3.45 feet (3 × 1.15) of the cripple wall.

4. Install sheathing that covers at least one full side of a cripple wall less than 14 inches tall. Fasten the sheathing to both the top and bottom plates.

5. Support cripple walls on a continuous foundation.

6. You may substitute solid blocking for a framed and sheathed cripple wall less than 14 inches tall.

7. Anchor cripple walls to the foundation like other framed walls.

8. Refer to the IRC for additional bracing requirements in seismic design areas.

Cripple walls are often combined with egress window framing. The cap plate on the block wall supports the floor trusses for this addition. The 2 × 6 construction allows the project to meet minimum wall insulation codes.

Wall Bracing

General codes present many methods and rules for framed wall bracing. This section discusses two common wall bracing methods and some general rules about how to install them. Wall bracing is very complicated. The intent of this section is to introduce you to the concepts. Refer to general codes and consult with qualified professionals for more information about wall bracing, particularly when dealing with wall bracing in high wind, seismic design, and heavy snow load areas.

Wall Brace & Braced Wall Definitions

Braced wall (braced wall line). A braced wall is a mostly straight interior or exterior wall that contains the required length of approved wall braces (braced wall panels). Most exterior walls and some interior walls are braced walls. The illustration shows examples of where wall braces are installed in braced walls. Offsets from a straight wall are allowed if the offset is not more than 4 feet. Angled walls are allowed if the angled wall is not more than 8 feet long.

Structural panel wall bracing. To prevent framed walls from racking or leaning, bracing is required. In most cases, bracing can be accomplished by fastening full-height structural panels to the wall framing at defined intervals, near corners and around wall openings.

Wall brace (braced wall panel). A wall brace is a full height wall with no vertical or horizontal offsets that has approved wall bracing material attached. A wood structural panel (such as OSB) and panel-type siding are common examples of approved wall bracing materials. Each braced wall must have an approved total length of wall braces. The total length of wall braces depends on: (a) the criteria described in the next section; (b) the type of bracing material, such as wood structural panels and panel siding bracing; (c) the story being braced; (d) the design wind speed; and (e) the seismic design category.

Wall Bracing Methods

1. Use one of the approved wall bracing methods. Common wall bracing methods include wood structural panel sheathing that is at least 3/8 inch thick, hardboard panel siding that is at least 7/16 inch thick, let-in bracing, and portal frame braces that provide shorter length bracing near large openings and garage doors. Each of these methods is an intermittent bracing method. This means that individual wall braces are installed near the ends of each braced wall.

2. You may use a continuous sheathing wall bracing method. This means that all braced walls have sheathing, such as wood structural panels applied continuously to the walls, including above and below openings and on gable end walls. Refer to the IRC for requirements regarding panel lengths near openings and for panel installation and hold-down straps at the ends of continuously sheathed braced walls.

3. Refer to the IRC for information about other wall bracing materials and methods. Refer to manufacturer’s instructions for information about manufactured wall braces.

4. You may use different wall bracing methods within the same braced wall, and you may use different bracing methods on different stories. Example: you may use let-in bracing at one end of a braced wall and structural panel bracing on the other end. Use the highest required bracing length in the table when using different bracing methods in the same braced wall. Refer to the IRC for some restrictions when mixing wall bracing methods.

Wall Bracing General Installation Requirements

1. Install a wall brace near the end of each braced wall.

2. Begin the wall brace not more than 10 feet from the end of a braced wall.

3. Begin a wall brace not less than 20 feet from the closest edge of the next wall brace in the braced wall.

4. Do not exceed 60 feet between braced walls. Smaller distances between braced walls are required in the D series seismic design areas. Refer to the IRC.

Wall Brace Length

1. The following discussion and Table 13A (see here) assumes the house: (a) is located in an urban area or suburban subdivision that is not in an earthquake risk area, (b) has a roof that is not more than 30 feet above the first story floor, (c) the height of the wall being braced is not more than 10 feet, and (d) wood structural panels or panel-type siding is used for the wall brace. This a simplified explanation. Refer to the IRC for more detailed information.

2. Install at least two 48-inch-long wall braces in braced walls longer than 16 feet. Install at least one 48-inch-long wall brace or two smaller wall braces in braced walls 16 feet long or less. Install these braces even if Table 13A specifies a smaller length. Install the length of wall braces specified in Table 13A if the wall brace length in Table 13A is longer than 48 inches.

Fastening Wall Braces

1. Fasten wall bracing material to framing according to the fastening schedules in the Wood Nailing Requirements section of the IRC or according to the brace manufacturer’s instructions.

2. Fasten vertical joints at panel sheathing edges to studs. Fasten horizontal joints to at least (≥) 11/2-inch-thick blocking.

3. Use fasteners and uplift connectors as required by good engineering practices to connect rafters and trusses to wall braces and to connect the wall braces to framing in stories below.

4. Install at least (≥) 1/2-inch drywall on the interior side of wall braces. You will need to multiply the wall brace length by 1.40 if drywall is omitted. Space drywall fasteners not more than (≤) 8 inches on center at panel edges when using let-in wall braces.

Simple Wall Bracing

1. You may use a less complex wall bracing method for certain homes that are basically rectangles with insets and pop-outs. The home must comply with all of the following to qualify for this less complex method: (a) wind speed area not more than 130 miles per hour; (b) wind exposure category is B or C; (c) wall height not more than 10 feet; (d) seismic design category A, B, or C for one- and two-family homes; (e) not more than three stories above a concrete or masonry foundation or basement wall; (f) cantilevered floors extend not more than 24 inches beyond the bearing point; (g) roof eave to ridge height not more than 15 feet; (h) at least (≥) 1/2-inch drywall installed on the interior side of all exterior walls; and (i) no cripple walls allowed in three-story homes.

2. Use wood structural panels that are at least 3/8 inch thick as the wall bracing material. Fasten 3/8-inch-thick wood structural panels using 6d common nails. Fasten 7/16-inch-thick wood structural panels using 8d common nails. Space the nails 6 inches on center at the edges and 12 inches on center at intermediate supports.

3. Build bracing units as full height walls with no openings and no vertical or horizontal offsets. A bracing unit must be one fully sheathed vertical wall segment.

4. Use bracing units that are at least 3 feet long when the walls are continuously sheathed with the wall bracing material. Continuously sheathed means all wall areas have structural sheathing applied, including above and below openings and at gable wall ends. Use bracing units that are at least 4 feet long when the walls are not continuously sheathed.

5. Begin a bracing unit not more than 12 feet from a wall corner. Make the distance between adjacent bracing units in the same wall not more than 20 feet. Place at least one bracing unit in any wall more than 8 feet long.

6. Determine the length of exterior walls as shown in the illustration shown here. Do not include open structures, such as porches, decks, and carports. Interior walls do not count as braced walls.

7. You may count bracing units that are wider than the minimum width as multiple bracing units. Divide the width of the bracing unit by the minimum bracing unit width to determine the number of bracing units. Example: a bracing unit is 7 feet wide. The wall is not continuously sheathed, so the minimum bracing unit width is 4 feet. The 7-foot-wide bracing unit counts as 13/4 bracing units (7/4 = 1.75).

8. Do not count sheathed wall segments that are narrower than the 3- or 4-foot minimum lengths as bracing units. Refer to the IRC for exceptions involving certain continuous sheathing methods at garage doors and large openings.

Wood Structural Panel Wall Bracing

1. Install wood structural panel wall bracing using 4 × 8 or 4 × 9 panels at least 3/8 inch thick (span rating 24/0).

2. Install panels that are at least 48 inches wide and cover at least three stud bays for studs spaced 16 inches on center.

3. Secure 3/8-inch-thick wood structural panel bracing to studs using at least 6d common nails spaced not more than 6 inches on center at panel edges and 12 inches on center at intermediate supports. Secure 7/16-inch-thick panels (span rating 24/16) using 8d common nails spaced as previously described.

4. Install solid blocking where panel joints occur between studs to maintain fastener spacing. Use at least 11/2-inch-thick wood for blocking. The blocking is usually the same dimensions as the studs. Example: 2 × 6 blocking is normally used with 2 × 6 studs, although 2 × 4 blocking is acceptable.

5. You may use wood structural panel wall bracing on all stories and in all wind speed and seismic design areas.

Wood structural panel wall bracing may be used on all stories and in all seismic and wind design areas.

Fireblocking

Fireblocking (also called firestopping) limits the spread of fires vertically between stories in concealed wood-framed walls and horizontally in long concealed areas, such as double walls, framed openings, and drop soffits above cabinets. Concealed vertical spaces in wood-framed walls can act like a chimney, providing fire an easy and rapid path between stories. Lack of fireblocking increases the chance of property damage and loss of life during a fire. Lack of fireblocking is a common reason for failing government inspections.

Do not confuse fireblocking with draftstopping (see here). Draftstopping limits the horizontal movement of air in concealed floor/ceiling assemblies.

Where Fireblocking Is Required

1. Install fireblocking in any concealed wall space if an opening exists that would allow fire to spread from one story to another or from a lower story into the attic. Examples of such openings include: openings for plumbing pipes, openings for electrical wires and conduit, HVAC duct chases between stories, laundry chutes, and openings at the tops of framed columns, niches, and arches.

2. Install fireblocking in concealed wall spaces at every ceiling and floor level. An intact top and bottom plate usually provides fireblocking in platform framing.

3. Install fireblocking where concealed vertical and horizontal wall spaces intersect. Examples of concealed horizontal spaces include soffits for kitchen cabinets and recessed vanity lights, and drop ceilings.

4. Install fireblocking between stair stringers at the top and bottom of each flight of stairs. Also install drywall (at least 1/2 inch thick) on all walls and soffits if the area under the stairs is accessible by a door or access panel.

5. Install fireblocking around chimneys and flues where they intersect framing at floor and ceiling levels.

6. Install fireblocking in concealed wall spaces if the concealed space is open for more than 10 feet horizontally. A common example of a long concealed horizontal wall space is a double wall built using two rows of staggered studs. Another example is a large arched opening between rooms.

Install fireblocking in framed columns, framed arches, and similar openings between stories.

Install listed fire-resistant caulk or foam sealant at penetrations for wires, pipes, and ducts. This helps reduce the spread of fires and helps limit air and moisture flow.

Fireblocking Materials & Installation

1. You may use any of the following fireblocking materials: (a) 2-inch-thick lumber (example: a 2 × 4), (b) two pieces of 1-inch-thick lumber with staggered joints (example: two 1 × 4), (c) at least 23/32-inch-thick wood structural panels, (d) at least 3/4-inch-thick particleboard, (e) at least 1/2-inch-thick drywall, (f) at least 1/4-inch-thick cement-based millboard, or (g) unfaced batts or blankets of mineral wool or fiberglass insulation if it is secured in place.

2. Install backing at any joints in fireblocking material when using wood structural panels or particleboard. Use the same fireblocking material for the backing. Example: if a joint exists in OSB fireblocking material, place another piece of the same OSB material over the joint. Most general codes do not state how far to extend the backing.

3. Do not use loose fill insulation as a fireblocking material unless it is specifically tested and approved for the intended location and installation method.

4. Repair fireblocking that is damaged or penetrated by pipes, ducts, or other materials.

Wall Penetration Flashing

It is not possible to overstate the importance of flashing to the long-term integrity and health of your home. Sealants, such as caulk, degrade over time and require maintenance. Exterior wall coverings move and crack, creating gaps into which moisture can flow. People often do not maintain caulking and sealants as they should. The best long-term solution to avoiding moisture intrusion is a combination of a water-resistant barrier and flashing integrated to form a drainage plane that prevents moisture from reaching vulnerable wood framing materials and drains the moisture away from the structure.

Flashing General Requirements

1. Use only corrosion-resistant flashing material, such as aluminum, galvanized steel, and peel-and-stick material. Corrosion resistance includes fasteners or other materials used to secure the flashing.

2. Use flashing, fasteners, and other materials that are compatible with each other and with surrounding materials. Incompatible materials will react with each other and degrade over time. Example: do not use galvanized material with aluminum or with copper.

3. Flash and seal all wall penetrations and other vulnerable areas so that moisture will not enter the structure. Flash and seal any point where moisture could enter the structure, regardless of whether it is mentioned in the list of areas where flashing is specifically required.

4. Install flashing “shingle fashion” so that upper flashing laps over lower flashing, resulting in a drainage plane that will drain water toward a designated discharge point. This includes integrating flashing with the water-resistant barrier.

5. Extend flashing to the surface of the exterior wall finish material if necessary to assure that water is drained. This may be necessary with brick veneer, at horizontal joints in panel siding, with Z flashing at window and door headers, and at other drainage points.

Kick-out flashing is inserted between the underside of the roof-covering layer and a sidewall to redirect water away from the sidewall. Flashing should be at least 4” tall and 4” wide.

Flashing Required Locations

1. Install flashing at all window and door openings. Refer to the window and door manufacturer’s installation instructions and to the instructions for any weather-resistive material (such as house wrap) or flashing material.

2. Install pan flashing at the window and door sills unless the window or door manufacturer’s instructions state otherwise. Integrate the pan flashing with jamb (side) flashing, header (top), and the weather-resistant barrier. Install all window and door flashing so that water drains away from the opening and out from the structure.

3. Install sidewall flashing where chimneys or other masonry construction intersect with walls.

4. Install projecting lips (sometimes called kick-out flashing) at chimneys and other sidewalls where a roof extends past a vertical sidewall. Kick-out flashing helps divert water away from this vulnerable intersection.

5. Install header/sidewall flashing under and at the ends of all copings and sills, including masonry, metal, and wood.

6. Install header/sidewall flashing above all wood trim that projects from the adjoining wall and forms a shelf where water can collect.

7. Install flashing at the attachment point of exterior porches, decks, balconies, stairs, or floor assemblies to wood-framed construction.

8. Install sidewall flashing at all roof and wall intersections.

How to Flash a Window & a Door

Install a water-resistant barrier, such as flexible flashing, to the sheathing beneath the window opening. Attach the barrier at the top only so material may be slipped underneath later. Install a metal or peel-and-stick window pan in the opening. Cut small patches of adhesive membrane to cover the corners where the pan climbs up the side jambs.

NOTE: If building wrap has already been installed, remove just enough to expose the exterior wall sheathing around the window opening.

Cut strips of self-adhesive flashing membrane and apply them to the wall at each side of the window opening. The flashing should extend into the window opening an amount roughly equal to the thickness of the wall. Make slits in the flashing at the top and bottom and fold over to cover the side jambs and the vertical portion of the pan. Apply a bead of adhesive caulk around the sides and top of the opening.

Install the window according to the manufacturer’s directions. Apply a strip of self-adhesive flashing membrane across the top of the opening, covering the top window nailing flange.

Install building wrap according to the manufacturer’s instructions. The edges of the wrap at the window opening should be secured to the flanges with building wrap tape supplied by the building wrap manufacturer. At the bottom of the window, slide the top edge of the building wrap behind the moisture barrier that was left unfastened at the bottom.

Roof Systems

This section addresses the roof structural system. Refer to other sections of this book, general codes, and manufacturer’s instructions for information about installing roof coverings. The number and size of the rafters or trusses is a vital element of home design, as are the methods for fastening these elements to the house structure. If you live in a coastal area or any region that is prone to earthquakes or hurricanes, a separate set of codes exists for your roof system. Be sure to enforce its more rigorous standards when you build.

Ridge, Valley & Hip Rafter Framing

1. Install at least a 1-inch (nominal thickness) ridgeboard at roof ridges in houses built with rafters (truss-built roofs do not have ridgeboards). Install a ridgeboard that is at least as deep as the (plumb) cut end of the rafter. Install rafters across from each other (within 11/2 inch) at the ridgeboard. You may omit the ridgeboard if you secure the rafters to each other with a gusset plate, collar tie, or ridge strap.

2. Install at least a 2-inch (nominal thickness) hip rafter and valley rafter at all hips and valleys, including valleys formed when one roof is framed on top of another, collar tie, or ridge strap.

3. Support hip and valley rafters at the ridge with a brace to a load-bearing wall, or design the hip and valley rafters to bear the load at the ridge.

4. Design and support ridge, hip, and valley rafters as beams when the roof pitch is less than 3/12.

5. Design and support the ridge as a beam and design the walls supporting the ridge board to bear the ridgeboard load when framing cathedral and vaulted ceilings without ceiling joists and rafter ties.

A roof system comprises rafters or trusses that support roof sheathing. The sheathing is covered with an underlayment and roofing materials. Soffits, flashing, and ventilation are also important parts of the roof system.

Rafters have specific names that are assigned according to their function in the roof system.

Position rafters across from each other on a ridgeboard or beam that is at least as deep as the rafter plumb cut.

Purlins

1. You may use purlins to support rafters that would otherwise span a greater distance than allowed. Example: a properly installed purlin at the center of an 18-foot-long rafter would allow you to use 9 feet as the rafter span distance.

2. Install purlins that are at least the same depth as the rafters they support. Example: use a 2 × 6 purlin to support a 2 × 6 rafter.

3. Use at least one 2 × 4 brace to carry the purlin load to a load-bearing wall. The purlin brace length should not exceed 8 feet without additional bracing (usually an additional 2 × 4 nailed to the brace). Purlin braces should bear on a load-bearing wall and may not slope at less than a 45-degree angle from horizontal. Space the purlin braces not more than 4 feet apart.

Use purlins to support rafters if the rafter span is longer than allowed.

Collar Ties

1. You may install collar ties, gusset plates, or ridge straps if installing rafters without a ridge board. Collar ties, gusset plates, and ridge straps are not required if a ridge board is installed.

2. Space collar ties not more than 4 feet on center.

3. Locate collar ties in the upper one-third of the attic space.

4. Connect collar ties and rafters as specified in Table 10 (see here).

Rafter & Ceiling Joist Bearing on Support

1. Install rafters and ceiling joists with at least 11/2 inches of the rafter or joist bearing on supporting wood members (such as a top plate or a valley rafter) and at least 3 inches of the rafter or joist bearing on masonry or concrete.

2. Toenail rafters to the top plate as specified in Table 10 (see here).

3. Install plates with a bearing area of at least 48 square inches when the plate bears on concrete or masonry. This means that the plate should have at least 48 square inches of surface area in contact with the masonry or concrete.

Rafter & Ceiling Joist Bridging & Lateral Support

1. Install bridging on rafters and ceiling joists deeper than 2 × 12 (six-to-one depth-to-thickness ratio). Space bridging not more than every 8 feet. Bridging should consist of solid, full-depth blocking, wood or metal diagonal bridging or by nailing at least a 1 × 3 wood strip to each rafter or ceiling joist. Bridging is required by some building officials on ceiling joists smaller than 2 × 12.

2. Install lateral support at bearing points on rafters and ceiling joists deeper than 2 × 10 (five-to-one depth-to-thickness ratio).

Ceiling Joist & Rafter Notching & Boring

1. Notch and bore dimensional lumber ceiling joists and rafters using the same rules as for floor joists, except as indicated below.

2. Leave at least 31/2 inches of wood above the notch (bird mouth cut) where the rafter bears on the exterior wall, and do not cantilever the rafter past the wall more than 24 inches.

3. Do not taper a ceiling joist more than the actual depth of the ceiling joist divided by 4 if notching the ceiling joist where it bears on the wall. Example: do not cut more than 17/8 inch of a 2 × 8 ceiling joist where it bears on the wall.

Connect one ceiling joist to one rafter when the ceiling joists and rafters are parallel.

Connect one rafter tie to one rafter.

Ceiling Joist Nailing to Rafter

1. Toenail all rafters to the top plate as specified in Table 10 (see here).

2. Install a method to prevent rafter thrust from pushing on supporting walls. You may use ceiling joists, rafter ties, or kickers to comply with this requirement.

3. Connect one rafter to one ceiling joist when the ceiling joists are parallel to the rafters. Locate the ceiling joists in the lower third of the attic area, if possible. Facenail these ceiling joists to rafters using 16d common nails or 40d box nails. (See Table 14.)

4. Connect one rafter to one rafter tie and connect the rafter tie to the corresponding rafter on the other side of the roof when the ceiling joists are not parallel to the rafters. Locate the rafter ties in the bottom one-third of the rafter height, if possible. Facenail rafters ties to rafters using the quantity of 16d common nails or 40d box nails indicated in Table 14. Use 2 × 4 or larger lumber for rafter ties.

5. You may substitute 2 × 4 kickers for rafter ties if the ceiling joists are not parallel to the rafters. Fasten the kickers to the rafters and to the ceiling joists as if the kickers were ceiling joists or rafter ties.

6. Lap ceiling joists that meet over interior walls or beams at least 3 inches, and facenail using the same quantity and type of nails indicated in Table 14. Apply this requirement when the ceiling joists are designed to resist rafter lateral thrust. This requirement usually applies when the ceiling joists are attached to the rafters.

7. You may butt the ends of ceiling joists together over interior walls or beams. Fasten the ceiling joists as specified in Table 10 (see here) if the ceiling joists are not designed to resist rafter lateral thrust. This exception usually applies when the ceiling joists are not attached to the rafters.

Ceiling Joist Nailing to Rafter Exceptions

1. Note the following exceptions to the quantity of nails required by codes:

(a) You may reduce the required quantity of nails by 25 percent if the nails are clinched (the pointed ends sticking out from the wood are bent over).

(b) You may use fewer fasteners if you support the ridge board on load-bearing walls or if you design and support the ridge as a beam.

(c) You may use a smaller roof span column if you install purlins to support the rafters. Example: if you install purlins at the center of rafters with a roof span of 24 feet, you may reduce the roof span by 50 percent and use the 12-foot roof span column.

(d) You may reduce the actual rafter slope by one-third if you substitute rafter ties for ceiling joists, Example: if the actual rafter slope is 9/12, use 6/12 as the adjusted rafter slope, but because there is no 6/12 slope row, use the nearest more conservative 5/12 row.

(e) Increase the quantity of nails in the table if the ceiling joists or rafter ties are not located at the bottom of the attic space.

Rafter & Truss Connection to Walls

1. Attach trusses and rafters to the supporting walls as specified in Table 10 (see here). This applies when: (a) roof uplift force is not more than 200 pounds and the trusses and rafters are spaced not more than 24 inches on center; or when (b) the wind speed is not more than 115 miles per hour, the wind exposure category is B and the is not more than 32 feet, and the roof pitch is at least 5/12. The truss design drawings supersede this requirement.

2. Refer to the IRC or engineered plans for wall attachment requirements when the limitations in #1 above do not apply. Some building inspectors require hurricane ties on all trusses and rafters.

Hurricane ties (also called clips) are recommended for all rafter or truss connections to walls. In some areas, they are required.

Ceiling Joist & Rafter Deflection

1. All ceiling joist spans in the tables below use L/240 deflection, where L is the length of the joist or rafter in inches divided by 240.

2. All rafter spans in the tables below use L/180 deflection.

Ceiling Joist & Rafter Span Tables

1. Use the following tables to determine the maximum unsupported horizontal distance that ceiling joists and rafters can span.

2. Refer to the IRC or to the AF&PA Span Tables for Joists and Rafters to determine spans for lumber widths, species, grades, and snow load factors not in these tables.

3. These tables apply to roof systems framed using standard 2-inch (nominal thickness) dimensional lumber. An engineer must design roof truss systems.

Roof Truss Installation

Truss Design & Bracing Written Specifications Requirements

1. Use a qualified engineer to design all wood trusses, such as roof and floor trusses. The engineer and/or truss manufacturer should provide written truss design and installation specifications and deliver them to the job site with the trusses. These specifications should include engineering information, such as chord live and dead loads; assembly information, such as the size, species, and grade of each truss member; and installation instructions, such as where each truss should be located on the structure and how the trusses should be permanently braced.

Truss Installation Tolerance Recommendations

1. Install trusses according to the installation tolerances contained in the written truss specifications. Use the following installation tolerances from the booklet Guide to Good Practice for Handling, Installation & Bracing of Metal Plate Connected Wood Trusses only if the engineer and/or truss manufacturer does not provide installation instructions. The IRC does not specifically require installation to these tolerances; however, installation to these tolerances is implied by the general IRC requirement that components be installed according to manufacturer’s installation instructions.

2. Install trusses so that a bow in either the top or bottom chord is not more than L/200 or 2 inches, whichever is less. L is the length of the truss chord in inches.

3. Install trusses that are out-of-plumb (vertical) by not more than D/50 or 2 inches, whichever is less. D is the depth of the truss in inches at the point of measurement.

4. Install trusses at load-bearing points not more than 1/4 inch from the location on the plans.

5. Install trusses that use the top chord as the weight-bearing point with a gap of not more than 1/2 inch between the inside of the load-bearing support and the first diagonal or vertical truss web.

Alteration & Repair of Trusses

1. Do not alter trusses in any way, including cutting, notching, boring, and splicing, without written instructions from a qualified engineer.

2. Do not use trusses to carry the weight of equipment (such as furnaces or water heaters), use the attic area for storage, or hang storage units from trusses unless the trusses have been designed to carry the additional weight.

3. Do not repair damaged trusses without written instructions from a qualified engineer.

Attic Access

General Attic Access Requirements

1. Provide an access opening to every attic with at least 30 square feet of attic area and a vertical height of at least 30 inches at some point in the 30 square feet. Measure the vertical height from the top of the ceiling joists (or truss bottom chord) to the bottom of the rafters (or truss top chord).

2. Provide a rough opening (size before finishing) for a ceiling attic access of at least 22 inches by 30 inches. Locate the opening in a hallway or other readily accessible location. Locate the opening so that at least 30 inches of unobstructed headroom exists at some point above the opening.

3. Provide a rough opening (size before finishing) for a wall attic access of at least 22 inches wide by 30 inches high.

4. You do not need to provide attic access if the ceiling and roof systems are built using non-combustible materials. This is rare in residential construction.

5. Refer to the IRC for additional access requirements if appliances are located in the attic.

Insulation Clearance to Heat-Producing Devices

1. Provide at least 3 inches clearance between combustible insulation and heat-producing devices, such as recessed lighting fixtures and fan motors. Most insulation used in modern homes is considered combustible.

2. You may reduce the 3-inch clearance requirement if the device is listed for a lesser clearance and is installed according to manufacturer’s instructions.

3. Install an insulation shield around any gas or oil vent that passes through an attic or other insulated area (such as a floor/ceiling assembly).

4. Use at least 26-gauge sheet metal for the insulation shield.

5. Extend the shield at least 2 inches above attic insulation material.

6. Secure the insulation shield to prevent movement of the shield.

Install an insulation shield around equipment vents that pass through insulation.

Exterior Components

The primary function of the exterior components of a building is to keep the elements out. Of these elements, the most destructive is water. Water causes more damage than almost any other natural source, including fire and termites. Water can destroy most building materials, and it is an essential ingredient for mold growth.

In this chapter you will learn about three common water control issues. Shingle roof coverings are the most common type of material for keeping water that falls on the roof out of the home. You will learn about the code requirements for shingle installation and about where to install flashing that keeps water away from vulnerable areas, such as where roofs intersect with walls and chimneys. You will also learn about code requirements for water control around your home so that water stays out of basements and crawl spaces.

This chapter also contains information about fireplaces and chimneys. Water infiltration is common around these components, and fire safety is an additional important consideration.

In this chapter:

Shingle Roof-Covering Installation

Fireplaces & Chimneys

Shingle Roof-Covering Installation

When it comes to installing roof coverings, it can be a little hard to define where enforceable codes end and ordinary best practices begin. But it is safe to say that most codes contain guidelines for installing roof coverings that, if followed, will ensure a long-lasting roof that keeps moisture from penetrating your house. The following information applies to asphalt shingles. It does not include asphalt-based roll roofing. This section applies to shingle roof-covering installation in almost all areas. Consult your local building inspector for additional requirements if you live in a very high wind speed design area, such as near the ocean.

“Asphalt shingles” is a fairly general description that includes three-tab, dimensional, and laminated shingles.

Always read and follow the shingle manufacturer’s instructions. They are printed on every package of shingles. Details that seem minor, such as failing to install the starter course or incorrectly installing nails, can make a big difference in how the shingles perform under stress. Failing to follow instructions can void the shingle warranty. This section applies to shingle roof-covering installation in almost all areas. Consult your local building inspector for additional requirements if you live in a very high wind speed design area, such as near the ocean.

Roof Slope & Sheathing

Roof Slope Restriction

1. Do not install shingles on roofs with a slope less than 2/12. Low slope and flat roofs require a roof covering designed for a low slope roof. Membranes, such as modified bitumen and EPDM, and standing seam metal are examples of low slope roof coverings.

2. Install a double underlayment layer under shingles on roofs with a slope between 2/12 and 4/12.

3. Verify shingle manufacturer’s instructions about minimum roof slope. Some do not allow installation on slopes less than 21/2/12.

Roof slope is measured by the number of inches the roof increases in height (rise) in 12” horizontally (run).

Roof Deck Type Restriction

1. Install shingle roof covering only on solid sheathed roofs. In residential construction this means roofs covered by OSB or plywood, which includes virtually all houses built in the last generation or two.

Endorsed products for roofing underlayment include roofing felt (building paper) in both #15 and #30 thickness as well as self-adhesive ice dam underlayment. Elastomeric roof cement is used for minor patching and sealing as well as for binding underlayment courses together.

Underlayment Specifications

1. Use at least #15 roofing felt (also called building paper). Other material, such as modified bitumen sheets and proprietary products from the shingle manufacturer, may be acceptable. Refer to general codes and manufacturer’s instructions for other acceptable underlayment materials.

Underlayment Application for Roof Slopes 4-in-12 & Greater

1. Begin at the eaves and apply at least a 36-inch-wide strip of underlayment parallel to the eaves.

2. Lap horizontal joints at least 2 inches with the upper strip over the lower strip.

3. Lap end joints as specified by the shingle manufacturer. End joint laps are usually between 4 and 6 inches.

4. Offset end joints by at least 6 feet.

5. Use sufficient fasteners to hold underlayment in place. The IRC does not specify fastener type and quantity.

6. Minimize wrinkles and distortions in the underlayment. Wrinkles should not interfere with the ability of the shingle’s sealing strips to seal. Underlayment wrinkles and distortions can appear through the shingles, creating a cosmetic issue.

Drip Edge

1. Install drip edge flashing at eaves and at gable rakes.

2. Use drip edge flashing that extends at least 1/4 inch below the roof sheathing and extends at least 2 inches up the roof deck.

3. Lap adjacent drip edge pieces at least 2 inches.

4. Attach drip edge using roofing nails spaced not more than 12 inches on center.

5. Install underlayment under the drip edge at rakes.

6. Install underlayment over the drip edge at eaves.

Proper installation of underlayment is important for reducing roof leaks. The underlayment should overlap the top of the drip edge at the eave, with the drip edge along the rake edges installed after the underlayment so it overlaps and directs runoff onto the underlayment.

Underlayment Application for Roof Slopes Between 2-in-12 & 4-in-12

1. Begin at the eaves and apply at least a 19-inch-wide strip of underlayment parallel to the eaves.

2. Begin again at the eaves and apply at least a 36-inch-wide strip of underlayment.

3. Lap each successive layer at least 19 inches over the previous layer, with the upper layer lapping over the lower layer.

4. Lap end joints at least 6 inches.

5. Use sufficient fasteners to hold underlayment in place. Most codes do not specify fastener type and quantity.

6. Install drip edge as previously described.

Underlayment Application in Ice Dam Areas

1. Install ice dam underlayment where there is a history of water backup at the eaves caused by ice. Verify ice dam requirements with the local building official. You do not need to install ice dam underlayment on unconditioned detached accessory structures, such as an unheated garage.

2. Install either a sheet of self-adhering, polymer-modified bitumen roofing or at least two layers of roofing felt bonded together with roofing cement. Begin the ice dam underlayment at the lowest edge of all roof surfaces, and extend it at least 24 inches beyond the exterior wall of the building.

3. Measure distances horizontally, not up the roof sheathing. Begin the 24-inch measurement from the interior side of the wall. Example: if the eaves extend 12 inches horizontally from the exterior wall of the building, extend the ice dam underlayment at least 39 inches horizontally from the edge of the eaves (assuming a 2 × 4 wall).

Install one or two courses (depending on local codes) of fully-bonded, self-adhesive ice dam underlayment in cold-weather climates. Ice dam underlayment helps prevent liquid water from running under the shingles and leaking into your home.

Roof Flashing

Roof flashing used with asphalt shingles is typically made of metal: primarily galvanized steel, aluminum, or copper. The timing for installing it depends on the type of flashing. Some, such as valley flashing, is installed prior to the finished roof covering (shingles). Other types, such as step-flashing, is interwoven with the shingles during the installation process. In some cases, formable, self-adhesive flashings can be used instead of metal. In some code areas, roll roofing may be used as valley flashing—check with your building inspector.

Closed-Cut Valley Flashing

1. Before installing the shingles, install valley flashing material according to the shingle manufacturer’s instructions. You may use at least a 36-inch-wide strip of smooth roll roofing material as valley flashing material with at least 18 inches on each side of the valley; or you may use any open valley lining material.

2. Place nails at least 6 inches away from the valley centerline, unless other spacing is approved by the shingle manufacturer.

3. Apply the shingles across one side of the valley at least 12 inches, or as recommended by the shingle manufacturer.

4. Apply shingles from the other direction to before the valley centerline, and trim the edges as recommended by the shingle manufacturer. Seal the cut shingles in a closed-cut valley, as recommend by the manufacturer. Sealing the cut shingles is frequently omitted.

Woven valleys are a common shingle valley treatment. Some manufacturers do not allow these valleys when using laminated shingles.

Closed-cut valley shingles are cut in a straight line about 2” from the valley center line. The cut should be on the side where the least amount of water is likely to flow.

Chimney Crickets

1. Install a cricket (also called a saddle) on chimneys that are more than 30 inches wide in the dimension parallel to the roof ridgeline. A cricket is not required if the chimney intersects the roof ridgeline. This also applies to factory-built chimneys that are installed inside a wood chimney chase.

2. Flash the cricket at the chimney wall using step and counter flashing that is compatible with the roof covering material.

3. Install the cricket with a vertical height at the chimney based on Table 23. W is the width of the chimney. Leave at least a 1-inch air space between a wood-framed cricket and a masonry chimney wall.

Step Flashing

1. Install step flashing at the intersections of a sloped roof and a vertical side wall. Use flashing that is at least 4 inches wide by 4 inches high. Install kick-out flashing at the end of the wall to direct water away from the side wall.

2. Flash the intersection of a sloped roof and a chimney according to the shingle manufacturer’s instructions. This typically includes step flashing covered with counter flashing.

3. Flash other roof penetrations, such as plumbing and gas vents, according to the shingle manufacturer’s instructions.

4. Flash skylights according to the skylight manufacturer’s instructions.

A cricket is a triangle-shaped raised area of a roof installed on the high side of a chimney to divert water around the chimney and help prevent leaking at the chimney. Improper installation and flashing of chimney crickets is a common cause of roof leaks.

Flash roof and sidewall intersections using step and counter flashing. Install kick-out flashing (inset) at the end of the wall.

Flash all penetrations, such as plumbing vents and equipment vents, with preformed flashing, often called boots. Make sure the flashing conforms to your roof slope.

Most skylights for residential installation come with a flashing kit. Improper installation and flashing of skylights is a common cause of roof leaks.

Integrate kickout flashing with sidewall flashing and the water-resistive material.

Flash brick veneer using base and counterflashing that is integrated with the water-resistant material.

A properly flashed roof/sidewall intersection includes roof covering underlayment, base and counterflashing, water-resistive material, and kickout flashing.

A headwall is where a roof rises to meet a sidewall. Flash headwalls using base and counterflashing integrated with water-resistive material.

Roofing Fasteners

Fastener Type & Quantity in Standard Shingling Conditions

1. Use the type and quantity of fasteners recommended by the shingle manufacturer. Locate nails on the shingle strip precisely as recommended by the shingle manufacturer. Some manufacturers recommend installing nails below the black adhesive seal strip. Other manufacturers leave a gap in the seal strip for installing nails. Do not install nails above the seal strip unless allowed by the manufacturer. Failure to comply with manufacturer’s installation instructions is a code violation and may void the manufacturer’s warranty.

2. Use corrosion-resistant roofing nails (usually galvanized steel) with at least a 12-gauge shank and a 3/8-inch-diameter head. Use nails long enough to penetrate into the roof sheathing at least 3/4 inch and completely through any sheathing that is less than 3/4 inch thick. Install at least four nails per shingle strip, with a nail at 1 inch from each end and two nails equally spaced in the center of the strip.

Fireplaces & Chimneys

Installing a factory-built or gas fireplace is a do-it-yourself project because you can design and build the fireplace frame to suit your needs and add your own finish treatments. It all starts with some careful planning. Once you decide on the fireplace model and determine where to place it, order all of the vent pipes and fittings needed to complete the vent run.

NOTE: Consult the manufacturer’s instructions for the specifications regarding placement, clearances, and venting methods for your fireplace.

Start your planning by determining the best location for the fireplace. Placing the unit next to an exterior wall simplifies the venting required. One important specification for a direct-vented gas fireplace located in a basement is that the termination cap (on the outside end of the vent) must be 12 inches above the ground and away from openings, such as windows and doors.

For help with any of these planning issues, talk with knowledgeable dealers in your area. They can help you choose the best fireplace model for your situation and help you with venting and other considerations. Remember that all installation specifications are governed by local building codes and that a building permit will be required. Check with the building department to make sure your plans conform to regulations.

NOTE: The information shown here apply specifically to masonry fireplaces, but many are useful guidelines for gas fireplaces as well.

Provide a hearth extension (the area of the floor adjoining the fireplace) that meets minimum size standards based on the square footage of the fireplace opening.

Masonry Fireplace Clearance to Combustible Materials

Masonry Fireplace Hearth Extension Clearance to Combustible Materials

1. The hearth extension is the area in front of the firebox. It must be made of non-combustible material upon which sparks and hot materials from the firebox may land without starting a fire. Tile and masonry units are typical.

2. Build a hearth extension for a masonry fireplace at least 16 inches in front of the firebox opening and at least 8 inches to the sides of the firebox opening, if the firebox opening is less than 6 square feet.

3. Build a hearth extension for a masonry fireplace at least 20 inches in front of the firebox opening and at least 12 inches to the side of the firebox opening, if the firebox opening is 6 square feet or more.

4. Build a hearth extension for a factory-built fireplace according to the fireplace manufacturer’s instructions. The hearth extension size is often the same as for a masonry fireplace.

Masonry Fireplace Clearance to Mantels & Trim

1. Locate all combustible mantels and wood trim at least 6 inches from a masonry fireplace opening.

2. Provide at least 1 inch of clearance to the masonry firebox opening for every 1/8 inch that combustible material projects from the fireplace surround. This applies to materials within 12 inches of the fireplace opening. Example: locate 1-inch-thick fireplace mantel legs at least 8 inches from the fireplace opening. Example: locate greater than 12 inches from the fireplace opening any part of a fireplace mantel or mantel leg that is more than 11/2 inches thick.

3. Provide clearance to combustible materials for a factory-built fireplace according to the fireplace manufacturer’s instructions. The clearance is often the same as for a masonry fireplace.

Spark Arrestor & Rain Cap

1. You are not required to install a spark arrestor or a rain cap on a masonry chimney, unless the local building official requires one. They are, however, recommended to protect the home and surrounding area from fire and to protect the chimney and home interior from water damage.

2. Comply with all of the following requirements for installed spark arrestors: (a) make the unobstructed arrestor area at least four times the area of the flue it serves; (b) make the arrestor screen using heat- and corrosion-resistant material equal to 19-gauge galvanized steel or 24-gauge stainless steel; (c) build the arrestor screen so it does not pass 1/2-inch-diameter spheres and does not obstruct 3/8-inch-diameter spheres; (d) make the arrestor accessible for cleaning and make the cap removable to allow for flue cleaning.

Chimney Used as Appliance Vent

1. Have a qualified contractor evaluate a chimney before using it to vent an appliance, such as a gas furnace or water heater, an oil-fired furnace, or a pellet stove. Chimneys that are too small may allow unsafe backdrafting of carbon monoxide into your home. Chimneys that are too large may allow water to condense in the chimney and cause considerable damage to the chimney.

2. Do not use a chimney as a gas appliance vent if any side of the chimney is exposed to the outdoors below the roofline. This means that a chimney must be completely enclosed within the house walls until it reaches the attic.

3. You may use a chimney as a vent for one draft hood-equipped gas water heater if the area of the chimney flue as at least as large as the area of the draft hood outlet and not more than seven times the area of the draft hood outlet.

4. Do not use a chimney as a vent for one fan-assisted, medium efficiency gas furnace.

5. Do not connect an appliance vent to a masonry chimney flue if the area of the appliance connector is larger than the area of the chimney flue.

6. Install a permanent label in a conspicuous location warning occupants if a chimney has been relined and warning them what types of appliances may be connected to the chimney.

7. Have gas appliance vents connected to masonry chimney flues according to the provisions for gas appliance vents in IRC Chapter 24.

Locate wood trim far enough from the firebox to avoid fires.

Wood-Burning Fireplace Energy Efficiency Requirements

1. Install an air barrier on fireplace walls.

2. Install doors with gaskets at fireplace openings.

3. Install a tight-fitting flue damper.

Combustion Air For Fireplaces

1. Provide combustion air from outside for solid fuel-burning masonry and factory-built fireplaces. Install combustion air ducts for factory-built fireplaces according to manufacturer’s instructions.

2. Provide combustion air from the outside for vented gas and oil fireplaces according to manufacturer’s instructions.

3. Locate the outside combustion air inlet at or below the firebox level. Cover the inlet with a screen having 1/4-inch mesh.

4. Install combustion air openings and ducts that have an area of at least 6 square inches and not more than 55 square inches. Use a combustion air duct that is designed for that purpose, or keep the duct at least 1 inch away from combustible materials within 5 feet from the firebox.

5. Locate the inside combustion air outlet in the back or side of the firebox or at hearth level and not more than 24 inches from the firebox opening.

6. Install a closure mechanism at the combustion air outlet.

Factory-Built Fireplaces

Factory-built fireplaces and chimneys include components tested, listed, and labeled to be installed together as a system. Such fireplaces are usually designed to burn solid fuels, such as wood, though they may be converted to use gas if approved by the fireplace manufacturer. Do not mix components from different manufacturers unless approved by the fireplace manufacturer.

Fireplaces designed to burn only gas are not really fireplaces. They are decorative gas appliances. Vented decorative gas appliances are more like a water heater than like a fireplace. Unvented decorative gas appliances are more like a gas range than like a fireplace. Install and use decorative gas appliances according to manufacturer’s instructions and IRC Chapter 24. Note that some jurisdictions do not allow unvented decorative gas appliances. Also note that manufacturers of unvented decorative gas appliances recommend limits on the duration of use.

Create wall surrounds for fireplaces with cementboard, which has some heat-resistant qualities and also makes a good backer for ceramic tile—a popular choice for finished fireplace surrounds.

Factory-Built Fireplace & Chimney Installation

Install factory-built chimneys and fireplaces according to the manufacturer’s instructions. These instructions include requirements for hearth extensions, clearances to combustible materials, and installation of combustion air ducts.

Decorative Chimney Covers

Do not install decorative chimney covers, shrouds, or similar components at the chimney termination unless the component is listed and labeled for use with your particular fireplace system.

Structural Support for Factory-Built Fireplaces

Provide adequate structural support for factory-built fireplaces and chimneys according to manufacturer’s recommendations.

Direct-vent gas fireplaces may be vented through a sidewall. Chimneys for wood-burning fireplaces are vertical.

Heating & Air Conditioning

Safety is the primary focus of code provisions governing heating and air conditioning systems. Improper appliance installation can cause the appliance to malfunction, creating a fire hazard as well as the potential for carbon monoxide poisoning. Fuel-burning appliances, such as gas and oil furnaces, must be installed in safe locations and must be provided with enough outside air to support fuel combustion. Vents for these appliances must be installed so that they do not ignite combustible materials and so that combustion gases are not circulated back into the building.

In this chapter you will learn about the safe installation of heating and air conditioning appliances and their associated venting equipment. You will also learn about how to identify improperly installed forced-air ducts that can increase your energy costs and decrease your appliance’s useful life.

HVAC Appliances

Heating, ventilation, and air conditioning systems are often referred to as a group by the term HVAC. This is because they share a common purpose: to keep the air in your home comfortable. All HVAC systems—even hot-water-based systems—rely on the flow of air to heat, cool, and ventilate your home.

Most homes today include two separate major appliances in the HVAC system: a furnace and a central air conditioning unit. In most cases, even when the AC has been retrofitted, the appliances share ductwork.

The information in this chapter is intended mostly for general education purposes and to assist with diagnosing system problems. Unless you are a very experienced DIYer, installing and servicing HVAC equipment is a job best left to professionals.

Central air conditioner parts include: (A) Power shutoff for service personnel, (B) Condenser unit, (C) Fan, (D) Condenser coil, (E) Compressor, (F) Plenum, (G) Evaporator coil, (H) Blower motor, (I) Filter, (J) Air return.

Gas furnace parts include: (A) Inshot burners, (B) Draft inducer fan, (C) Combustion air pipe, (D) Vent, (E) Heat exchanger, (F) Filter, (G) Blower motor.

Prohibited Locations for Appliance Installation

1. Do not locate gas or other fuel-burning appliances in bedrooms, bathrooms, toilet rooms, or storage closets. Do not draw combustion air for any fuel-burning appliance from these rooms regardless of where the appliance is located.

2. Do not locate appliances anywhere that is not approved by the manufacturer’s instructions.

3. Do not apply this provision to appliances powered only by electricity, such as heat pump air handlers and electric water heaters.

Exceptions: Prohibited Locations for Appliance Installation

1. You may install direct-vent appliances in prohibited locations if the appliance draws all combustion air directly from the outdoors.

2. You may install vented room heaters, vented wall furnaces, vented decorative appliances, and decorative appliances listed for installation in vented, solid fuel-burning fireplaces (such as gas logs) in prohibited locations if the room satisfies combustion air volume requirements.

3. You may install one listed, wall-mounted, unvented room heater in a bathroom if the appliance has an oxygen depletion safety shutoff system, the appliance input rating is not more than 6,000 BTU/hour, and the bathroom satisfies combustion air volume requirements.

4. You may install one listed, wall-mounted, unvented room heater in a bedroom if the appliance has an oxygen depletion safety shutoff system, the appliance input rating is not more than 10,000 BTU/hour, and the bedroom satisfies combustion air volume requirements.

5. You may install appliances in an enclosure accessible from the prohibited locations if all combustion air is drawn directly from the outdoors and the enclosure is equipped with a self-closing door that is weather-stripped.

6. The standard combustion air volume requirement is at least 50 cubic feet per 1,000 BTU/hour appliance input rating. This standard volume requirement does not apply if the home is tightly sealed with a known air infiltration rate of less than 0.40 air changes per hour. Tightly sealed homes are rare.

A typical forced air heating system delivers heated air to a room through registers while drawing cool air through return ducts. The cool air is reheated in the furnace and recirculated for maximum efficiency. A fresh air intake provides a constant supply of combustion air.

An air intake vent that draws combustion air into the system allows you to install appliances in areas that lack adequate combustion air. The vent shown is for a high-efficiency gas furnace.

Electric baseboard heaters often are used to provide supplementary heat. Models (such as the one here) that do not produce external temperatures greater than 125°F may be mounted directly to drywall walls, but a clear space should be maintained between the appliance and the floor.

Electric Radiant (Baseboard) Heating Systems

Electric radiant heating systems provide heat to a single room. They usually have no fan and provide heat by natural movement of the heated air and by thermal radiation. They are common in small, seasonally occupied buildings, some rural homes, and in buildings without ducts for forced-air heating and cooling. These elements become very hot, and proper installation is important to prevent fires and electrical problems.

Installation Requirements

1. Install electric radiant heating panels according to manufacturer’s installation instructions and applicable provisions of general and local codes.

2. Install radiant panels parallel to wood framing members, and fasten the panels to the surface of the framing members or mount the panels between framing members.

3. Install fasteners only in areas of the appliance’s radiant panel designed for fasteners. Install fasteners at least 1/4 inch away from a heating element.

4. Install radiant panels as complete units, unless listed and labeled for field modifications.

5. Do not install radiant panels on drywall unless the panel’s maximum operating temperature is not more than 125 degrees Fahrenheit.

Appliances Installed in Garages

In warmer areas of the country some major household appliances are routinely located in garages to conserve interior floorspace. Water heaters are code-regulated to be installed in garages. Others, such as central vacuum units, should be installed following the manufacturer’s instructions and best practices, but typically they are not subject to specific codes beyond applicable wiring, plumbing, and fire safety codes.

Elevated Appliances in Garages

1. Elevate the appliance ignition source at least 18 inches above the floor when the appliance is located in a garage or in an unconditioned room that opens directly into the garage. Appliances with a potential ignition source include gas and electric water heaters, gas and electric clothes dryers, gas and electric furnaces, and heat pumps with auxiliary resistance-heating elements. Rooms that open directly into the garage include storage and utility rooms that are not part of the conditioned living space. These rooms include rooms separated from the garage by a door opening into the garage.

2. Measure the elevation distance to the ignition source in the equipment, not to the bottom of the equipment (unless the ignition source is at the bottom of the equipment).

3. You may install appliances on the floor in rooms that are adjacent to a garage but do not have an opening into the garage.

4. You are not required to elevate the ignition source of flammable vapor ignition resistant (FVIR) gas water heaters. All new gas water heaters are FVIR (and have been for many years).

Appliances, such as water heaters, that are installed in a garage must have the ignition source elevated at least 18” off the floor.

Protection of Appliances from Vehicles

1. Protect HVAC appliances and water heaters from vehicle impact. The appliance or water heater does not need to be located in a garage or carport to qualify for protection from vehicle impact. General codes do not specify how to provide this protection. Common protection methods include steel poles called bollards, vehicle tire stops, and encasing the equipment in substantial framing.

HVAC Appliance & Duct Sizing

Appliance Sizing

1. Size heating and cooling appliances according to The Air Conditioning Contractors of America (ACCA) Manual S or a similar approved method. Manual S and Manual J account for conditions such as the direction the structure faces, the size and type of windows and doors, local temperature conditions, and insulation. Contractors should provide a copy of the sizing calculations for all new construction and when replacing existing appliances. Improper appliance sizing may cause inefficient appliance operation or may allow excessive moisture to remain in the home. Excessive moisture can damage the home and provide moisture for mold growth.

Duct Design

1. Design duct systems according to ACCA Manual D or a similar approved method. Contractors should provide a copy of the duct design calculations for all new construction. Improper duct sizing and installation can cause inefficient appliance operation and can cause uneven temperatures in the home.

Air Conditioner Condensate Disposal

The process of removing heat from the air is often called air conditioning. Water is a byproduct of air conditioning, because water vapor condenses out from the air when the air temperature is reduced. In areas with high humidity, air conditioning can produce significant amounts of water. The water removed from the air during air conditioning is called condensate.

Condensate Disposal Location Requirements

1. Do not discharge condensate onto a street, alley, or any other place that would create a nuisance. Some jurisdictions, particularly in warm, moist areas, require that you discharge condensate away from the foundation. Verify discharge location requirements with the local building official.

Condensate from air conditioner units should be directed to a drain through discharge pipes. NOTE: Due to acidity, avoid draining condensate to floor drain in older homes with cast iron sewer lines.

Condensate Discharge Pipe Requirements

1. Use at least 3/4-inch-diameter pipe for primary and auxiliary condensate discharge pipes. Do not decrease pipe size between the collection and discharge point.

2. Install horizontal pipe sections with a uniform slope in the direction of the discharge point of at least 1/8 inch in 12 inches.

3. Use fittings, primers, cements, hangers, and other components that are compatible with the pipe material. Install the pipe according to the provisions in general codes.

4. Use pipe material use a pipe size that will accommodate the condensate temperature, pressure, and flow rate produced by the air conditioning system.

5. Install a trap in the primary condensate discharge pipe according to the appliance manufacturer’s instructions. The minimum trap depth is often about 2 inches.

6. You may use most water supply and drain pipes for condensate discharge pipes. The most common condensate discharge pipes are PVC, CPVC, and ABS.

7. Connect a condensate pump to the appliance it serves so that the appliance will not operate if the pump will not operate. This applies to pumps located in spaces such as attics and crawlspaces.

Condensate Auxiliary (Backup) System Requirements

1. Install an auxiliary condensate system when the air conditioner evaporator coil is located where building damaage may occur if the primary condensate discharge system malfunctions. This usually applies to evaporator coils installed in or above finished space. Many jurisdictions require auxiliary condensate systems for all air conditioning systems, unless all of the equipment is located outside the building.

2. Install one of the following auxiliary condensate systems when an auxiliary condensate system is required: (a) Install an auxiliary drain pan under the evaporator coil. Use a pan that is at least 11/2 inches deep and at least 3 inches larger than the evaporator coil in both length and width. Construct the pan using either at least 0.0276-inch galvanized sheet metal or at least a 0.0625-inch, nonmetallic pan. Slope the pan toward the discharge pipe connection. Install the auxiliary discharge pipe using the same materials and methods as the primary discharge pipe. Terminate the auxiliary discharge pipe at a conspicuous point so that the occupants can see when the primary condensate discharge system is not functioning properly (a conspicuous point often means above a window). (b) Install a water level cutoff switch above the primary condensate discharge pipe where it connects to the evaporator coil and below the evaporator coil interior condensate pan overflow rim. Or, you may install the switch in the primary or secondary discharge pipes. The switch location should allow the switch to shut off the air conditioner before water overflows into the building.

HVAC Duct Installation

Improper duct installation and duct damage are common problems. Ducts that leak, have sharp bends, or sag reduce the volume of air that moves through the duct and increase the friction between the air and the duct walls. This causes the HVAC system to work harder and longer than necessary, wasting energy and money.

Flexible HVAC Duct Installation

General Installation Requirements

1. Install flexible ducts according to manufac-turer’s installation instructions. The installation instructions that follow are based on material from the Air Diffusion Council. The full, original version may be downloaded from their website (see Resources).

2. Use flexible ducts that are labeled at least every 36 inches with information, such as the manufacturer’s name and the R-value of the duct insulation.

3. Do not expose flexible ducts to direct sunlight, such as may occur under roof vents. Direct sunlight can damage the duct outer cover.

4. Extend flexible duct to its full length. Do not leave excess duct material in a duct run, and do not compress the duct.

Duct Support

1. Support flexible ducts using material at least 11/2 inches wide. You may support flexible ducts on 11/2-inch-wide framing.

2. Support flexible ducts at not more than 4-foot intervals. You may use a fitting or distribution plenum to provide initial flexible duct support.

3. Do not allow flexible duct to sag between supports more than 1/2 inch per foot.

4. Support bends in long horizontal runs of flexible duct at not more than one duct diameter on both sides of the bend.

5. Support bends in flexible duct that occur near the plenum connection. Allow flexible ducts to run at least several inches beyond a plenum connection before making a bend.

6. Provide independent support for duct fittings and distribution plenums. Support duct fittings at not more than 1 foot from the fitting.

7. Support vertical runs of flexible duct at more than 6-foot intervals.

Flexible ductwork may not be bent at an overly tight angle. The radius of any curved bend should be no less than the diameter of the duct.

Intervals between supports (hangers) for flexible HVAC ductwork can be no more than 4’ apart.

Duct Bends

1. Do not bend flexible ducts at sharp angles across obstructions, such as framing lumber and pipes. Such bends reduce the duct area and restrict air flow.

2. Do not bend flexible ducts so that the bend radius at the centerline is less than one duct diameter.

3. Avoid changing the shape of the duct. The area of a round duct is greater than the area of the same duct compressed into an ellipse.

Duct Connections & Splices

1. Connect and splice ducts according to manufacturer’s instructions.

2. Connect flexible ducts to metal collars that are at least 2 inches long.

3. Splice two ducts together using a metal sleeve at least 4 inches long.

4. Use approved clamps and tape to secure nonmetallic flexible ducts to metal collars and sleeves.

5. Use approved tape and mastic to seal duct collars, plenums, and other fittings to ensure minimum air leakage.

Duct Insulation & Sealing

1. Insulate HVAC supply ducts located in attics to at least R-8. Insulate all other ducts to at least R-6.

2. You are not required to insulate ducts that are completely within conditioned space.

3. Seal ducts, furnaces, air handler, filter boxes, junction boxes, and fittings.

4. Verify duct and air handler sealing with a duct pressure test. You may perform this test during rough-in or after final installation of the HVAC system. Refer to the IRC for test requirements.

5. Do not use framing cavities, such as stud walls and floor framing, as HVAC ducts or plenums.

Prohibited Sources for Return & Outdoor Air

Prohibited Sources of Return Air

1. Do not locate a return air register in a closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or an unconditioned attic.

2. Do not locate a return register closer than 10 feet in any direction to an open combustion chamber or to a draft hood-equipped appliance. Common examples of these prohibited sources include a fireplace and a water heater.

3. Do not take more return air from a room or a space than is supplied to that room or space.

Prohibited Sources of Outdoor Air

1. Locate outdoor air intake openings connected to forced-air heating and cooling systems at least 10 feet horizontally from contaminant sources, including gas equipment vents, chimneys, plumbing vents, or the discharge outlet of an exhaust fan.

2. You may locate outdoor air intake openings closer than 10 feet horizontally to a contaminant source if the outdoor air intake opening is at least 3 feet below the contaminant source.

3. Do not locate outdoor air intake openings where objectionable odors, fumes, or flammable vapors may be present.

4. Locate outdoor air intake openings at least 10 feet above a public walkway or driveway.

5. Do not locate outdoor air intake openings at grade level next to a sidewalk, street, alley, or driveway.

6. Provide an automatic or gravity-operated damper for air intake systems that will close the damper when the system is not operating.

Combustion Air for Fuel-Burning Appliances

Fuel-burning appliances, such as gas furnaces, boilers, and water heaters, need air to support the fuel-burning (combustion) process. These appliances also need air for cooling, ventilation of the appliance, and for proper operation of the vent system that expels combustion byproducts outside. The air required to support operation of fuel-burning appliances is called combustion air.

Without adequate combustion air, incomplete fuel combustion may occur. Byproducts of incomplete fuel combustion can include carbon monoxide and soot that can damage the appliance and its vent. This is a health and safety hazard. Appliances operating without adequate combustion air can cost more to operate and maintain.

Do not confuse combustion air with the similar term “makeup air.” Makeup air replaces air that is exhausted by clothes dryers, exhaust fans, fireplaces, and similar devices.

Appliances Needing Combustion Air

1. Provide combustion air for Category I gas appliances and for liquid fuel-burning (oil) appliances according to the appliance manufacturer’s recommendations and to code requirements. Category I gas appliances include the gas furnaces and water heaters found in most homes.

2. Provide combustion air for direct vent and for Category II, III, and IV gas appliances according to the appliance manufacturer’s instructions. Do not apply combustion air requirements to these appliances. Category II appliances do not currently exist. Category III and IV appliances include medium and high-efficiency gas appliances that operate with positive vent pressure.

3. Do not apply combustion air requirements to fireplaces and fireplace stoves. Refer to other general codes for fireplace combustion air requirements.

Fuel for appliances (natural gas, propane, fuel oil) requires an adequate supply of fresh combustion air for efficient burning, as well as a means of effective venting.

Combustion Air Duct Materials & Construction

1. Use galvanized steel to construct combustion air ducts. Refer to other general codes for duct material specifications.

2. You may use unobstructed stud and joist spaces as combustion air ducts if only one required fireblock is removed.

3. Terminate combustion air ducts in unobstructed space that allows free air movement.

4. Do not open combustion air ducts into more than one room or enclosure.

5. Do not use the same combustion air duct for both the upper and lower duct openings.

6. Do not install a screen on any combustion air duct opening in the attic.

7. Do not slope horizontal combustion air ducts downward toward the source of combustion air. Make the duct level or slope it toward the appliance.

8. Do not use the space in a masonry, metal, or factory-built chimney that surrounds a chimney liner, gas vent, plastic piping, or other devices as a combustion air duct.

9. Locate the lowest point of an exterior combustion air opening at least 12 inches above exterior grade.

Combustion Air from Within a Room

Combustion air may be drawn from the room where the appliance is located if the room is large enough. Consult with an engineer or inspector to help you determine if the room meets the minimum size requirement for your appliance.

Combustion Air Using One Permanent Opening to Outdoors

Import combustion air by creating one permanent opening to the outdoors. To do this, draw air in from an opening in an exterior wall or from an opening in the roof.

Vents for Fuel-Burning Appliances

A vent is generally a vertical component, such as a metal pipe, that conducts combustion products from a gas- or oil-burning appliance to the outdoors. A vent for a single appliance begins at the fitting where the vent connector, if any, connects to the vent. A common vent for multiple appliances begins at the highest connector fitting. If a vent is located directly over the appliance draft hood or flue collar, or if the vent connects directly to the appliance, then the vent begins at the appliance and there is no vent connector.

A vent connector is a pipe that connects an appliance to its vent or flue. A vent connector is required if the appliance is not located directly under its vent. A vent connector for a Category I gas appliance may be a listed vent material, such as a Type B vent; a listed flexible vent connector; or a field-constructed, single-wall metal pipe made of at least 28-gauge galvanized steel. While a vent connector is part of the venting system, it is not the vent itself.

Common types of vents and vent connectors include the Type B vent used with most gas appliances, Type L vents used with oil-burning appliances, flexible connectors used with gas appliances, and single-wall connectors that may be used with either gas or oil-burning appliances.

The material in this section deals with vents for low- and medium-efficiency appliances. Fewer of these appliances are being installed in favor of high-efficiency appliances and appliances with special venting requirements. Examples of special-vented appliances include high-efficiency gas furnaces (vented with plastic pipe), sidewall-vented appliances, and appliances using positive pressure vent systems. Do not apply the material in this section to special-vented appliances.

Venting of special-vented appliances is governed by the appliance manufacturer’s instructions. These instructions will vary by manufacturer and by appliance model. Thus, the only way to determine if a special-vented appliance vent is installed properly is to compare the appliance vent installation to the instructions for the appliance in question.

Vents for special-vented appliances are frequently improperly installed. Proper vent (and combustion air) installation is important for proper and safe appliance operation. It is a good idea to evaluate and confirm vent installation for special-vented appliances.

Vent connectors and fittings include: (A) Single wall-vent connector; (B) Type B elbow; (C) Type B vent; (D) Type L vent; (E, F) vent caps.

Vents and vent connectors often look the same, but they have different installation requirements.

Vent Clearance to Combustible Materials

1. Provide the distance between a vent or a vent connector and combustible materials based on the vent or vent connector manufacturer’s installation instructions and based on the appliance manufacturer’s installation instructions. Table 24 contains typical clearance distances for common types of vents and vent connectors. Confirm the distances in Table 24 with the appliance manufacturer’s instructions and the vent manufacturer’s instructions.

Vent Clearance to Roof & Obstructions

1. Terminate a Type L vent at least 2 feet above the roof and at least 2 feet above any part of the home within 10 feet of the vent. Measure termination height above the roof from the highest point where the vent penetrates the roof to the bottom of the vent cap.

2. Terminate a masonry chimney at least 3 feet above the roof and at least 2 feet above any part of the building within 10 feet of the chimney. Measure termination height above the roof from the highest point where the chimney penetrates the roof to where the flue exits the chimney. This provision also applies to many factory-built chimneys. Confirm factory-built chimney termination height using the manufacturer’s installation instructions.

3. Use Table 25 to determine the minimum height above the roof of a Type B gas vent not more than 12 inches in diameter. Measure termination height above the roof from the highest point where the vent penetrates the roof to the bottom of the listed cap. For thick roof-covering materials, such as tile, measure from the tile to the bottom of the listed cap.

4. Do not use Table 25 if a Type B vent is closer than 8 feet to a vertical side wall, gable end, or similar vertical obstruction. Terminate these vents at least 2 feet higher than the highest point where the vent penetrates the roof and at least 2 feet higher than any part of the roof or building within 10 feet horizontally.

5. Terminate all vents and chimneys at least 8 feet horizontally from operable windows unless the vent is at least 3 feet above the window.

6. Do not install a vent terminal where a door can swing within 12 inches horizontally from the vent terminal. This will apply mostly to direct vent terminals.

7. Do not install a decorative shroud or surround at a vent termination unless the shroud or surround is listed for use with the specific venting system and unless the shroud or surround is installed according to manufacturer’s instructions. This prevents an unlisted shroud from interfering with the drafting characteristics of the vent system.

Avoid fires by maintaining distance between vents and combustible materials.

Joints Between Vents & Vent Connector Sections

1. Secure joints between the vent or vent connector and the flue collar or draft hood, vent or vent connector sections, and vent connector and the vent using (a) sheet metal screws (usually three); (b) listed, interlocking vent material (such as Type B vent) connected according to the vent manufacturer’s instructions; or (c) other approved means.

Slope of Vents & Vent Connectors

1. Slope vents and vent connectors up toward the roof termination at least 1/4 inch per foot. Do not allow any dips or sags in the vent or vent connector.

Appliances Not Requiring a Vent

1. You are not required to vent the following gas appliances: (a) ranges and other domestic cooking appliances listed and labeled for optional venting; (b) domestic (Type 1) clothes dryers; (c) portable, countertop, and similar small kitchen and laundry appliances; (d) gas-fueled refrigerators; (e) listed, unvented room heaters; and (f) listed, unvented decorative gas appliances (unvented gas fireplaces).

2. Verify venting requirements using manufacturer’s instructions. Some manufacturers of appliances such as unvented gas fireplaces recommend limiting the duration of use and/or opening a window while the appliance is operating.

A gas vent roof terminator cap protects the vent from moisture and pests. These caps are designed so they do not impede or restrict air flow.

Plumbing System

Plumbing projects are popular among do-it-yourselfers, so naturally there’s a strong demand for information on home plumbing subjects to make sure home projects are accomplished correctly. Water supply pipes must be properly sized, supported, and connected to avoid water leaks and low water flow at fixtures.

Wastewater drain pipes must be properly installed to avoid water leaks and sewage backups. Traps and vents must be correctly hooked up in drain lines.

Finally, in this chapter you’ll learn basic requirements for installing water supply pipes and water drain and vent pipes, as well as for installing common plumbing fixtures, such as water heaters, faucets, tubs, and showers.

The Home Plumbing System

Water Supply Piping

Water supply pipes carry hot and cold water throughout a house. In homes built before 1960, the original supply pipes were usually made of galvanized steel. Newer homes have supply pipes made of copper. In most areas of the country, supply pipes made of rigid plastic or PEX are accepted by local plumbing codes.

Water supply pipes are made to withstand the high pressures of the water supply system. They have small diameters, usually 1/2 inch to 1 inch, and are joined with strong, watertight fittings. The hot and cold pipes run in tandem to most parts of the house. Usually, the supply pipes run inside wall cavities or are strapped to the undersides of floor joists. They are sometimes run in the attic in warm climates.

Hot and cold water supply pipes are connected to most fixtures and appliances. Fixtures include sinks, tubs, and showers. Some fixtures, such as toilets and hose bibbs, are supplied only by cold water. Appliances include dishwashers and clothes washers. A refrigerator icemaker uses only cold water. Tradition and codes say that hot water supply pipes and faucet handles are found on the left-hand side of a fixture, with cold water on the right.

Because it is pressurized, the water supply system is prone to leaks. This is especially true of galvanized iron pipe, which has limited resistance to corrosion.

Water Pressure vs. Water Flow

Water flow and water pressure are often confused. Water flow is the amount of water you can get from a full water pipe. Water pressure is the amount of force that the water exerts on the walls of a full water pipe. Once a pipe is full of water, a water pressure increase will not increase the water flow in the pipe. In fact, a water pressure increase beyond a certain amount will cause the pipe to burst. The ideal water pressure is between 40 and 60 pounds per square inch (psi).

Water flow is primarily a function of the size, type, and installation of water supply pipes and supply fixtures. You can achieve more flow in a larger pipe than you can in a smaller pipe. Different pipe materials, such as PEX and copper, have different flow rates for the same size pipe. Many current water supply fixtures have flow restriction devices that limit the water flow rate to conserve water.

Water pressure is primarily a function of the force behind the water as it enters the piping system. A system with too little water pressure may not provide sufficient water flow when multiple supply fixtures are being used. Too much water pressure, exceeding 80 psi, can cause premature failure of water supply pipes and fixtures. A pressure regulator is recommended to reduce excessive water pressure.

Install a pressure regulator when the water pressure exceeds 80 psi.

Minimum & Maximum Water Pressure

1. Provide each dwelling with enough water pressure to provide adequate water flow at all fixtures. There is no specific minimum water pressure. This applies to both public and private (well supplied) water supplies.

2. Do not exceed 80 psi static water pressure.

3. Install an approved pressure regulator at the main water supply connection to the dwelling if the static pressure exceeds the maximum. Measure the water pressure to the point where the water supply enters the building as closely as possible.

Minimum Flow Rate at Fixtures

1. Provide at least the water flow rate in Table 26 for the indicated fixtures. Water flow rate is measured in gallons per minute (gpm). Water flow rate means the water flow from the pipe without the fixture attached. The water flow rate in the table does not mean that the water flow from the fixture must be at least the amount in the table. Some fixtures contain required flow restrictors that will limit the actual water flow from the fixture to less than the water flow rate in the table. Example: the minimum water flow rate for a shower is 3 gallons per minute, but the maximum flow-restricted rate from the showerhead is 2.5 gallons per minute.

Maximum Flow Rate at Fixtures

1. Use fixtures that allow a water flow rate that is not more than the flow rate in Table 27. Water flow rate is measured in gallons per minute (gpm). If either the water supply pressure to the building or the water pressure loss in the pipes reduces the water pressure at the fixture to less than the design pressure, the flow rate at a flow-restricted fixture may be less than the maximum.

Common Water Distribution Pipes

1. Install water service pipe that has a working pressure rating of at least 160 psi at 73 degrees Fahrenheit or the highest available pressure, whichever is greater.

2. Common water distribution pipe materials used in modern residential construction include those in Table 28.

3. You may use other approved materials if allowed by local codes. Copper, CPVC, and PEX are the most common water distribution pipes.

Water supply pipes include: copper, CPVC, and PEX (blue for cold, red for hot).

Fittings for water supply lines include: (A) CPVC tee, elbow and coupling; (B) copper tees and elbows; (C) brass compression fittings; (D) brass fittings, with barbs.

Water Distribution Pipe Joints & Connections

1. Use fittings made from the same material as the pipe when connecting pipes made from the same material. Example: use copper fittings to connect copper pipe and CPVC fittings to connect CPVC pipe. Use solder or brazing to connect copper pipes. Use PVC cement and primer to connect CPVC pipes.

2. You may use flared fittings to make connections between soft copper water tubing and valves and fixtures. Use approved fittings and a flaring tool to form and connect these joints.

3. Use fittings and crimping tools approved by the tubing manufacturer when connecting PEX and other water supply materials to each other. Most homeowners should not attempt to install PEX and similar materials using these fittings and tools because this requires training and experience.

4. Use push-fit fittings only with copper tubing, CPVC, and PEX. Do not use push-fit fittings with other pipe and tubing, such as polybutylene.

5. You may use mechanical fittings to connect pipes made from the same materials and pipes made from different materials. Install the fittings according to manufacturer’s instructions.

Flexible Water Connectors

1. Use flexible water connectors to connect water supply pipes to appliances and fixtures. Examples of proper uses of flexible water connectors: connecting water supply pipes and a water heater, connecting valves and a clothes washing machine or a dishwashing machine, connecting a refrigerator icemaker and a valve, and connecting a valve and a faucet.

2. Use a flexible water connector that is approved for the application. Example: do not use a connector intended for a clothes washing machine to connect a water heater to the hot water supply pipe.

3. Do not run flexible water connectors through walls, ceilings, and floors or in concealed spaces.

4. Do not use flexible water connectors as a substitute for permanent water supply pipes.

Using fittings made from the same material as the pipe is the least expensive way to connect pipes.

Using mechanical fittings is a good (but more expensive) way for homeowners to connect different pipe types together and to connect pipes of the same type together.

Use flexible water connectors according to manufacturer’s instructions. Avoid using plastic tubing. This material can burst and cause significant water damage.

Pipe Support

1. Support pipes so they will maintain alignment and will not sag.

2. Support and install pipes so they can move with the normal expansion and contraction of the piping system without scraping or rubbing against supports or framing materials.

3. Use pipe supports that will carry the weight of the pipe and that are sufficiently wide to prevent crimping and distortion of the pipe.

4. Use pipe supports that will not cause corrosion or galvanic reaction between the pipe and the support. Example: do not use steel supports with copper pipe or copper supports with cast-iron pipe.

5. Provide rigid sway bracing at changes in pipe direction more than 45 degrees for pipe sizes at least 4 inches in diameter.

6. Provide horizontal and vertical support for pipes according to Table 30.

Support hangers and clamps for: CPVC and PVC (A), Copper (B), PEX (C).

Support copper tubing with compatible hangers.

Support for PEX tubing is particularly important near manifolds and fittings.

Provide vertical support for pipes running parallel to wall studs. Install supports according to Table 29.

Protect pipes 1 1/2 ” from the edges of studs and joists.

Protecting Pipes from Puncture & Corrosion

1. Protect plumbing pipes (other than cast iron or galvanized steel) with shield plates, if the pipe is run through holes that are closer than 11/4 inches from the edge of studs, joists, rafters, or similar framing members. Extend the shield plate at least 2 inches below top plates and at least 2 inches above bottom plates.

2. Use shield plates at least 1/16-inch thick.

3. Apply these rules to pipes running through holes and notches in framing materials. While not required by most general codes, it is a best practice to protect pipes (other than cast iron or galvanized steel) that are closer than 11/2 inches from the edge of framing materials. The most common example of such pipes is a pipe installed parallel to the edge of a stud or joist.

4. Protect copper plumbing pipe from corrosion where it passes through masonry or concrete. You may use pipe wrapping material designed for this purpose, or you may enclose the pipe in a sleeve.

5. Protect gas pipes, other than steel, with shield plates if the pipe is closer than 11/2 inches from the edge of studs, joists, rafters, or similar framing members. Extend the shield plate at least 4 inches below top plates and at least 4 inches above bottom plates.

Protecting Pipes from Freezing

1. Do not install water supply and waste pipes outside of a building, in exterior building walls, in attics and crawl spaces, or in any other place subject to freezing temperatures, unless the pipes are protected by insulation or heat or both.

2. Install water service pipe at least 12 inches deep or at least 6 inches below the frost line.

3. Verify minimum water service and building sewer pipe depth with the local building official.

4. Apply these requirements only to areas with a winter design temperature of 32 degrees Fahrenheit or less.

Fixture Cutoff Valve (Angle Stop)

1. Provide each plumbing fixture, except for bathtubs and showers, with an accessible cutoff valve on the hot and cold water supply pipes. These valves are sometimes called “angle stop valves.” You may install cutoff valves at bathtubs and showers, but these valves are not required.

Valves & Outlets Installed Below Ground

1. Do not install water supply outlets and stop-and-waste valves below ground. Example: do not install a hose bibb below ground.

2. You may install a freeze-proof yard hydrant below ground if the water supply to the hydrant is protected with a backflow preventer and the yard hydrant is permanently labeled as a “non-potable water source.”

Hose Bibb Cutoff Valve

1. Provide hose bibbs that are subject to freezing with a stop-and-waste valve inside the building. This includes frost-proof hose bibbs.

2. You need not install a stop-and-waste valve on a frost-proof hose bibb if the stem extends into an open heated or semi-conditioned area of the building.

Hose bibbs that are subject to freezing require a stop-and-waste valve inside the building.

Drain, Waste & Vent Piping (DWV)

Drainpipes use gravity to carry wastewater away from fixtures, appliances, and other drains. This wastewater is carried out of the house to a municipal sewer system or septic tank.

Drainpipes are usually plastic or cast iron. In some older homes, drainpipes may be made of copper, galvanized steel, or lead. Because they are not part of the supply system, lead drainpipes pose no health hazard. However, lead pipes are no longer manufactured for home plumbing systems.

Drainpipes have diameters ranging from 11/4 inches to 4 inches. These large diameters allow waste to pass through easily.

Traps are an important part of the drain system. These curved sections of drainpipe hold standing water, and they are usually found near any drain opening. The standing water of a trap prevents sewer gases from backing up into the home. Each time a drain is used, the standing trap water is flushed away and replaced by new water.

In order to work properly, the drain system requires air. Air protects trap from being drained. To allow air into the drain system, drainpipes are connected to vent pipes. All drain systems must include vents, and the entire system is called the drain-waste-vent (DWV) system. One or more vents, located on the roof, provide the air needed for the DWV system to work.

Use vent tee fittings only in vent pipes, not in drain pipes that carry wastewater. Drain pipes must maintain a minimum 2 percent slope.

Common sewer pipe materials PVC (A) or ABS (B) are allowed for use in DWV systems. Cast iron is also allowed but is rarely used in residential construction.

Drain & Sewer Pipe General Requirements

1. Install fittings that have a smooth interior surface and are compatible with the pipe to which they are attached. Example: do not use ABS fittings with PVC pipe.

2. Do not use fittings that contain ledges, shoulders, or reductions that may retard or obstruct drainage flow.

3. Install fittings that maintain a 2 percent slope and are approved for use where installed. Example: do not use a vent tee in a drainage pipe where water flows.

4. Do not use threaded connections in pipes where the threads run on the inside of the pipe and could retard or obstruct drainage flow.

5. Do not drill, tap, burn, or weld drainage, sewer, or vent pipes. Example: do not drill into a vent pipe to insert the discharge hose from a water softener.

6. Do not use the following types of joints and connections: cement or concrete, mastic or hot-pour bituminous, fittings not approved for the specific type of pipe or installation, joints between different pipe diameters made with elastomeric rolling O-rings, solvent-cement joints between different types of plastic pipe, and saddle fittings.

Common DWV Pipe Material

1. You may use any of the common drainage and sewer pipe materials listed in Table 30. You may use other materials listed if approved by your local codes.

2. Install galvanized steel drainage pipe at least 6 inches above the ground.

Water Closet Connection between Closet Flange & Pipe

1. You may use a 3-inch quarter bend to connect to a closet flange if you install a 4-inch-by-3-inch flange to receive the closet fixture horn.

2. You may use a 4-inch-by-3-inch reducing closet bend to connect to the closet flange.

Tailpieces

1. Provide sinks, dishwashers, laundry tubs, and similar fixtures with tailpieces and traps at least 11/2 inches in diameter.

2. Provide vanity sinks, bidets, and similar fixtures with tailpieces and traps at least 11/4 inches.

Slip Joints

1. Use slip joints only between the fixture outlet and the connection with the drainage pipe.

2. Provide slip joints with access of at least 12 by 12 inches.

4 × 3 reducing closet bend (horn).

Drain tailpieces must match the diameter of the other pipes in the drain kit: 11/4 or 11/2” depending on the type of fixture being drained.

Chromed P-trap with slip joints on lavatory sink.

VIOLATION! Flexible, ribbed material may be used only in a vertical direction as a sink tailpiece.

Drain & Sewer Pipe Connections & Joints

Changing flow direction from vertical to horizontal using a wye fitting and 1/8 bend.

Changing flow direction from vertical to horizontal using a tee-wye.

Changing flow direction from vertical to horizontal using two 1/8 bends.

Changing flow direction from horizontal to horizontal using a long sweep fitting.

Changing flow direction from horizontal to horizontal using a wye fitting.

Changing flow direction from horizontal to horizontal using a long-radius tee-wye fitting.

Changing flow direction from horizontal to vertical using: sanitary tee (A), 1/8 bend (B), wye (C).

Drainage & Sewer Pipe Fittings for Changing Flow Direction

1. Use the fittings in Table 32 to change the direction of flow in drainage and sewer pipes.

Drainage & Sewer Pipe Fittings: Changing from Horizontal to Vertical Using Multiple Fittings

1. You may use multiple fittings and double fittings (such as double sanitary tees) to connect back-to-back fixtures and two or more branch drains on the same level if directly opposite fitting connections are from the same size pipe and if directly opposite fitting connections are from similar fixture types or fixture groups.

2. Do not use a double sanitary tee to receive discharge from back-to-back toilets or from fixtures or appliances with pumping action (such as washing machines and dishwashers). You may use a double sanitary tee if the distance between the center of the closet flange and the inlet of the sanitary tee is at least 18 inches.

Quarter Bends with Heel or Side-Inlet

1. You may not use a heel inlet quarter bend to change flow direction from vertical to horizontal if the fitting serves a toilet. You may use a heel inlet quarter bend to change flow direction from horizontal to vertical without restrictions.

2. You may not connect wet vented fixtures to the low heel inlet of a heel inlet quarter bend.

3. You may use the side inlet of a quarter bend to change the flow direction when the inlet is horizontal (side facing), but not when the inlet is vertical (facing up). The side inlet may accept drainage flow from any fixture except a toilet. Side and heel inlets are usually 11/2- or 2-inch openings, and you may not connect a toilet to any opening less than (<) 3 inches.

4. You may connect a dry vent to the quarter bend side or heel inlet only when the inlet is vertical (facing up). You may connect a dry vent to a quarter bend side or heel inlet when the inlet is horizontal (side facing) only when the entire quarter bend fitting is used as part of a dry vent.

Allowed uses of 90° bends with an inlet

Sanitary tee allowed flow direction change

90° bend allowed direction change

Drain & Sewer Pipe Connections & Joints

ABS Plastic Pipe Joints

1. You may use approved branded couplings to join buried ABS pipes. Do not use branded couplings to join aboveground ABS pipes unless the use is approved by the building official.

2. You may use solvent cement to join ABS pipes above and below ground. Clean and dry pipes and fittings before applying solvent cement to all joint surfaces. Make the joint while the solvent cement is wet. Use solvent cement that complies with ASTM D 2235. Do not use PVC cement with ABS pipe.

3. You may use threaded joints for Schedule 80 and heavier ABS pipe. The threads should be NPT type. Do not place threads on the pipe’s interior.

You may use a product called transition cement to join ABS and PVC pipe if the product is approved by your local jurisdiction. This product is not currently approved by general codes for most applications but is frequently used.

Steel Pipe Joints

1. You may use threaded joints for galvanized steel pipes. The threads should be NPT type.

2. You may use approved branded couplings to join galvanized steel pipes. Install the branded couplings according to manufacturer’s instructions.

Use the correct solvent cement and primer, if required, for the type of pipe you’re using: PVC and CPVC should be connected with PVC solvent cement and primer; ABS requires ABS solvent cement (no primer is required).

PVC Plastic Pipe Joints

1. You may use approved branded couplings to join buried PVC pipes. Do not use branded couplings to join aboveground PVC pipes unless the use is approved by the building official.

2. You may use solvent cement to join PVC pipes above and below ground. Clean and dry pipes and fittings before applying primer to all joint surfaces. Apply primer that complies with ASTM F 656 if required by your local jurisdiction. Apply solvent cement that complies with ASTM D 2564. Make the joint while the solvent cement is wet. Do not use ABS cement with PVC pipe.

  1. You may use threaded joints for Schedule 80 and heavier PVC pipe. The threads should be NPT type. Do not place threads on the pipe’s interior.
Joints between Different Types of Pipe

1. Use branded couplings approved for joining the different types of pipe. Install all branded couplings according to manufacturer’s instructions.

2. Use an approved brass ferrule with a caulked joint or a mechanical compression joint when joining copper tubing to cast-iron pipe.

3. Use a brass converter fitting or a dielectric fitting when joining copper tubing to galvanized steel pipe.

Drain & Sewer Pipe Slope

1. Install horizontal drainage and sewer pipe with a uniform slope and alignment.

2. Install pipe not more than 21/2 inches in diameter with at least a 1/4 unit in 12 units (2 percent) slope.

3. Install pipe at least 3 inches diameter with at least a 1/8 unit in 12 units (1 percent) slope.

Drain & Sewer Pipe Size Reduction

1. Do not reduce drainage and sewer pipe size in the direction of the waste flow. Example: do not drain a 2-inch trap into a 11/2-inch drainpipe.

NOTE: A 4-inch-by-3-inch closet bend fitting is not classified as a reduction in size.

Cast-iron drain pipe joints originally were made with hubbed fittings. Since new cast iron is seldom installed, joinery with cast iron is normally accomplished by connecting the original cast iron to another material, such as PVC, with a branded coupling.

Install and support DWV pipe to maintain the required uniform slope.

Drain & Sewer Cleanout Openings

Cleanout Locations & Spacing

1. Install a cleanout in every horizontal drainpipe so that the distance between cleanouts is not more than 100 feet, measured along the pipe’s developed length. Install at least one cleanout for every horizontal drainpipe regardless of drainpipe length. This provision applies to the building drain, building sewer, and horizontal branch drains, not to fixture drains.

2. Install a cleanout within 10 feet of the building drain and building sewer junction. You may install this cleanout inside or outside the building. Make this cleanout accessible. Measure the 10 feet along the developed length of the pipe from the cleanout fitting to the building drain and sewer junction.

3. Install a cleanout at every change of pipe direction more than 45 degrees when the direction change uses one fitting. When multiple direction changes occur in one pipe run, only one cleanout is required, spaced not more than 40 feet apart. This provision applies to the building drain, building sewer, and horizontal branch drains.

Cleanout Size

1. Install cleanouts that are the same size as the largest pipe served by the cleanout. Example: you may not use 11/2-inch fixture drain as a cleanout for a 2-inch branch drain.

2. You may install a cleanout in a vertical stack that is one pipe size smaller than the stack pipe size.

Cleanout Accessibility

1. Provide at least 18 inches between the cleanout and any obstruction. Measure the distance perpendicular to the front of the cleanout.

2. Do not conceal cleanouts with permanent finishing materials.

  1. Extend underground cleanouts to or above finished grade. Do not extend cleanouts above surfaces where they may become trip hazards or where they may be damaged by traffic.
Cleanout Plugs

1. Install brass or plastic plugs in cleanout fittings.

2. Make cleanouts gas and liquid tight.

Cleanout Direction

1. Install cleanouts so that they open toward the direction of the waste flow.

Cleanout Fixture Connections

1. Do not connect other pipes or fixtures to an existing cleanout unless you install an alternate cleanout. Example: do not remove a cleanout plug and use the cleanout opening as the drain for a laundry sink.

A cleanout is a threaded, removable cap positioned in a drainpipe run to allow access for equipment that clears clogs. Every horizontal line should have a cleanout that is no smaller in diameter than the largest drainpipe in the line.

Seal cleanout plugs before capping cleanout fittings.

For your convenience, keep access clear to cleanouts. Position movable objects, such as this washing machine, so they will not interfere with drain cleaning tools. Permanent obstructions must be kept at least 18” away from the cleanout, measured perpendicular to the opening.

Plumbing Vents

To understand the purpose of plumbing vents, you must first understand the purpose of plumbing traps. A trap is required for all fixture drains connected to the DWV pipes. A trap can be a separate fitting, such as a P-trap for a sink or a shower, or it can be part of the fixture, such as the trap in a toilet. A trap maintains a water seal that keeps noxious and potentially explosive sewer gas in the DWV pipes and away from the air in the home. Water flows into a fixture and through a trap when you use a fixture. When you stop using the fixture, some of the water remains in the trap and recharges the trap’s water seal.

When water flows in a pipe near a trap, the suction caused by the flowing water can create enough negative pressure at the trap to pull the water out of the trap. This is sometimes called siphoning the trap, because it is similar to what happens when you use a hose to siphon fuel out of a fuel tank. If the trap looses its water seal, the home is open to the flow of sewer gas.

A plumbing vent protects the trap’s water seal by allowing air into the DWV pipes. The air provided by the vent replaces the air that is drawn along with the flowing water. This replacement air reduces the suction and protects the trap. Without properly sized and installed vents, the DWV system will not function as intended.

Vent pipes should extend in an upward direction from drains. This ensures that wastewater cannot flow into the vent pipe and block it. At the opposite end, a vent pipe should connect to an existing vent stack or stack vent at a point at least 6” above the flood rim of the highest fixture draining into the system.

Support vent pipes so they slope toward drain pipes.

Vent Slope & Connection to Pipes

Plumbing Vents Required

1. Install an approved vent for every trap and trapped fixture. This means that every plumbing fixture (such as a sink or a shower) and every plumbing fixture with an integrated trap (such as a toilet) must be protected by an individual vent or an approved vent system in which one vent protects multiple fixtures.

2. Terminate at least one vent outdoors. Connect the outdoor vent to the building drain or to a branch or extension of the building drain. The branch or extension cannot be an island fixture vent.

Vent Pipe Slope & Support

1. Install all vent pipes using adequate supports so that the vent pipes slope toward the soil or waste pipe. Moisture in any form should flow toward the soil or waste pipe by gravity. General codes do not specify support intervals for vent pipes. Supporting vent pipes at the same interval required for drain pipes is recommended, but not required.

Vent Pipe Connection to Horizontal Drainage Pipes

1. Connect vent pipes to horizontal drainage pipes above the centerline of the horizontal drainage pipe. This protects the vent pipe from filling with solid material.

Vent Connection Height Minimums

1. Connect dry vent pipes to vent stacks, stack vents, and to stack-type air admittance valves so that the connection point is at least 6 inches above the flood rim level of the highest fixture served by the vent. A common violation of this provision is when a dry vent runs parallel to the drainage pipes under the fixture. This provision helps protect the vent pipe from filling with solid material.

2. Install horizontal branch vent pipes at least 6 inches above the flood rim level of the highest fixture served by the vent.

Connect vent pipes to other vents at least 6” above the highest fixture so that the vent pipe will not become clogged with solid materials.

VIOLATION! Do not connect the vent pipe within 2 pipe diameters of the trap weir.

Vent Rough-in for Future Fixtures

1. Install a vent for roughed-in (future) fixtures that is at least 1/2 the diameter of the drainpipe rough-in.

2. Connect the roughed-in vent to the vent system or provide another approved means to terminate the roughed-in vent.

3. Label the roughed-in vent pipe to indicate that it is a vent.

Crown Venting

1. Connect the vent fitting at least two pipe diameters from the trap weir.

Vent Termination

Vent Height Above Roof

1. Extend vent pipes above the roof at least 6 inches, or the number of inches required by local snow accumulation and temperature conditions, whichever is higher. Measure vent height from the high side where the vent exits the roof. Obtain the snow accumulation height from the local building official.

2. Extend vent pipes at least 7 feet above any roof used as a balcony, observation deck, or similar accessible walking surface.

Use approved vent flashing boots to seal around the vent projections in a roof. Make sure boot angle is compatible with your roof slope.

Vent Freezing & Frost Closure Protection

1. Protect exterior vent terminals from freezing by using heat, insulation, or both.

2. Increase the diameter of exterior vent terminal pipes to at least 3 inches, beginning at least 1 foot below the roof or inside the wall.

3. These provisions apply only where the 97.5 percent winter design temperature is less than 0 degrees Fahrenheit. Obtain this information from IRC Chapter 3 and from your local building official.

Vent Flashing

1. Use approved flashing to make vent pipes extending through a roof watertight.

2. Use caulk to make vent pipes extending through a wall watertight.

Vent Exterior Termination Locations

1. Locate plumbing vent terminations at least 4 feet below, at least 3 feet above, or at least 10 feet horizontally from any: (a) door or operable window, (b) other air intake opening of the building, and (c) air intake opening of any adjacent building.

2. Locate plumbing vent terminations running through a side wall at least 10 feet from the lot line and at least 10 feet above the highest grade within 10 feet horizontally from the vent termination.

3. Locate plumbing vent terminations at least 7 feet above a roof used for recreational purposes, such as an observation deck or sunbathing.

4. Protect side-wall vent terminations from entry by birds or rodents.

5. Do not locate vent terminations directly under the building’s overhang if the overhang contains soffit vents.

Vent Connection Distance from Trap

1. Use Table 33 to determine the maximum length of a fixture drain between a trap weir and a vent fitting. The vent fitting may be at a vent pipe, such as an individual vent, or at a vented pipe, such as a wet vent. Uniform Plumbing Code fixture drain lengths are different.

2. The table does not apply to self-siphoning fixtures, such as toilets. No fixture drain length limitations apply to these fixtures.

Fixture Drain Slope

1. Connect the fixture drain pipe with not more than one pipe diameter of fall between the bottom of the trap outlet and the bottom of the vent fitting inlet. This parallels the distance requirements in Table 33 and reduces the chance that the trap will drain because the fitting is below the trap. Example: 5 feet by 1/4 inch per foot equals 11/4 inches. See the first row of Table 33.

2. Connect the top of the fixture drainpipe to the vent fitting above the trap weir. This provision does not apply to toilet fixture drains.

The distance from the trap to the vent fitting is limited. Note that the vent fitting may connect to a vent pipe or to a pipe that is vented, such as a wet vented pipe.

Improper Vent Connection

When a vent is connected to a vent stack, the connection should be at least 6” above the fixture flood rim level. This helps avoid improper waste flow through the trap.

Proper Vent Connection

Examples of correct individual vent configurations.

Vent Pipe Size

1. Use at least a 11/4-inch-diameter vent pipe or a vent pipe at least 1/2 the diameter of the drainpipe being vented, whichever is larger, as the dry vent.

2. Increase the vent pipe diameter by at least one pipe size over the entire length of the vent pipe when the vent’s developed length is greater than 40 feet.

Vent Pipe Developed Length

1. Measure the developed length of individual, branch, and circuit vents beginning where the vent connects to the drainage system and ending where the vent connects to a vent stack, stack vent, air admittance valve, or the vent’s termination point outside the building.

Individual Vents

1. Fixture types: Use an individual vent to protect any fixture.

2. Number of fixtures: Use an individual vent to protect only one fixture.

3. Fixture location: Use an individual vent to protect one fixture located anywhere in the structure.

4. Individual vent connection location: Connect the individual vent on the fixture drain of the fixture being vented or at the fixture drain connection to the drainage system.

5. Fixture drain length to vent connection: Use Table 33 to determine the maximum distance between the fixture trap weir and the individual vent fitting.

6. Individual vent pipe size: Use at least a 11/4-inch pipe or a pipe at least 1/2 the size of the drainpipe being vented, whichever is larger.

Individual vents are the easiest to install. They protect one fixture.

Common Vents

1. Fixture types: Use a common vent to protect any two fixtures. You may common vent different types of fixtures, such as a sink and a shower or a shower and a toilet.

  1. Number of fixtures: Use a common vent to protect only two fixtures.

3. Fixture location: Use a common vent only for fixtures located on the same floor level. You may connect the fixture drains at different vertical levels if the fixtures are on the same floor level.

4. Common vent connection location: You may connect the common vent where the fixture drains intersect. You may connect the common vent downstream from where the fixture drains intersect only when the fixture drains connect to the branch drainpipe at the same horizontal level.

5. Fixture drain length to vent connection: Use Table 33 to determine the maximum distance between each fixture trap weir and the common vent fitting.

6. Common vent pipe size: Use at least 11/4 inches of pipe or a pipe at least 1/2 the size of the drainpipe being vented, whichever is larger, for the common vent.

Common vent with vent connecting at fixture drain intersection.

Wet Vents

1. Fixture types: Use a wet vent to protect any combination of fixtures from not more than two bathroom groups.

2. Number of fixtures: Use a wet vent to protect not more than two toilets, two bathtubs or showers, two lavatory sinks, or two bidets.

3. Fixture location: Use a wet vent only for approved bathroom fixtures located on the same floor level.

4. Wet vent connection location: (a) Begin the wet vent with an individual or common vent for a lavatory, bidet, shower, or bathtub. This vent does not need to be at the first wet vented fixture in a horizontal wet vent. This vent must be at the first wet vented fixture in a vertical wet vent. End the wet vent at the last wet vented fixture connection to the wet vented pipe. (b) Do not connect more than one fixture upstream from the beginning individual or common vent in a horizontal wet vent. (c) Connect each fixture individually to the wet vented pipe. Do not connect two or more fixtures together and connect that branch drain to the wet vented pipe.

5. Horizontal wet vent fixture drain connection location: (a) Connect each individual fixture drain horizontally to a horizontal wet-vented pipe. Example: you may not install a wye fitting vertically and connect a fixture drain to the vertical opening of the wye in a horizontal wet vent. You may install the wye horizontally and connect the horizontal fixture drain to the horizontal opening of the wye. (b) You may connect a fixture drain vertically to a horizontal wet-vented pipe if you install a dry vent on the vertically connected fixture. Example: you may install a wye fitting vertically if you connect an individual vent to the fixture. (c) Do not connect any fixtures to the horizontal wet-vented pipe other than those fixtures being wet-vented. You may connect other fixtures to the horizontal pipe downstream after the wet vent ends. Example: do not connect a bedroom bar sink to a wet-vented pipe.

  1. Vertical wet vent fixture drain connection location: (a) Connect all toilet fixture drains at the same vertical level. (b) Connect fixture drains from bathtubs, showers, lavatory sinks, and bidets at or above where the toilet fixture drains connect to the vertical wet vent.

7. Fixture drain length to wet-vented pipe: Use Table 33 (see here) to determine the maximum distance between each fixture trap weir and the fixture drain fitting at the wet-vented drain pipe. You may use individual and common vents to protect any fixture where the fixture drain length limit is a problem.

8. Wet vent pipe size: (a) Use a dry vent that is at least a 11/4-inch pipe or a pipe at least 1/2 the size of the wet-vented pipe, whichever is larger, for the individual or common vent that begins the wet vent. (b) Use Table 34 to size the horizontal and vertical wet-vented drainage pipe. You may not connect a toilet to a drainage pipe smaller than 3 inches regardless of what is allowed in the table.

Using a wet vent eliminates the need for an individual vent for each fixture.

Island Fixture Vent

1. Fixture types: Use an island fixture vent to protect only sinks such as those in kitchens and bathrooms. You may connect a dishwasher and disposal to a kitchen sink.

2. Use an island fixture vent to protect any number of approved fixture types.

3. Use an island fixture vent only for fixtures located in the same island and on the same floor level.

4. Pipe configuration: (a) Extend the loop portion of the island fixture vent vertically to above the drain outlet of the fixture being vented before extending the horizontal and/or vertical downward portion.(b) Use drainage fittings and pipe slopes for any portion of the vent below the fixture flood rim level. Do not use vent fittings or slope the vent pipe as a vent below the fixture flood rim level.(c) Connect the downward portion of the vent loop downstream from where the fixture drain connects with the horizontal drainage pipe. Make the connection using a full size fitting. (d) Provide cleanouts at the downward portion of the loop vent and in the vertical portion of the vent pipe before it connects to the exterior vent pipe.

5. Dry vent connection location: (a) Connect the dry vent to the drainage system using a full size fitting. Connect the dry vent to a vertical drain pipe or the top half of a horizontal drain pipe. (b) Extend any dry vent at least 6 inches above the flood rim level of the highest fixture being vented before any connection to the outside vent.

6. Fixture drain length to vent connection: Use Table 33 to determine the maximum distance between the fixture trap weir and the fixture drain connection to the island vent.

7. Vent pipe size: Use at least a 11/4 inches pipe or a pipe at least 1/2 the size of the drain pipe size being vented as the dry portion of the vent, whichever is larger.

Air Admittance Valves

1. Install air admittance valves according to manufacturer’s installation instructions and general code provisions.

2. You may use air admittance valves to vent individual vents, branch vents, circuit vents, and stack vents. Use individual and branch-type air admittance valves to vent fixtures that are on the same floor level and that are connected to a horizontal branch drain.

3. Use air admittance valves that are rated for the vent size to which the valve is connected.

4. Locate individual and branch-type air admittance valves at least 4 inches above the horizontal branch drain or fixture drain being vented.

5. Locate stack-type air admittance valves at least 6 inches above the flood rim level of the highest fixture being vented.

6. Locate the air admittance valve within the vent’s developed length limits.

7. Locate air admittance valves in attics at least 6 inches above insulation.

8. Provide air admittance valves with access and adequate ventilation.

9. Install air admittance valves within 15 degrees of vertical, and do not install air admittance valves outdoors unless allowed by the manufacturer’s instructions.

10. Do not use an air admittance valve as the vent for a sewage ejector tank unless the vent system for the tank is designed by a qualified engineer.

11. Look for the UPC symbol on the air admittance valve. Air admittance valves without this symbol are for use only in manufactured homes. They may not be used in homes governed by the IRC.

12. Do not install air admittance valves outside unless allowed by manufacturer’s instructions. Do not install them outside to evade vent clearance requirements to air intake openings.

An island fixture vent is a fairly complicated venting configuration used to vent fixtures installed in a kitchen island. To further complicate matters, many codes now require that the vent pipe from the fixture connect to the vent stack at least 6” above the fixture flood rim.

Air admittance valves can be installed in an island cabinet to vent a sink drain line, greatly simplifying the venting process.

Plumbing Traps

Trap Size

1. Use Table 35 to determine the minimum trap size for most plumbing fixtures.

2. Do not install separate traps on toilets, urinals, and other fixtures that have traps in the fixture itself.

3. Do not install a trap that is larger than the drainage pipe into which the trap discharges. Example: do not connect a 2-inch trap to a 11/2-inch pipe on the discharge side of the trap.

Measure the water seal from the trap dip to the crown weir.

VIOLATION! Install traps so that the water seal is level. Traps set out of level may lose their water seal and will not drain properly.

Trap Seal

1. Install traps with a water seal of at least 2 inches and not more than 4 inches.

2. Install floor drain traps that have a deep seal (near 4 inches) design or a trap primer. Connect trap primer valves above the trap seal level.

Trap Installation

1. Set traps level with respect to their water seal.

2. Protect traps from freezing.

3. Provide access to traps with slip joints at the trap inlet or outlet.

4. Do not install more than one trap per fixture.

5. Limit the vertical distance between the fixture drain outlet and the trap weir to not more than 24 inches.

6. Limit the horizontal distance between the fixture drain outlet and the center of the trap inlet to not more than 30 inches. Note that this 30-inch horizontal distance may be eliminated or not enforced in some jurisdictions. Verify if this provision applies in your jurisdiction.

Prohibited Traps

1. Do not install the following types of traps: bell traps, drum traps, S-traps, traps with moving parts, and building traps.

Plumbing Appliances & Fixtures

The installation and hookup of appliances that are part of your home plumbing system is the part of the plumbing process that DIYers are most likely to attempt. The information in this section provides a good general backdrop for making plumbing hookups, but be sure to read the manufacturer’s installation recommendations carefully. As always, manufacturer instructions take precedence over codes.

Water Heaters

Replacing a water heater is a relatively easy DIY plumbing task as long as it is a like-for-like replacement. In an ideal situation, you’d replace the old unit with one of the exact same size and make, and thereby avoid having to move any gas, water, or electrical lines. But if you choose to upgrade or downgrade in size, or perhaps replace an old electric water heater with a gas water heater that costs less to run, you’ll find that relocating the necessary lines isn’t that difficult. Be sure to check with your local building department to determine if a permit is required to replace a water heater. A permit probably is required unless you are replacing like-for-like.

Water heaters for primary duty in residences range in size from 30 gallons to 65 gallons. For a family of four, a 40- or 50-gallon model should be adequate. While you don’t want to run out of hot water every morning, you also don’t want to pay to heat more water than you use. Base your choice on how well your current water heater is meeting your demand.

Prohibited Locations for Water Heaters

1. Do not install fuel-fired water heaters in rooms used as storage closets. You may install water heaters in closets used solely to store the water heater if you provide adequate combustion air in the closet. You may install electric water heaters in any closet when allowed by the manufacturer.

2. Do not install fuel-fired water heaters in bedrooms or bathrooms unless the water heater is installed in a sealed enclosure where combustion air does not come from the living space. This restriction does not apply to direct vent water heaters.

3. You may provide access to water heaters located in attics or crawl spaces through bedrooms, bathrooms, or their closets if ventilation of the bedroom, bathroom, or closet complies with codes.

Water heaters typically last for at least 10 years, but once they start to show signs of aging, it’s a good idea to replace them with a new, more efficient appliance.

Water Heater Relief Valves

1. Install either a separate temperature relief valve and a separate pressure relief valve or a combination temperature and pressure relief valve on all appliances used to heat or store hot water. Combination temperature and pressure relief valves (T&P valves) are used almost exclusively in modern water heaters. This provision applies to tank-type, tankless, and swimming pool water heaters.

2. Install the temperature relief or T&P valve on the top of the water heater or on the side of the water heater within 6 inches of the top. Do not install an extension pipe between the water heater and the T&P valve.

3. Do not install a check valve or shutoff valve anywhere that might interfere with the operation of the relief valve or the flow of water or steam from the discharge pipe.

The T&P valve is a critical safety device that is required on all water heaters.

T&P valves should be installed on your water heater prior to placing the appliance in position. Many water heaters today come with the T&P valve preinstalled.

Water Heater Relief Valve Discharge Pipe

1. Use water distribution pipe listed in Table 28 (see here) as the relief valve discharge pipe. Copper and CPVC are the most commonly used discharge pipes. It is difficult to maintain uniform slope and fall on flexible pipes, such as PEX.

2. Install the discharge pipe so hot water and steam will not cause personal injury or property damage if the relief valve discharges.

3. Install the discharge pipe so that any leaking from the pipe outlet is readily observable by the building occupants.

4. Use a discharge pipe that is at least as large as the relief valve opening. The size is usually 3/4 inch in diameter. Use 1-inch-diameter pipe or tubing if insert fittings are installed in the discharge pipe. PEX tubing is the most common example of this situation.

5. Run the discharge pipe full size to the floor, to an indirect waste receptor (such as a floor drain) inside the building, to the water heater drip pan, or outside the building. If the area is subject to freezing, terminate the discharge pipe through an air gap into an indirect waste receptor located inside the building. You may use other discharge points in areas subject to freezing, if approved by the local building official.

6. Slope the discharge pipe so that it drains by gravity from the relief valve to the discharge point.

7. Do not connect the discharge pipe directly to the building’s drain, waste, and vent system. Leave an air gap between the discharge pipe and the floor, ground, or other termination point.

8. Do not install a trap or a valve or a threaded outlet in the discharge pipe.

9. Terminate the discharge pipe through an air gap not more than 6 inches and not less than 11/2 inches above the floor.

10. Do not connect more than one appliance to a discharge pipe.

Install a drip pan under a water heater when water leaks might damage surrounding areas. Use at least a 3/4”-diameter discharge pipe to drain the drip pan. Use a larger discharge pipe if the connection to the drip pan is more than 3/4” diameter.

Water Heater Drip Pans

1. Install a drip pan under storage tank water heaters located where leakage could cause damage. These locations often include attics and all areas within the conditioned area of the home, including finished basements. Drip pans are not required under tankless water heaters, unless required by local codes.

2. Use a drip pan at least 11/2 inches deep and made with at least 24-gauge galvanized steel or other approved materials. Use a pan with a size and shape to catch all leaks and condensation from the water heater. Do not install a plastic pan under a gas-fired water heater unless the pan is listed for installation under a gas-fired water heater.

3. Run the discharge pipe to an indirect waste receptor (such as a floor drain) or to the outside of the building. Terminate the pipe not more than 24 inches or not less than 6 inches above the ground or a waste receptor, such as a floor drain.

4. You are not required to install a pan under a replacement water heater if no pan is currently installed.

The vent for a gas water heater should be connected securely to the draft hood at the top of the appliance.

Do not connect PEX supply tubing directly to a water heater. Install metal connector tubes to the inlet ports first, and then attach the PEX to the tubes.

Toilets

You can replace a poorly functioning or inefficient toilet with a high-efficiency, high-quality new toilet in just a single afternoon. All toilets made since 1994 have been required to use 1.6 gallons or less per flush, which has been a huge challenge for the industry. Today, the most evolved 1.6-gallon toilets have wide passages behind the bowl and wide (3-inch) flush valve openings—features that facilitate short, powerful flushes. This means fewer second flushes and fewer clogged toilets. These problems were common complaints of the first generation of 1.6-gallon toilets and continue to beleaguer inferior models today. See what toilets are available at your local home center in your price range, then go online and see what other consumers’ experiences with those models have been. New toilets often go through a “debugging” stage when problems with leaks and malfunctioning parts are more common. Your criteria should include ease of installation, good flush performance, and reliability. With a little research, you should be able to purchase and install a high-functioning, economical gravity-flush toilet that will serve you well for years to come.

Most toilet tanks today are equipped with a float cup style fill valve rather than the float ball types that were common previously. Some have power-assisted flush mechanisms to boost today’s low-flow toilets.

General Requirements

1. Install toilets with an approved flushing mechanism that provides enough water to clear and refill the toilet bowl and refill the toilet’s internal trap. Approved flushing mechanisms are the common gravity feed flush tanks (one- and two-piece tanks) and power-assisted tanks or valves.

2. Install toilets that use an average of not more than 1.6 gallons per flush.

3. Provide the toilet with an adequate supply of water. Control the water supply with an automatic device (such as a float valve) that will refill the toilet tank after each flush and completely stop the flow of water to the tank when the tank is full. The device should also supply enough water to refill the toilet.

4. Install toilets with a flush valve seat in the toilet tank that is at least 1 inch above the flood level of the toilet bowl. An alternate design (used by low-profile one-piece toilets) is acceptable. This design closes the flush valve when the toilet is clogged and prevents water from flowing back into the tank.

5. Provide toilet tanks with an overflow pipe or mechanism that is sufficient to prevent the tank from flooding if the fill valve malfunctions.

6. Provide access to all parts in the toilet tank for repair and replacement. Do not install permanent counter tops or similar obstructions that restrict access to the tank.

7. Use toilet seats made of smooth, non-absorbent material properly sized for the toilet bowl.

8. Use corrosion-resistant screws, nuts, bolts, and washers to secure toilets to the closet flange.

Backflow Protection of Toilet Fill Valves

1. Protect toilets with an approved antisiphon fill valve.

2. Locate the backflow preventer at least 1 inch above the opening of the overflow pipe. Fill valves with all parts below the tank water line usually violate this provision.

Toilet (Closet) Flange

1. Install a closet flange that is firmly attached to a structural support (floor) to connect a toilet to drainage piping. Use a closet flange that is compatible with the connected drainage pipe. Example: do not use a PVC closet flange with ABS pipe. Do not use the closet flange to provide structural support to the toilet.

2. Use non-corrosive bolts and an approved gasket (O-ring) or other approved setting compound to secure the toilet and closet flange and to make the seal watertight.

An overflow tube must be provided inside the toilet tank to keep water from rising out of the tank if the fill valve is malfunctioning.

The water inlet of a fill valve should usually be above the tank’s water line to reduce backflow of wastewater into the drinking water system.

The closet flange and O-ring seal the plumbing connection. The closet flange does not support the toilet.

Dishwashing Machines

General Requirements

1. You may discharge a dishwashing machine, a disposal, and a kitchen sink into one 11/2-inch-diameter drain (trap). Use a 3/4-inch-diameter dishwashing machine drain tube when discharging the dishwashing machine into either a sink drain (trap) or a disposal. Connect the dishwashing machine drain tube to a wye fitting in the sink tailpiece when connecting the drain line directly to the sink tailpiece. Loop the dishwashing machine drain line as high as possible in the sink cabinet and securely fasten or install an air gap device. An air gap device is not necessary in the dishwashing machine drain tube unless required by local codes.

Use a wye tailpiece fitting when connecting a dishwashing machine drain tube directly to a sink.

A dishwashing machine drain tube high loop is one method of backflow prevention. Secure the tube as high as possible in the sink base cabinet.

A dishwashing machine drain air gap device is one method of backflow prevention. Install the device according to manufacturer’s instructions. These are required in some jurisdictions instead of a high loop.

Food Disposers

Fittings

1. Use an approved directional fitting on the tailpiece when connecting a disposal or dishwashing machine. This helps direct the waste down into the plumbing drain system and avoids blockage and blow back up the tailpiece when these appliances discharge under pressure. Examples of directional fittings include the waste tee with a baffle and a sanitary tee.

A sanitary tee fitting is one possible directional fitting when draining a dishwashing machine or food disposer into a kitchen sink.

Clothes Washing Machines

Fittings

1. Discharge the wastewater from a clothes washing machine through an air gap. Do not connect the clothes washing machine drain line directly to the plumbing waste pipes. Inserting the clothes washing machine drain hose into the standpipe is the most common acceptable method of providing the required air gap.

2. Install a water-hammer arrestor where required to control water flow and reduce the possibility of water hammer. A water-hammer arrestor may be used near a quick-closing valve, such as in a clothes washing machine.

A waste tee with a baffle is one possible directional fitting when draining a dishwashing machine or food disposer into a kitchen sink.

Water-hammer arrestors may be required in some jurisdictions at clothes washing machine hose connections.

Whirlpool Bathtubs (Jetted Baths)

General Requirements

1. Install whirlpool tubs according to manufacturer’s instructions. This includes testing the tub for leaks and pump operation, usually prior to installation, and providing adequate support for the tub, water, and occupants. Some whirlpool tub manufacturers allow plaster as a tub support method. Plaster is not the same as drywall joint compound. Do not use drywall joint compound to support bathtubs unless it is specifically approved by the tub manufacturer.

2. Provide a door or access panel large enough to allow service personnel to repair and replace the pump. The door size will depend on where the pump is located relative to the door. The door may have to be larger than the specified minimum size if the pump is located far away from the door.

3. Make the access opening at least 12 inches by 12 inches if the manufacturer does not specify an opening size. Make the access opening at least 18 inches by 18 inches if the pump is located more than 2 feet away from the opening. Do not place obstructions, such as tub support framing and pipes, between the access opening and the pump.

4. Locate the circulation pump above the crown weir of the trap.

5. Install circulation pipes and pump drain line so that they are self-draining and retain minimum possible water after using the tub.

6. Install whirlpool bathtub motors on a GFCI protected circuit. Do not use the bathroom receptacle circuit for this purpose.

7. Install a copper bonding wire at least #8 AWG connecting all metal pipes, pump motors, and other electrical equipment associated with the whirlpool bathtub. Do not bond grounded double insulated whirlpool bathtub pump motors.

Whirlpool tub motors need access for maintenance and replacement. The access opening must be large enough to allow effective access to the motor. Connect a bonding wire between the tub motor and metal water pipes for electrical safety.

A bathtub can crack and drain connections can loosen and leak unless it is properly supported. Here, the tub is installed on a bed of hardened mortar.

Showers

Shower Size

1. Provide showers with a finished area of at least 900 square inches and a finished minimum dimension of at least 30 inches. Maintain the minimum dimensions from the top of the threshold to at least 70 inches above the shower drain outlet. Measure the shower from the centerline of the threshold (curb). You may install valves, showerheads, soap dishes, and grab bars that encroach into the minimum dimensions. You may install a fold-down seat in the shower if the minimum dimensions are maintained when the seat is up.

2. You may provide a shower with a finished minimum dimension of at least 25 inches if the finished area is at least 1,300 square inches.

3. Provide shower compartment access of at least 22-inch finished width.

4. Swing hinged shower doors out from the shower stall. Hinged doors may swing into the shower stall if they also swing out. Sliding shower doors are also allowed.

Water Supply Riser

1. Secure the pipe between the shower valve and the showerhead to the permanent structure. This provision applies whether the riser is visible or concealed. Securing the riser helps avoid leaks if the riser twists and becomes loose at joints.

Shower Receptor Construction

1. You are not required to install a raised curb or threshold at the entrance to a shower. Showers designed for wheelchair access will not have a curb or threshold.

2. Install a shower curb or threshold (when used): (a) at least 1 inch below the sides and back of the receptor; and (b) at least 2 inches and not more than 9 inches above the top of the drain.

3. Slope the shower floor at least 1/4 unit in 12 units (2-percent slope) and not more than 1/2 unit in 12 units.

4. Use a flanged shower floor drain that provides a watertight seal at the floor.

5. Use hot-mopped felt, sheet lead, sheet copper, approved plastic liner material, or approved trowel-applied liquid material when installing a site-built shower receptor. Plastic liners (such as chlorinated polyethylene and plasticized polyvinyl chloride) are the most common modern site-built liner materials.

6. Extend the lining material at least 2 inches beyond or around the rough jambs of the shower receptor. Extend the lining material at least 2 inches above the finished threshold or curb.

7. Attach the lining material to an approved backing. Nail or perforate the lining at least 1 inch above the finished threshold. Seal joints in plastic lining material according to manufacturer’s instructions.

8. Install an approved flanged shower drain that is equipped with weep holes into the drain and is equipped with a flange that makes a watertight seal between the lining material and the drain.

A sufficiently large shower stall is more than a convenience—it is a safety issue.

Attaching the shower riser pipe to framing helps avoid water leaks caused when adjusting the showerhead loosens the pipe fittings.

Proper installation of a site-built shower receptor is critical to avoiding costly water leaks.

Irrigation Systems

1. Protect lawn irrigation system water connections by installing an atmospheric vacuum breaker, a pressure vacuum breaker, or a reduced pressure backflow preventer.

2. Do not install a valve downstream from an atmospheric vacuum breaker.

3. Install a reduced pressure backflow preventer if chemicals are introduced into the irrigation system.

VIOLATION! Pressure vacuum breakers are a common way to protect lawn irrigation systems. This manifold is missing a backflow preventer (inset photo) and is a code violation.

PVC supply tubing is a good choice for bringing water to a home irrigation system: 3/4” inside diameter schedule 40 is shown here.

Sprinkler heads in many irrigation systems are tied into the water supply with thin riser flex pipes. The union is typically made with a barbed fitting.

Electrical System

Home wiring is a very popular do-it-yourself subject that is fundamentally hazardous. When it comes to electricity, mistakes and accidents do pose threats, including fire, injury, and death. Therefore, safety is the primary focus of the electrical code provisions.

In this chapter you will find many of the rules governing safe installation of electrical wires, electrical equipment—including conduit, electrical receptacles, switches, lights, and other fixtures. Use this information to inspect your wiring and make sure it all conforms to code. If it does not, or if you are unsure about it, have a professional electrician upgrade your electrical system.

In this chapter:

Understanding Electrical Circuits

Electrical Grounding & Bonding

Electrical Branch Circuit Requirements

Electrical Receptacle Installation

Ground-Fault (GFCI) & Arc-Fault (AFCI) Protection

Junction Boxes, Device Boxes & Enclosures

Switch Installation

Light Fixture Installation

Satellite Dishes, Television & Radio Antennas

Broadband Cable Wiring

Typical Home Wiring System

Understanding Electrical Circuits

An electrical circuit is a continuous loop. Household circuits carry current from the main service panel, throughout the house, and back to the main service panel. Several switches, receptacles, light fixtures, or appliances may be connected to a single circuit.

Current enters a circuit loop on hot wires and returns along neutral wires. These wires are color coded for easy identification. Hot wires are black or red, and neutral wires are white or light gray. For safety, most circuits include a bare copper or green insulated grounding wire. The grounding wire conducts current when wires or equipment are malfunctioning and helps reduce the chance of severe electrical shock. The service panel also has a bonding wire connected to any metal water pipes.

If a circuit carries too much current, it can overload. A fuse or a circuit breaker protects each circuit in case of overloads.

Current returns to the service panel along a neutral circuit wire. Current then leaves the house on a large neutral service wire that returns it to the utility pole transformer.

General Requirements

Minimum Service Current Capacity Requirements

1. Provide at least 100-amp service to a single family home.

2. Provide at least 60-amp service to an accessory structure. Exceptions to the 60-amp minimum service exist for one- and two-circuit 120-volt service to accessory structures.

3. You may use the following wire sizes as a feeder when the load at the accessory structure is limited to one or two 15- or 20-amp, 120-volt branch circuits: (a) use at least #10 AWG copper or #8 AWG aluminum wire if the accessory structure has not more than two 15 or 20 amp, 120 volt branch circuits; (b) use at least #14 AWG copper or #12 AWG aluminum if the accessory structure has only one 15 amp, 120 volt branch circuit and use at least the same size feeder wire as used for the branch circuit.

4. Provide an equipment grounding wire with the feeder wires, and refer to the grounding requirements section if there are at two or more branch circuits in the accessory structure.

Closure of Unused Openings

1. Close all openings in boxes, conduit bodies, and cabinets with material that provides protection equal to the original opening cover. This means using plastic or metal knockout covers. Tape and cardboard do not provide equal protection.

2. Recess metal knockout covers in non-metallic boxes and conduit bodies at least 1/4 inch from the surface of the box or conduit body.

3. Cover open outlet boxes with a blank cover, a blank plate, or fixture canopy. Switch plates and receptacle plates do not provide complete closure for electrical boxes.

4. Ground metal covers and plates.

Identification of Circuits in Electrical Panels

1. Provide a legible and permanent marking or label that identifies the purpose of circuit breakers, fuses, and other equipment used to disconnect power from a circuit. Identify the circuit in enough detail that it can be distinguished from all other circuits. Example: do not identify a circuit as general lighting. Identify the specific rooms or outlets served by the circuit. A marking or label is not required if the purpose of the disconnecting equipment is self-evident. Use marking or labeling materials that will withstand the environment where the disconnecting equipment is located.

2. Locate the circuit identification on the face of the panelboard enclosure or on the inside panelboard door.

Cover open conduit knockouts in electrical boxes with an approved plastic or metal cap (inset).

Label each circuit in all electrical panels so that the purpose of each circuit is clear.

Prohibited Locations for Electrical Panels

1. Do not locate electrical panels and circuit breakers and fuses in clothes closets, bathrooms, over stairway steps, or in spaces designated for storage.

Working Clearances around Electrical Panels

1. Inspect your electrical enclosures (cabinets) to make sure they conform to code. If not, hire a professional electrician to relocate it. The following rules apply to electrical enclosures (cabinets) that require access while interior parts are energized. Examples of these enclosures include electrical panels and subpanels, and air conditioner and furnace service-disconnect boxes.

2. Provide a clear working space around electrical enclosures that is at least 36 inches deep, at least 30 inches wide (or as wide as the enclosure if it is wider than 30 inches), and at least 78 inches high (or as high as the enclosure if it is higher than 78 inches). Measure the clear working space from any exposed energized parts or from the cover in front of covered energized parts.

3. The enclosure should have enough clearance that the enclosure door can be opened at least 90 degrees.

4. Do not locate equipment, pipes, and ducts that are not associated with the electrical system directly above or below an indoor enclosure from the floor to the ceiling or 6 feet above the enclosure, whichever is less.

5. Do not locate anything not associated with the electrical system directly above or below an outdoor enclosure from grade to 6 feet above the enclosure. Examples include hose bibbs, exhaust duct terminations, and appliance vents.

6. Provide access to the clear working space around the enclosure (cabinet). Do not block access with shelves, workbenches, or other difficult to move objects.

7. Install electrical panels and circuit breakers and fuses so that the circuit breaker handle or fuse is not more than 79 inches above the floor or ground when the center of the handle is in its highest position.

8. You may install electrical panels rated not more than 200 amps in existing buildings where the working space height is less than 78 inches. This does not apply to new construction.

Your equpment should include a safe space above, in front of, and below all electrical panels and similar electrical equipment. If your panel does not meet these standards, have it relocated by a professional.

Use wire connectors rated for the wires you are connecting. Wire connectors are color-coded by size, but the coding scheme varies by manufacturer. The wire connectors shown above come from one major manufacturer. To ensure safe connections, each connector is rated for both minimum and maximum wire capacity. These connectors can be used to connect both conducting wires and grounding wires. Green wire connectors are used only for grounding wires.

Splicing Wires

1. Splice (join) wires using only listed devices, such as appropriate-sized wire connectors. Use the wire connector according to manufacturer’s recommendations regarding the minimum and maximum number and size of wires that the connector can accommodate.

2. Cover spliced wires with material equal to the original insulation. This does not include electrical tape or similar materials.

3. For splice wires that will be buried in the ground, use only devices listed for direct burial and install them according to manufacturer’s instructions.

4. Provide access to spliced wires unless the splice and splicing device are specifically allowed to be concealed. Access is usually provided by an accessible, covered junction box.

5. Do not place wire splices in a raceway unless the raceway has a removable cover.

Twist wire connectors over the ends of individual conductors that have been stripped of insulation. Pre-twist wires together with pliers or linesmans’ pliers (optional). Do not leave bare wire exposed beneath the bottom of the connector.

Push-in connectors are a relatively new product for joining wires. Instead of twisting the bare wire ends together, you strip off about 3/4” of insulation and insert them into a hole in the connector. The connectors come with two to four holes sized for various gauge wires. These connectors are perfect for inexperienced DIYers, because they do not pull apart like a sloppy twisted connection can.

Splicing Aluminum & Copper Wires

1. Splice (join) aluminum and copper wires together using devices listed for splicing aluminum and copper wires. Look for a mark or label, such as AL/CU, on the device or on the package for assurance that the device is listed for splicing aluminum and copper wires. Some wire nuts sold for residential use are not listed for splicing aluminum and copper wires.

2. Use only inhibitors and antioxidant compounds that are approved for splicing aluminum and copper wires. These materials should not degrade or damage the wires, wire insulation, or equipment. Read and follow manufacturer’s instructions.

Length of Wires Extending from Boxes

1. Extend wires at least 3 inches beyond the opening of any electrical box, junction, or switch point if the opening is less than 8 inches in any direction. This applies to most switch, receptacle, and light fixture mounting boxes used in residential electrical systems.

2. Extend wires at least 6 inches beyond where the wires emerge from the raceway or cable sheathing. Example: NM cable enters a single residential switch box with 1 inch of intact sheathing (outer cover). Begin the 6 inches measurement where the sheathing ends. The cable should extend at least 7 inches from the rear of the box. The NM cable should also extend at least 3 inches beyond the outside edge of the box.

Connecting Wires to Terminals

1. Remove insulation from wires and connect wires to terminals without damaging the wire. Do not connect damaged wires to terminals. Example: if you nick, damage, or cut strands from a stranded wire, cut the wire back to where it is full size and use the full, undamaged wire.

2. Connect more than one wire to a terminal only if the terminal is identified to accept multiple wires. Example: general codes require one wire per terminal for the grounded (neutral) wires and allow two or more same-gauge wires per terminal for the equipment grounding wires. Example: many circuit breakers allow only one hot (ungrounded) wire per circuit breaker terminal.

3. Connect aluminum wires to terminals only if the terminal is identified to accept aluminum wires.

Extend wires past the box opening at least 3”.

VIOLATION! Do not connect multiple neutral or hot wires to a terminal (the neutral bus bar seen here has two neutral conductors connected to single terminal).

VIOLATION! Never connect multiple hot wires to the same terminal on circuit breakers or other electrical devices unless specifically allowed by the manufacturer.

Wire Color Codes

1. Use wires with white or gray insulation or wires with three white stripes on other than green insulation as neutral (grounded) wires.

2. Use wires with green insulation, or wires with green insulation and at least one yellow stripe as equipment grounding wires. You may use uninsulated (bare) wires as equipment grounding wires in most circuits.

3. You may use any color other than white, gray, or green as hot (ungrounded) wires. The common colors are red and black.

4. You may use a wire with white or gray insulation as a hot (ungrounded) wire if the wire is part of a cable (such as NM) and if you permanently mark it as a hot (ungrounded) conductor at all places where the wire is visible and accessible. This marking is usually done by wrapping the end of the wire with black or red electrical tape. The marking must encircle the insulation.

Neutral & Equipment Grounding Wire Continuity

1. Connect neutral (grounded) wires together in device boxes if the neutral wire is part of a multiwire branch circuit. Do not rely on any device, such as a receptacle or light fixture, to provide the connection for the neutral wire in a multiwire branch circuit.

2. Connect equipment grounding wires together in all device boxes. Do not rely on any device, such as a receptacle or light fixture, to provide the connection for the equipment grounding wire in any circuit.

3. Install a wire (called a pigtail) between the connected wires and any device in the box.

Use a pigtail when you need to connect multiple wires together and use one wire to connect to a terminal.

Shut off power at the main electrical service panel before beginning any work. In some cases you may shut off individual circuits, but the safer precaution is always to throw the main breaker.

Service & Main Service Panel

Disconnecting Electrical Service

1. Provide equipment to disconnect all electrical service to a building using not more than six sets of switches or six sets of circuit breakers. The disconnecting equipment may be in one cabinet or in a group of cabinets in the same general location.

2. Label the service disconnecting equipment as such. The label must be permanent and clearly marked.

3. Use only service disconnecting equipment listed and labeled for that purpose. The electric meter and meter enclosure are not service equipment. Do not rely on removing the electric meter to disconnect electrical service.

4. The service disconnecting equipment should be installed in a readily accessible place where every building occupant has access.

5. The service disconnecting equipment may be located outside the building or inside the building as close as possible to where the service entrance conductors enter the building. Check with the local building official for information concerning your area. Fifteen feet is one typical maximum, but the distance may be less in some jurisdictions.

6. Service disconnecting equipment should not be located in bathrooms.

7. Service disconnecting switches or circuit breakers should not be installed more than 79 inches above the floor or ground.

A service disconnecting switch may be required when the main service panel is located too far from the point where the service entrance conductors enter the house.

Inspect your service clearance to make sure individual service wires are not within 3’ of doors, operable windows, and decks.

Overhead Service Drop Wire Clearances

1. Provide at least 3 feet of clearance between service drop and service entrance wires and porches, decks, stairs, ladders, fire escapes, balconies, sides of doors, and sides and bottoms of operable windows (not the tops of operable windows even if the top sash is operable). Clearance is required only to service drops and service entrance wires that consist of individual wires that are not protected by a raceway or outer jacket. This means that clearances are usually required for utility service drop wires and are not required for SE type service entrance cable and for wires or cables installed in conduit or tubing.

2. Provide at least 8 feet of vertical clearance between service drop wires and a roof not designed for regular pedestrian traffic, with a slope less than 4 inches in 12 inches. Access to such a roof would usually be by a ladder, through a window, or through a maintenance hatch.

3. You may reduce the 8-foot vertical clearance to at least 3 feet of vertical clearance if: (a) the voltage between wires is not more than (≤) 300 volts and (b) the roof is guarded or isolated; or if (c) the roof slope is at least 4 inches in 12 inches. Many residential service drops comply with this exception.

4. Provide at least 10 feet of vertical clearance between service drop wires and a roof designed for regular pedestrian traffic. Access to such a roof would usually be by stairs or by a door, and the roof edges would be protected by a guard.

5. Provide at least 18 inches of vertical clearance between service drop wires and a roof if: (a) the wires pass only over the overhang portion of the roof, and (b) not more than 6 feet of wire pass over not more than 4 lineal feet of roof surface measured horizontally, and (c) the wires enter a through-the-roof mast or terminate at an approved support.

6. Maintain all required clearances above the roof for at least 3 feet in all directions from the roof’s edge.

Service Drop Clearance Aboveground

1. Measure the vertical clearance between service drop wires and the ground, walkway, driveway, or street beginning at the lowest point of the service drop wires and ending at the surface under the wire’s lowest point. The lowest point of the service drop wires is often at the drip loop, but it could be at the point of attachment to the house or it could be where the wires enter the house.

2. Provide at least 10 feet of vertical clearance between service drop wires and areas or sidewalks accessed by pedestrians only.

3. Provide at least 12 feet of vertical clearance between service drop wires and residential property and driveways.

4. Provide at least 18 feet of vertical clearance between service drop wires and public streets, alleys, roads, or parking areas subject to truck traffic.

The service drop must occur at least 10’ above ground level, and as much as 18’ in some cases. Occasionally, this means that you must run the conduit for the service mast up through the eave of your roof and seal the roof penetration with a boot.

Safe clearance between service drop wires and the ground.

Electrical Grounding & Bonding

One of the important purposes of grounding and bonding can be summarized in this simple rule: Electricity wants to return to its source and will take all available paths to get there. When the electrical system is working as intended, electricity enters through the hot (ungrounded) wire, does its work, and returns to its source (usually the utility’s transformer) through the neutral (grounded) wire.

When electricity finds its way out of the intended path, things get dangerous. Example: a rat sits on copper water pipe and chews through the insulation on electrical cable exposing the hot (ungrounded) wire. After electrocuting the unfortunate rat, the exposed wire lands on the water pipe. If the water pipe is connected without electrical interruption to the electricity’s source (through bonding), the electricity thinks that the water pipe is the neutral (grounded) wire and happily starts flowing through the water pipe. This is a ground fault. The electric current should quickly rise to the point where it trips a circuit breaker or blows a fuse, clearing the fault.

But what if the water pipe is not bonded? Perhaps a water softener has been added to the system, interrupting the electrical continuity of some or all of the water pipe. In our example, the water pipe is still energized, but there is no way for the electricity to return to its source; that is, until someone grabs a metal water faucet handle and is standing on the ground or on some conducting surface. At that time, the electricity finds its path to its source through the person. The person is injured or killed.

When trying to understand grounding and bonding, think like electricity. If metal can become energized, however unlikely that is, you must assume that it will become energized. Bonding metal together and connecting the metal to ground in an approved manner lets you, not the electricity, decide how electricity will flow in a fault condition.

Normal current flow: Current enters the electrical box along a black hot wire, then returns to the service panel along a white neutral wire.

Ground fault: Current is detoured by a loose wire in contact with the metal box. The grounding wire picks it up and channels it safely back to the main service panel where the circuit breaker trips or the fuse blows.

Inspect Electrical Panels for Proper Grounding

Grounding & Bonding at Service Panels & Subpanels

1. The neutral (grounded) wire should be connected to the grounding electrode wire at the nearest accessible point at or before the service equipment (main disconnect). The service equipment is usually the most convenient accessible grounding point, because the meter enclosure and points before it are usually locked or secured and not accessible. The grounding electrode wire connects the neutral (grounded) wire to a grounding electrode.

2. The neutral (grounded) wire should not be connected to ground at any other place downstream from the service equipment grounding point. An exception to this rule exists when two buildings are supplied by one electric service.

3. All metal parts of the electrical system should be connected to the neutral (grounded) wire. This includes service equipment and panelboard cases, any metal electrical conduit or tubing, and all metal pipes in the building (such as metal water and gas pipe).

Metallic conduit must be physically and electrically connected to panel cabinets. A bonding bushing may be required, in some cases, where all of a knockout is not removed.

The neutral and grounding wires should not be connected to the same bus in most subpanels. The grounding bus should be bonded to the subpanel cabinet. The neutral bus should not be bonded to the subpanel cabinet.

Parts of a common electrical service configuration.

Service Grounding at Two Buildings Using Four-Wire Feeder

1. Use this procedure when installing a new feeder cable to a second building from the building with the primary electric service. (a) Install a feeder cable to the second building that contains an equipment grounding wire. Use a #10 copper equipment grounding wire for feeders above 20 amps to 60 amps or less. (b) Install a grounding electrode at both buildings. (c) Connect the feeder cable equipment grounding wire to the grounding electrode wire at the second building subpanel grounding bus. Connect all second building branch circuit equipment grounding wires to the grounding bus. (d) Bond the subpanel case to the grounding bus. (e) Connect the feeder cable neutral (grounded) wire to an isolated grounded bus at the second building subpanel. Do not connect the grounded bus to the subpanel case or to the grounding bus.

2. You are not required to use this procedure if there is only one branch circuit in the second building and if the new feeder cable for that one branch circuit contains an equipment grounding wire.

Wiring diagram for wiring a feeder from the main service panel to a subpanel in a separate building.

Grounding Electrodes & Electrode Wires

General Requirements

1. Every electrical service should be provided at least one approved type of grounding electrode. The most common grounding electrodes are underground metal water pipe, driven rod and pipe, and concrete encased.

2. All grounding electrodes that may be available at a building should be bonded together. General codes do not require that all possible types of grounding electrodes be installed. They require that if a grounding electrode is installed, it must be connected (bonded) to all other grounding electrodes and to the neutral (grounded) wire.

3. A bonding jumper at least as large as the grounding electrode wire should be used to connect (bond) the grounding electrodes. Bonding jumpers may be connected between grounding electrodes at any convenient point.

4. The grounding electrode wire may be connected at any convenient grounding electrode. Protect grounding electrode wires that are subject to physical damage with approved conduit or tubing, such as intermediate metallic conduit or PVC conduit.

5. Protect grounding electrode wires that are smaller than #6 AWG with approved conduit regardless of whether the wire is subject to physical damage.

6. Install a grounding electrode wire based on the size of the service entrance conductors. Most grounding electrode wires should be #6 or #8 copper.

  1. Metal gas pipe should never be used as a grounding electrode.
Underground Water Pipe Electrodes

1. Use metal underground water pipe that is in contact with the ground for at least 10 feet as a grounding electrode. This includes all metal water pipe materials, such as copper and steel, and all metal water pipes, such as water service pipes, metal well casing pipe, and metal irrigation system pipes.

2. You must consider all underground water pipe that satisfies the previous conditions as a grounding electrode and connect (bond) underground water pipe to all other grounding electrodes.

3. Do not connect a grounding electrode wire to any interior metal water pipe at a point that is more than 5 feet from where the underground water pipe enters the building. Do not use any interior metal water pipe that is more than 5 feet from where the water pipe enters the building as a conductor for a grounding electrode. Example: do not connect the grounding electrode wire at a water heater cold water pipe if the pipe is more than 5 feet from where the water pipe enters the building.

4. Do not use underground metal water pipe as the only grounding electrode. Install at least one other type of grounding electrode and connect (bond) it to the underground metal water pipe.

5. Install bonding jumper wires around devices that might interrupt electrical continuity. Such devices include water meters, water pressure reducers, water softeners, and water filtration systems.

Rod & Pipe Electrodes

1. You may use metal pipe or conduit that is at least 3/4 inch in diameter and at least 8 feet long as a grounding electrode. Use galvanized materials or other corrosion-resistant coating on iron and steel pipes.

2. You may use a stainless steel, zinc-coated or copper-coated steel, or copper rod that is at least 5/8-inch diameter and at least 8 feet long as a grounding electrode.

3. Do not use aluminum as rod and pipe electrodes.

4. Do not use one rod or pipe electrode as the only grounding electrode. Install at least one other grounding electrode of any approved type. Bond all grounding electrodes together. This provision does not apply if the rod or pipe electrode has a resistance to earth of not more than 25 ohms.

Concrete Encased Electrodes

1. You may use at least 1/2-inch-diameter reinforcing bar or at least #4 AWG bare copper wire as a concrete encased grounding electrode. The electrode material must be at least 20 feet long. Do not use reinforcing bar that is not electrically conductive or that is coated in non-conductive material.

2. Encase the reinforcing bar or wire in at least 2 inches of concrete. Place the bar or wire in either the horizontal or vertical part of the concrete that is in direct contact with the ground. Do not place a moisture barrier between the concrete and the ground.

3. You may use wire ties or similar means to connect (bond) reinforcing bars together to achieve the 20-foot minimum length.

4. Concrete encased electrodes are also called ufer grounding electrodes after the man who designed this grounding electrode system.

Grounding Electrode Wire Installation

Aluminum Grounding Electrode Wires

1. Do not use aluminum or copper-clad aluminum grounding electrode wires if the wire is in direct contact with masonry or the ground or if the wire is in a corrosive environment.

2. Do not install aluminum or copper-clad aluminum grounding electrode wires within 18 inches of the ground when the wire is installed outside.

Connecting Grounding Electrode Wires to the Electrode

1. Use one of the following methods to connect grounding electrode wires to grounding electrodes: (a) a pipe fitting, pipe plug, or other approved device screwed into a pipe or pipe fitting or (b) a listed bolted clamp made of cast bronze or brass or of plain or malleable iron.

2. You may use a listed metal strap ground clamp to connect indoor communications equipment grounding electrode wires to a grounding electrode.

3. Make accessible the connection point of grounding electrode wires and bonding jumpers to grounding electrodes. The connection point need not be accessible for buried or concrete encased grounding electrodes.

4. Clean grounding electrode wire connection points and all clamps and fittings of non-conductive materials, such as paint.

Connections around Equipment & Insulated Fittings

1. Install bonding jumpers around equipment such as water meters, pressure reducing valves, water softeners, water filtration equipment, dielectric fittings, and other equipment and fittings that interrupt the electrical continuity of metal piping.

2. Make bonding jumpers long enough to permit removal of the equipment and maintain electrical continuity.

3. Use bonding jumpers that are at least the same wire size as the grounding electrode wire.

Metal Water Pipe Bonding

1. Connect (bond) interior metal water pipes to the service equipment enclosure, the neutral (grounded) wire at the service equipment, the grounding electrode conductor, or to any grounding electrode.

2. Use a bonding jumper or wire that is at least the same wire size as the grounding electrode wire.

3. Make the bonding connection point accessible.

Metal Gas Pipe Bonding

1. Connect (bond) interior metal gas pipes and other metal pipes to the service equipment enclosure, the neutral (grounded) wire at the service equipment, the grounding electrode conductor, or to any grounding electrode.

2. You may use the equipment grounding wire that serves the gas appliance as the bonding wire. Number 10 AWG copper wire is the largest equipment grounding wire for almost all residential branch circuits. This means that: (a) a separate bonding wire between the gas pipe and the service equipment is usually not necessary (although some jurisdictions require one anyway), and (b) #10 AWG copper wire is usually the largest required gas pipe bonding wire.

3. Make the bonding connection point accessible.

Bonding Corrugated Stainless Steel Gas Tubing

1. Install a #6 AWG copper bonding wire that is connected to a listed clamp on gas supply systems using corrugated stainless steel gas tubing (CSST). Limit the length of the wire to not more than 75 feet. This bonding connection is for lightning protection.

2. Install the bonding connection at the first length of steel or copper pipe before the CSST. This is usually at the gas meter or where the propane pipe enters the home.

3. Some CSST is arc-resistant and does not need a separate bonding connection. This CSST usually has a black jacket. Verify CSST bonding requirements using manufacturer’s instructions and by contacting your building inspector.

Proper CSST bonding is very tricky to determine and has very high danger potential if incorrect. Have a qualified electrician determine if CSST in your house is properly bonded.

Electrical Branch Circuit Requirements

Every electrical circuit has its limits. Among the more basic tasks in evaluating your existing wiring system or planning a system expansion is to identify which loads will be drawing from which circuits so you can establish what each circuit capacity will need to be. In addition to letting you plan the circuits wisely, specific load knowledge lets you create a more balanced service panel, lessening the chances that you’ll trip breakers.

A duplex receptacle (A) contains two outlets. A single receptacle (B) contains one outlet.

Branch Circuit Load Limits

15-amp & 20-amp Circuits

1. Use only 15-amp and 20-amp, 120-volt circuits for multiple outlet branch circuits. A multiple outlet branch circuit has more than one light fixture and/or receptacle on the same circuit. One duplex receptacle counts as two receptacles. A circuit that serves one duplex receptacle is a multiple outlet branch circuit. This provision does not apply to a circuit that serves one single receptacle or one single light fixture.

2. Use only 120-volt branch circuits to supply residential light fixtures, receptacles for plug-and-cord connected loads not more than 1,440 watts, and motor loads less than .25 horsepower.

3. You may use either 120- or 240-volt branch circuits to supply one plug-and-cord connected or one permanently wired appliance rated more than 1,440 watts. This means that branch circuits rated more than 120 volts are effectively limited to serving a single receptacle or permanently wired fixed equipment.

4. Do not connect one or more fixed devices that in total exceed 50 percent of a multiple outlet branch circuit’s amperage rating. Fixed devices do not include light fixtures. This means that all fixed devices (such as a permanently wired disposal or hot water circulating pump) on a multiple outlet branch circuit may not exceed 7.5 amps (about 900 watts) on a 15-amp multiple outlet branch circuit and may not exceed 10 amps (about 1,200 watts) on a 20-amp multiple outlet branch circuit.

30-amp Circuits

1. Do not connect one plug-and-cord device that exceeds 80 percent of a 30-amp branch circuit’s amperage rating. This means that one device (such as a clothes dryer) may not exceed 24 amps (about 5,760 watts) on a 30-amp, 240-volt branch circuit.

2. Do not use a 30-amp branch circuit to serve loads other than a fixed device, such as a water heater, or a single plug-and-cord connected device, such as a welder.

Room Air Conditioner Circuits

1. Use wires that are rated at least 125 percent of a window or through-wall air conditioner’s total rated current load if: (a) the air conditioner is connected to a receptacle by a plug-and-cord, (b) the air conditioner’s total rated current load is shown on its nameplate (not just the individual motor load), (c) the air conditioner’s total rated current load on the nameplate is not more than 40 amps and 250 volts, and (d) the branch circuit overcurrent protection device does not exceed the branch circuit wire ampacity rating and the ampacity rating of the receptacle. Example: a plug-and-cord connected room air conditioner’s total rated current load is 17 amps. Use wires rated for 1.25 times 17 amps, which equals 21.25 amps (#10 copper wire).

2. Do not install a window or through-wall air conditioner on a 15- or a 20-amp multiple outlet branch circuit if the air conditioner’s total rated current load is more than 50 percent of the branch circuit’s rating (80 percent for dedicated circuits).

Kitchen Small Appliance Circuits

1. Provide at least two 20-amp, 120-volt branch circuits to serve only receptacles in the kitchen, pantry, breakfast and dining areas, and similar rooms. You may use the kitchen receptacle circuits to power a refrigerator, a wall clock, and the electrical requirements for gas cooking equipment. You may not use the kitchen branch circuits to supply light fixtures or other outlets in these rooms, and you may not use the kitchen branch circuits to supply outlets in other rooms or outside the house.

2. Provide a separate dedicated branch circuit for the kitchen range hood receptacle, if a range hood receptacle is installed. It is recommended, but not required, that this be a 20-amp, 120-volt branch circuit.

Air-conditioner load ratings can be found on the nameplate.

Bathroom Receptacle Circuit

1. Provide at least one 20-amp, 120-volt branch circuit to serve only receptacles located in the bathroom(s). You may not use the bathroom branch circuit to supply light fixtures or other outlets in the bathroom, and you may not use the bathroom branch circuit to supply outlets in other rooms.

2. You may provide each bathroom with its own dedicated 20-amp, 120-volt branch circuit. In this case, you may use the branch circuit to supply other bathroom outlets, such as light fixtures and exhaust fans.

Laundry Receptacle Circuit

1. Provide at least one 20-amp, 120-volt branch circuit to serve only receptacles located in the laundry area. You may not use the laundry branch circuit to supply light fixtures or other outlets in the laundry, and you may not use the laundry branch circuit to supply outlets in other rooms. Electric clothes dryers require a dedicated 240-volt, 30-amp circuit.

Garage Receptacle Circuit

1. Provide at least one 20-amp, 120-volt branch circuit to serve only receptacles located in the garage and readily accessible receptacles located outside the house. You may not use the garage receptacle branch circuit to supply light fixtures or other outlets in the garage, and you may not use the garage branch circuit to supply outlets in other areas inside or outside the house.

2. Provide at least one receptacle outlet for each vehicle storage bay in attached garages and in detached garages that are provided with power. General codes do not specify the type or rating of the receptacle.

Multiwire Branch Circuits

1. Run multiwire branch circuit wires from adjacent slots on the same panelboard. It is safer to originate a multiwire branch circuit from adjacent slots on the same side of the panelboard. This helps avoid overloading the shared neutral (grounded) wire.

2. Use a two-pole overcurrent device or two single pole devices that are connected by an approved handle tie to protect most multiwire branch circuits. Do not connect circuit breaker handles with nails, wires, or other unapproved handle tie substitutes.

3. Use wire ties or similar devices to group all ungrounded (hot) and grounded (neutral) wires of each multiwire branch circuit in the cabinet where the circuit originates.

The receptacle yoke is removed (A) when it is split-wired using a multiwire branch circuit.

Connect both handles of circuit breakers protecting a multiwire branch circuit with an approved handle tie.

Current Wiring Methods

Table 36 lists the wiring methods currently allowed in residential construction. Note that certain wiring methods may not be used in certain applications.

Approved Uses for Wiring Methods

1. Table 37 lists when a wiring method may be used in a specific application. Note that some wiring methods have restrictions or limitations shown by the following superscripts: (1) use less than 6 feet of LFC if the conduit walls are not reinforced, (2) insulate the neutral (grounded) wire unless the cable is used to supply other buildings on the same property, (3) insulate the neutral (grounded) wire, (4) use wires approved for wet locations and seal raceways to prevent water entry, (5) use materials listed as sunlight resistant, (6) protect metal raceways from corrosion, (7) use Schedule 80 RNC, (8) use materials listed as sunlight resistant if exposed to direct sunlight, (9) use less than 6 feet of conduit.

Rules for NM & UF Cable

1. Use Table 38 to determine the maximum ampacity and overcurrent protection of NM and UF cable. NM and UF cable is often referred to by the trade name Romex. This table applies to almost all branch circuit and feeder wiring in modern residential electrical systems. Example: the maximum rating for a circuit breaker protecting Number 12 copper wire is 20 amps.

Rigid metal conduit has threaded ends for making watertight connections with female-threaded fittings and couplings.

Electrical nonmetallic tubing (A) may be used inside, and outside if it is rated as sunlight resistant. Liquid-tight flexible conduit can be non-metallic (B) or it can be metallic conduit with a non-metallic sheath (C).

Non-metallic sheathed cable is available in the most common gauges used in residential construction.

NM & UF Cable Installation

1. Use NM and UF cable where the cable is not subject to physical damage. The term “subject to physical damage” is undefined and subject to interpretation. Your local building inspector will define what this means in your area. Locations that may be considered subject to physical damage include those within easy reach. Examples may include inside cabinets, in unfinished walls, and attached to finished walls below about 7 feet above the floor. Cable run in attics and crawlspaces is not usually considered subject to physical damage.

2. Protect NM and UF cable using RMC, IMC, EMT, or Schedule 80 RNC when the cable is subject to physical damage. Extend the protection at least 6 inches above the floor when the cable runs through the floor.

3. Protect NM and UF cable using nail guards or other approved physical protection when the cable is installed: (a) through holes, notches, or grooves that are closer than 11/4 inches to the edge of a stud or joist; (b) in notches and grooves in places such as drywall, plaster, and under carpet, unless the groove or notch is deeper than 11/4 inches; (c) through holes in metal framing (use grommets or bushings); and (d) parallel to the edge of a stud, joist, or furring strip when the cable is closer than 11/4 inches to the edge of the framing member.

4. Support NM, UF, AC, and MC cable every 41/2 feet. Use wire staples or other approved fasteners to support vertical runs of NM, UF, AC, and MC cable. Staple the cable only on the flat edge. Note that wiring methods need not always be secured to be considered supported. Cable run across the tops of joists and truss chords is usually considered supported without being secured to the joists. Cable must be secured to be considered supported when it is run vertically and when it is run on the sides and bottoms of framing members.

5. Secure NM and UF cable not more than 8 inches from boxes and terminations that do not have cable clamps. This includes most plastic boxes. Secure NM and UF cable not more than 12 inches from boxes and terminations that have cable clamps. This includes most metal boxes. Measure the support distance from where the cable sheathing ends in the box, not from the box itself.

6. Use NM cable only in dry locations that are indoors and not within concrete or masonry that is exposed to the ground. Do not use NM cable in conduit that is buried in the ground. Buried conduit is considered a wet location. You may use UF cable in wet locations, including outdoors and underground if it is not subject to damage.

VIOLATION! Do not install NM and UF cable inside cabinets.

VIOLATION! Do not install NM and UF cable in exposed walls and ceilings. You may install NM and UF cable in exposed basement ceilings and attics under certain conditions.

VIOLATION! Do not install NM cable outdoors. Outdoors includes buried conduit. You may install UF cable outdoors if it is protected from physical damage.

Support NM and UF cable at least every 41/2’. Cable on top of ceiling joists is considered supported.

Secure NM and UF cable within 8” from where the cable enters or leaves a plastic box. Measure from where the cable sheathing ends in the box, not from the edge of the box.

Conduit & Tubing Installation

1. Apply the following installation requirements to EMT, IMC, RMC, ENT, FMC, LFC, and RNC: (a) limit the number of 90-degree bends between junction boxes to not more than four; (b) install bushings where conduit or tubing enters a box, fitting, or enclosure, unless the device provides equivalent protection against damage to any wires that may be pulled into the device; (c) remove rough edges from the ends of all conduit and tubing that may damage wires; (d) support EMT, IMC, and RMC not more than every 10 feet and within 3 feet of junction boxes or terminations; (e) support ENT not more than every 3 feet, unless the ENT is in an accessible ceiling, such as a drop ceiling, and if the distance between light fixtures is not more than 6 feet; and (f) support FMC and LFC not more than every 41/2 feet and within 12 inches of junction boxes and terminations, unless the FMC and LFC is in an accessible ceiling, such as a drop ceiling, and if the distance between light fixtures is not more than 6 feet.

2. You may allow not more than 36 inches between the last support and a light fixture or other equipment that may need to be moved for service or replacement.

Wiring Support Requirements

1. Table 40 lists the on center support requirements for wiring methods. Note that some wiring methods have special requirements shown by the following superscripts: (1) support is not required in accessible ceilings, such as drop ceilings, if the distance between light fixtures is not more than 6 feet; (2) you may allow not more than 24 inches between the last support and a light fixture or other equipment that may need to be moved for service or replacement; (3) you may allow not more than 36 inches between the last support and a light fixture or other equipment that may need to be moved for service or replacement; (4) support NM and UF cable not more than 8 inches from boxes and terminations that do not have cable clamps. This includes most plastic boxes. Measure the support distance from where the cable sheathing ends in the box, not from the box itself; (5) support NM and UF cable not more than 12 inches from boxes and terminations that have cable clamps. This includes most metal boxes. (6) support RNC not more than 5 feet for conduit sizes between 11/4 and 2 inches.

Use wood or other substantial guards to protect NM and UF cable installed perpendicular to rafters within the protection area.

Use wood or other substantial guards to protect NM and UF cable installed on top of ceiling joists within the protection area.

Wiring Protection in Attics

1. Protect electrical cables in accessible attics by using substantial guard strips that are at least as tall as the electrical cables when: (a) access to the attic is by permanent stairs or ladders (such as a pull-down attic ladder), and the cables are within 7 feet vertically from the top of attic floor joists or truss bottom chords, or the cables run across the face (shortest dimension) of rafters, studs, or truss webs or chords, or (b) access to the attic is by scuttle hole or similar opening and the cables described in (a) are within 6 feet horizontally from the nearest point of the attic access opening.

2. You need not protect electrical cables in accessible attics when the cables are installed: (a) running parallel to the edge of the framing and at least 11/4 inches from the edge of the framing or (b) in holes that are at least 11/4 inches from the edge of the framing.

Protect exposed NM and UF cable installed in accessible attics and within the shaded protection area.

Electrical Receptacle Installation

Whether you call them outlets, plug-ins, or receptacles, these important devices represent the point where the rubber meets the road in your home wiring system. From the basic 15-amp, 120-volt duplex receptacle to the burly 50-amp, 240-volt appliance receptacle, the many outlets in your home do pretty much the same thing: transmit power to a load.

Learning the essential differences between receptacles does not take long. Amperage is the main variable, as each receptacle must match the amperage and voltage of the circuit in which it is installed. A 15-amp circuit should be wired with 15-amp receptacles; a 20-amp circuit needs 20-amp receptacles (identified by the horizontal slot that Ts into each tall polarized slot). A 20-amp multi-receptacle circuit may use either 15- or 20-amp receptacles. Receptacles for 240-volt service have unique slot configurations so you can’t accidentally plug in an appliance that’s not rated for the amperage in the circuit. Some receptacles can be wired using the push-in wire holes, but this is not recommended. Some receptacles provide built-in, ground-fault circuit protection, tripping the circuit breaker if there is a short circuit or power surge. These are easy to identify by reset and test buttons.

General Receptacle Installation Requirements

1. Use only grounding type (3-slot) when installing new receptacles in 15-amp and 20-amp branch circuits. You may replace existing 2-slot receptacles with a new 2-slot receptacle.

2. Mount receptacles in boxes that are recessed from the wall by seating the receptacle’s extension ears at the top and bottom of the receptacle against the wall surface.

3. Mount receptacles in boxes that are flush with the wall by seating the receptacle’s mounting yoke or strap against the box.

4. Do not allow the receptacle to move when a plug is inserted. This can, over time, cause wires to loosen, allow arcing, and cause a fire.

5. Install receptacle faceplates so that the plate completely covers the receptacle and so that the faceplate is flush against the wall. No gaps should exist between the receptacle and the faceplate or between the faceplate and the wall.

6. Install receptacles so that the face of the receptacle is either flush with or projects out from a nonmetallic faceplate.

7. Install receptacles so that the face of the receptacle projects out from a metallic faceplate at least (≥) 1/64 inch.

8. Install receptacles so that the wiring terminals are not exposed to physical contact.

Tamper-Resistant Receptacles

1. Install tamper-resistant receptacles in 120-volt, 15- and 20-amp general purpose branch circuits. These receptacles usually have an opening that moves to allow access to the receptacle. This requirement includes interior and exterior receptacles unless an exception applies. This requirement includes replacement of existing three-slot receptacles.

2. You do not need to install tamper-resistant receptacles if the receptacle: (a) is located more than 66 inches above the floor, (b) is part of a light fixture or appliance, or (c) is a single or duplex dedicated appliance receptacle into which one or two not easily movable appliances will be plugged.

Non-Grounding Type Receptacles

1. You may replace a non-grounding type receptacle (2-slot) with another non-grounding type receptacle.

2. You may replace a non-grounding type receptacle (2-slot) with a grounding type receptacle (3-slot) if: (a) the replacement receptacle is a GFCI receptacle and (b) the cover plate is labeled “No Equipment Ground.”

3. You may replace a non-grounding type receptacle (2-slot) with a grounding type receptacle (3-slot) if: (a) the replacement receptacle is supplied by a GFCI protected circuit and (b) the cover plate is labeled “GFCI Protected and No Equipment Ground.”

4. Use 1, 2, and 3 above only if no equipment grounding wire is available in the receptacle box. You must use a grounding type receptacle, and you must use the equipment grounding wire if it is available.

5. You may run an equipment grounding wire to the nearest box containing an equipment grounding wire if all hot, neutral, and grounding wires originate at the same panelboard.

6. Do not connect the neutral wire to the receptacle grounding lug. These “bootleg grounds” are a dangerous code violation.

Example of receptacle spacing requirements in a typical room. Measure receptacle spacing distance along the wall line. Install receptacles along partial height walls and along balcony guards in lofts and similar areas.

Example of countertop receptacle spacing in a typical kitchen.

Receptacle Installation in Rooms

1. Apply the following provisions to receptacles in living rooms, family rooms, bedrooms, dens, sunrooms, recreation rooms, dining rooms, breakfast rooms, libraries, and similar living areas. Kitchens, bathrooms, hallways, garages, laundry rooms, and exterior receptacles have their own installation requirements.

2. Install the required interior receptacles so that any point along a wall is not more than 6 feet from a receptacle. When measuring a wall, do not include operable doors, fireplaces, closet interiors, or similar openings, or fixed cabinets that do not have countertops or similar work surfaces. A wall begins at the edge of an opening and continues around any corners to the next opening. Walls include fixed (not sliding) panels in doors that are at least 2 feet wide. Walls include partial height walls that serve functions, such as room dividers, and walls that form breakfast bars and similar bar-type counters. Walls include guards and railings at balconies, raised floors, and other areas where furniture could be placed.

3. Locate floor receptacles intended to serve as required interior receptacles not more than 18 inches from the wall. You may install interior floor receptacles at any safe place, but you may count only receptacles not more than 18 inches from the wall among the required receptacles.

4. Install receptacles not more than 66 inches above the finished floor. You may install receptacles at any height, but you may count only receptacles not more than 66 inches above the finished floor among the required receptacles.

VIOLATION! Running a pigtail from the neutral terminal to the grounding screw on a receptacle is called a bootleg ground. It is usually done to make an ungrounded circuit appear to be grounded. It is very dangerous.

You must install receptacles behind a short run of countertop if it is at least 12” wide along a straight wall.

You must install receptacles behind a sink or cooking appliance if the countertop behind the sink or cooking appliance is at least 18” deep in a corner cabinet.

Kitchen Countertop Receptacle Installation

1. Install a GFCI protected receptacle at every kitchen countertop that is at least 12 inches wide.

2. Install kitchen countertop receptacles so that all points along the countertop wall are not more than 2 feet from a receptacle. A wall begins at the edge of an opening or appliance, and continues around any corners, and ends at the next opening or appliance. Include windows when measuring the wall unless the window is above a sink or cooking appliance.

3. Install receptacles behind a sink or cooking appliance located along a straight wall if the countertop behind the sink or cooking appliance is at least 12 inches wide. Install receptacles behind a sink or cooking appliance located along a wall corner if the countertop behind the sink or cooking appliance is at least 18 inches deep.

4. Install receptacles not more than 20 inches above the countertop. You may install receptacles at any height, but you may include only receptacles not more than 20 inches above the countertop among the required kitchen countertop receptacles.

5. Do not include among the required kitchen countertop receptacles: (a) receptacles located in appliance garages, (b) receptacles dedicated for a fixed-in-place appliance, or (c) receptacles not readily accessible for use by small appliances.

6. Do not install receptacles face up on work surfaces unless the receptacle is listed for this type of installation.

7. Locate the receptacle for the dishwasher in a space adjacent to the dishwasher, if installing a dishwasher receptacle. This does not apply to a hard-wired dishwasher outlet.

Kitchen Island & Peninsula Receptacles without a Sink or Cooking Appliance

1. Install at least one GFCI protected receptacle at every kitchen island and peninsula that measures at least 24 inches by at least 12 inches. Measure a peninsula from the interior connecting edge of the countertop.

2. Install kitchen countertop receptacles along any wall space above an island or peninsula countertop. Such wall space occurs when an island or peninsula is installed at a partial height wall.

3. You may install receptacles not more than 12 inches below an island or peninsula countertop if the countertop is flat and there is no wall space above the countertop or if the countertop is designed for access by the physically impaired. Do not install the required kitchen island or peninsula receptacle below a breakfast bar or other countertop that extends more than 6 inches beyond the supporting base.

Kitchen Island & Peninsula Receptacles with a Sink or Cooking Appliance

1. Install at least one GFCI protected receptacle not more than 24 inches from each side of a sink or cooking appliance installed in a kitchen island or peninsula.

2. Install receptacles behind a sink or cooking appliance if the countertop behind the sink or cooking appliance is at least 12 inches wide or at least 18 inches deep if the sink or cooking appliance is installed in a corner.

  1. Install kitchen countertop receptacles along any wall space above an island or peninsula countertop. Such wall space occurs when an island or peninsula is installed at a partial height wall.

4. You many install receptacles not more than 12 inches below an island or peninsula countertop if the countertop is flat and there is no wall space or cabinet above the countertop.

5. Do not install receptacles face up on countertops or similar work surfaces.

Bathroom Sink Receptacles

1. Install at least one GFCI protected receptacle not more than 36 inches from the outside edge of each sink basin in a bathroom. You may install the receptacle along a wall adjacent to the sink.

2. Do not install receptacles face up on work surfaces.

Laundry Receptacles

1. Install at least one 20-amp, 120-volt receptacle in the laundry area. This required receptacle usually serves the clothes washing machine. The required laundry receptacle is in addition to any required garage or basement receptacle if the laundry is in the garage or basement.

2. Provide GFCI protection for all 15- and 20-amp, 120-volt receptacles in the laundry area. This includes any dedicated receptacle for the clothes washing machine.

A GFCI protected receptacle must be installed within 36” of each bathroom sink basin.

An exterior-rated receptacle should be installed on both the front and back exterior walls of your house.

Exterior Receptacles

1. Install at least one GFCI protected, 15- or 20-amp, 120-volt receptacle on the front and back exterior wall of every home. Locate the receptacle so that it is accessible from grade level and is not more than 78 inches above finished grade level.

2. Install at least one GFCI protected, 15- or 20-amp, 120-volt receptacle within the perimeter of any balcony, deck, or porch that: (a) is accessible from inside the home and (b) has a usable area of at least 20 square feet. Locate the receptacle not more than 78 inches above the balcony, deck, or porch.

Basement Receptacles

1. Install at least one GFCI protected, 15- or 20-amp, 120-volt receptacle in an unfinished basement. Install at least one GFCI protected receptacle in the unfinished part of a basement that is partially finished.

2. You are not required to provide GFCI protection to a receptacle that is dedicated to serving a fire or security alarm system.

Garage & Accessory Building Receptacles

1. Install one GFCI protected, 15- or 20-amp receptacle for each motor vehicle parking space in an attached garage and in a detached garage that is supplied with electricity. Locate the receptacle not more than 66 inches above the floor. You are not required to supply electricity to detached garages and accessory buildings, but if you do you must install a receptacle. Accessory buildings include work sheds, storage sheds, tack sheds, barns, and similar buildings.

2. You may not serve any other outlets from the circuit serving garage receptacles except for readily accessible receptacles located outside the house. This means that garage lights and exterior lights and receptacles must be served by one or more separate circuits.

3. Do not connect other outlets to a receptacle circuit that is intended for charging an electric vehicle. These receptacle circuits are often 240 volts.

Ground-Fault (GFCI) & Arc-Fault (AFCI) Protection

Ground-Fault Location Requirements

1. Kitchen receptacles. Install ground-fault circuit-interrupter (GFCI) protection on all 120-volt receptacles that serve kitchen countertops. This does not include receptacles under the kitchen sink, receptacles located on kitchen walls that do not serve the countertop, and receptacles that are not within 6 feet of a sink.

2. Kitchen. Install GFCI protection on the outlets that supply dishwashing machines. This includes receptacles and hard-wired connections.

3. Bathroom receptacles. Install GFCI protection on all 120-volt receptacles located in bathrooms. This applies to all receptacles regardless of where they are located in the bathroom and includes receptacles located at countertops, inside cabinets, and along bathroom walls. This also applies to bathtubs and shower stalls that are not located in a bathroom. Install GFCI protection on all circuits serving electrically heated floors in bathrooms, kitchens, and around whirlpool tubs, spas, and hot tubs.

4. Garage and accessory building receptacles. Install GFCI protection on all 120-volt receptacles located in garages and grade-level areas of unfinished accessory buildings.

Ground-fault receptacles and circuit breakers detect unwanted current running between an energized wire and a grounded neutral wire.

A combination ARC-fault circuit breaker detects sparking (arcing) faults along damaged energized wires and detects these faults between wires. A branch ARC-fault circuit breaker only detects arcing faults between wires.

5. Exterior receptacles. Install GFCI protection on all 120-volt receptacles located outdoors. This does not apply to receptacles that are dedicated for deicing equipment and are located under the eaves. This does apply to holiday lighting receptacles located under the eaves.

6. Basement receptacles. Install GFCI protection on all 120-volt receptacles located in unfinished basements. An unfinished basement is not intended as habitable space and is limited to storage and work space.

7. Crawl space outlets. Install GFCI protection on all 120-volt outlets and lights located in crawl spaces. Receptacles in crawl spaces are not required unless equipment requiring service is located there.

8. Sink receptacles. Install GFCI protection on all 120-volt receptacles that are located within 6 feet of the top inside edge of a sink. This includes wall, floor, and countertop receptacles.

9. Boathouse receptacles. Install GFCI protection on all 120-volt receptacles located in boathouses. Install GFCI protection on all 120-volt and 240-volt receptacles that serve boat hoists.

10. Spas, tubs, and other circuits requiring ground-fault protection. Install GFCI protection on all circuits serving spa tubs, whirlpool tubs, hot tubs, and similar equipment. Refer to the general codes for more information about receptacles serving these components.

11. Install GFCI circuit breakers and receptacles so that they are readily accessible.

Arc-Fault Location Requirements

1. Install a combination type or an outlet (receptacle) type arc-fault circuit-interrupter (AFCI) on all 15- and 20-amp, 120-volt branch circuits serving sleeping, family, dining, living, sun, and recreation rooms, kitchens, laundry areas, and parlors, libraries, dens, hallways, closets, and similar rooms and areas. This means that 15- and 20-amp, 120-volt branch circuits serving most interior spaces in a home are required to have AFCI protection. Note that garages, basements, utility and mechanical rooms, and exterior branch circuits are not included in this list, although local building officials may include these areas by interpretation.

2. You may provide AFCI protection for the entire branch circuit by installing a combination-type AFCI circuit breaker in the electrical panel where the branch circuit originates.

3. You may provide AFCI protection to a branch circuit using several different combinations of branch-circuit type AFCI circuit breakers and branch-circuit type AFCI receptacles. Refer to general codes or your local building inspector for details about these alternate methods.

4. Provide AFCI for branch circuits that are modified, replaced, or extended. You may use either of the following methods: (a) install a combination-type AFCI circuit breaker in the electrical panel where the branch circuit originates or (b) install a branch-circuit type AFCI receptacle at the first receptacle in the existing branch circuit.

5. Install AFCI circuit breakers and receptacles so that they are readily accessible.

Receptacles for whirlpool tubs must be GFCI protected and readily accessible

Junction Boxes, Device Boxes & Enclosures

All electrical boxes are available in different depths. A box must be deep enough so a switch or receptacle can be removed or installed easily without crimping and damaging the circuit wires. Replace an undersized box with a larger box using Table 42 the Electrical Box Fill Chart (see here) as a guide. The NEC also says that all electrical boxes must remain accessible. Never cover an electrical box with drywall, paneling, or wall coverings.

Box shape is related to function, as electrical fixtures are created to fit on boxes of a particular shape. Octagonal and round boxes generally are designed for ceiling mounting, while square and rectangular boxes are sized for single-pole, duplex, and other standard switch and receptacle sizes.

Do not support heavy light fixtures using only the light fixture electrical box. The eye hook supporting this chandelier is driven into the same ceiling joist to which the electrical box is mounted.

Non-Metallic Box Installation

1. Use non-metallic boxes with NM type cable or with non-metallic conduit or tubing. You may use non-metallic boxes with metallic conduit or tubing if you maintain the electrical continuity of the metallic conduit or tubing by installing a bonding jumper through the box. In many situations it is easier to use a metallic box with metallic conduit or tubing.

2. Extend NM cable sheathing at least 1/4 inch into a non-metallic box knockout opening.

3. Secure NM cable, conduit, and tubing to each box. You may secure NM cable with cable clamps inside the box or with compression tabs provided where the cable enters the box. You do not need to secure NM cable to a standard single-gang box (21/4 by 4 inches) mounted in a wall or ceiling if you fasten the cable not more than 8 inches from the box and if the sheathing enters the box at least 1/4 inch. Measure the 8 inches along the length of the sheathing, not from the outside of the box.

Light Fixture Box Installation

1. Use boxes designed for mounting light fixtures if a light fixture is to be mounted to the box. These boxes are usually 4-inch round or octagonal.

2. You may use other boxes to mount light fixtures on walls if the fixture weighs less than 6 pounds and is secured to the box using at least #6 screws.

3. Support light fixtures weighing at least 50 pounds independently from the light fixture box unless the box is labeled as being designed to support a heavier light fixture. You may use the light fixture box to support light fixtures weighing less than 50 pounds. Note that ceiling fans are not light fixtures.

Box Contents Limitations

1. Limit the number of wires, devices (such as switches and receptacles), and fittings in a box. This limitation is primarily based on the heat generated by the wires and devices in the box. The actual size of the box relative to its contents is a secondary consideration.

2. Use the cubic inch volume printed on the box or provided in the box manufacturer’s instructions to determine box volume. Do not attempt to measure the box volume. Do not estimate box volume from the volume of similar size boxes. You will probably not get the same volume as provided by the manufacturer.

3. Use Table 41 to determine the volume units required by wires, devices, and fittings in a box.

Boxes must be installed so the front edges are flush with the finished wall surface and the gap between the box and the wall covering is not more than 1/8”.

Box Installation Tolerances

1. Install boxes in non-combustible material, such as masonry, drywall, plaster, or tile, so that the front edge is set back not more than 1/4 inch from the finished surface.

2. Install boxes in walls and ceilings made of wood or other combustible material so that the box’s front edge is flush with the finished surface or projects from the finished surface. You may use an extension ring, plaster ring, or similar device to extend the box to the finished wall surface. Mechanically secure the extension device to the box.

3. Cut openings for boxes in drywall and plaster so that the opening is not more than 1/8 inch from the perimeter of the box.

Box Support in Walls, Ceilings & Floors

1. Provide support for boxes that rigidly and securely fasten them in place. You may use nails or screws to support these boxes.

2. Protect screws inside boxes so that the threads will not damage the wires.

3. Wood braces used to support boxes must be at least 1 × 2 inches.

4. Use “cut-in” or “old work” retrofit boxes only if they have approved clamps or anchors that are identified for the location where they are installed.

Damp Locations

1. Install a receptacle box cover that is weatherproof when the cover is closed and a plug is not inserted into a receptacle located in a damp location. This applies to 15-amp and 20-amp receptacles. A damp area is protected from direct contact with water. Refer to the definition of damp location. You may use a receptacle cover suitable for wet locations in a damp location (see here).

2. Install a watertight seal between a flush-mounted receptacle and its faceplate. This will require a gasket or sealant between the finished surface (such as stucco, brick, or siding) and the faceplate.

Wet Locations

1. Install a receptacle box cover that is weatherproof when the cover is closed on any receptacle located in a wet location. This applies to 15-amp and 20-amp receptacles in any indoor or outdoor wet location. This applies regardless of whether or not a plug is inserted into the receptacle. Refer to the definition of wet location (see here).

2. Install a watertight seal between a flush-mounted receptacle and its faceplate. This will require a gasket or sealant between the finished surface (such as stucco, brick, or siding) and the faceplate.

Box Support by Raceways

1. Do not support any junction or device boxes using only conduit or tubing if the box volume is larger than 100 cubic inches.

2. Support boxes that do not contain switches, receptacles, or light fixtures by using at least two lengths of conduit threaded wrench-tight into the box. Secure the conduit not more than 3 feet from the box if the conduit enters from different sides of the box. Secure the conduit not more than 18 inches from the box if the conduit enters from the same side of the box. Example: if the conduit enters the box from the top and bottom of the box, then secure the conduit not more than 3 feet from the box. Example: if the conduit enters the box from only the top or only from the bottom, then secure the conduit not more than 18 inches from the box.

3. Support boxes that contain switches or receptacles or light fixtures by using at least two lengths of conduit threaded wrench-tight into the box. Secure the conduit not more than 18 inches from the box.

4. You may use RMC or IMC metal conduit to support light fixtures under certain conditions. Refer to the IRC for the exceptions.

Conduit should not be used as the sole means to support a box.

Secure each cable to a cabinet using an approved cable clamp.

Cables Secured to a Cabinet

1. Secure each individual cable to panelboard cabinets and to similar enclosures, unless the exception applies.

2. You may run NM cable into the top of a surface-mounted cabinet through an accessible rigid raceway under certain conditions. Refer to IRC Chapter 39 for the conditions.

Panel boxes, including the main service panel and subpanel boxes, also require the use of properly sized cable clamps wherever cables enter or exit the box.

Electrical Box Types

Box Installation Specifications

High-quality non-metallic boxes are rigid and don’t contort easily. A variety of adapter plates are available, including single-gang (A), double-gang (B), light fixture (C), and junction box cover plate (D). Adapter plates come in several thicknesses to match different wall constructions.

Boxes larger than 2 × 4” and all retrofit boxes must have either compression tabs or internal cable clamps. After installing cables in the box, tighten cable clamps over the cables so they are gripped firmly, but not so tightly that the cable sheathing is crushed.

Metal boxes must be bonded to the circuit grounding system. Connect the circuit grounding wires to the box with a pigtail wire and wire connector (as shown) or with a grounding clip.

Cables entering a metal box must be clamped. A variety of clamps are available, including plastic clamps (A, C) and threaded metal clamps (B).

Circuit Breaker Panels

The circuit breaker panel is the electrical distribution center for your home. It divides the current into branch circuits that run throughout the house. Each branch circuit is protected by a circuit breaker or fuse that protects the wires from dangerous current overloads. When installing new circuits, the last step is to connect the wires to new circuit breakers at the panel. Follow basic safety procedures and always shut off the main circuit breaker and test for power before touching any parts inside the panel. Never touch the service wire lugs. If unsure of your own skills, hire an electrician to make the final circuit connections. (If you have an older electrical service with fuses instead of circuit breakers, always have an electrician make these final hookups.)

If a circuit breaker panel does not have enough open slots for new full-size circuit breakers, you may be able to install 1/2-height (slimline) circuit breakers. Otherwise, you will need to install a subpanel.

Before installing any new wiring, evaluate your electrical service to make sure it provides enough current to support both the existing wiring and any new circuits. If your service does not provide enough current, you will need to upgrade to a higher amp rating panel with enough extra breaker slots for the new circuits you want to install.

Switch Installation

Switch Current Load Limitations

1. Do not use a switch in a circuit if the current load on the circuit exceeds the current rating of the switch. Example: a 15-amp snap switch may be overloaded if it switches ten 200-watt, 120-volt flood lights. Beware of overloads if the switch controls multiple high wattage flood lights or other high current draw equipment.

2. Use switches that are rated at least 80 percent of a motor’s full load current rating.

3. Install switches that have at least the same current rating as the circuit breaker or fuse protecting the branch circuit when the switch controls plug-and-cord connected equipment either by switching the receptacle or by switching a permanently connected cord. Example: a switch controls half of a receptacle in a bedroom. If the branch circuit is 20 amps, the switch should be rated at 20 amps or more.

4. Run the grounded (neutral) wire of a general purpose branch circuit to the switch box when the switch controls lighting loads. Refer to the IRC for exceptions that may occur in some unusual conditions.

Cover exposed electrical connections in timer boxes using the manufacturer-supplied cover.

A typical 15-amp single pole switch seen front and back.

Three-way switches and four-way switches are required for circuits with fixtures controlled by multiple switches. A four-way switch is seen here. Note that ON and OFF are not indicated on the toggle because these settings can change based on which switch was used last.

Connect the grounding wire to the switch grounding terminal when mounting the switch in a plastic box.

Switch Orientation

1. Install single-throw switches so that ON is in the up position when the device is installed vertically. You may install single-throw switches horizontally.

2. Use switches that clearly indicate whether the switch is in the ON or OFF position. This does not apply to three-way and four-way switches. This requirement is frequently waived when rocker type switches are used.

Timer Switches

1. Use timer switches with energized parts that are enclosed in the switch’s case or enclose the timer switch in a cabinet or box.

2. Install a barrier to guard against contact with energized parts.

Switch Height

1. Locate switches not more than 79 inches above the finished floor or finished grade. Measure to the center of the handle when in the up position.

2. Locate switches in readily accessible places.

Grounding of Switches, Boxes & Faceplates

1. Ground metal boxes containing switches, the switches themselves (including dimmers and similar devices), and metal faceplates covering switches. Ground the switch by mounting the switch to a grounded metal box using metal screws or by connecting an equipment grounding wire to the switch. Connect switches to the equipment grounding wire when using non-metallic boxes.

2. You may replace an existing ungrounded switch with another ungrounded switch if the wiring method has no equipment grounding wire. Protect these ungrounded switches that are located not more than 8 feet vertically or 5 feet horizontally from the ground or from grounded metal objects by: (a) installing a non-combustible and non-conductive faceplate using nonmetallic screws or (b) using a switch with a non-metallic strap or yoke or (c) installing GFCI protection on the circuit.

Switches in Wet Locations

1. Enclose switches and circuit breakers installed in wet locations in a weatherproof cabinet or enclosure.

2. Do not locate switches in shower or tub spaces unless the switch is part of a listed tub or shower assembly.

Switch Mounting in Boxes

1. Mount switches in boxes that are recessed from the wall by seating the switch’s extension ears at the top and bottom of the switch against the wall surface.

2. Mount switches in boxes that are flush with the wall by seating the switch’s mounting yoke or strap against the box.

3. Do not allow the switch body to move when the switch is operated. This can, over time, cause wires to loosen, potentially causing arcing and a fire.

Switch Faceplate Installation

1. Install switch faceplates so that the plate completely covers the switch and so that the faceplate is flush against the wall. No gaps should exist between the switch handle and the faceplate or between the faceplate and the wall.

Light Fixture Installation

Lights Required in Habitable Rooms

1. Install at least one switch-controlled light in every habitable room, kitchen, and bathroom. This light may be a switched (half-hot) receptacle in habitable rooms other than kitchens and bathrooms. In kitchens and bathrooms, the outlet must be a switched wall or ceiling lighting outlet. You may use lights controlled by occupancy sensors if the sensors have a manual override that allows switch control of the light.

Lights Required in Other Interior Spaces

1. Install at least one wall switch–controlled wall or ceiling light in every hallway, stairway, attached garage, and detached garage if the detached garage is provided with electricity.

2. Install at least one wall switch to control stairway lights if the stairs have at least (≥) 6 risers. Install a switch at: (a) each floor and (b) each landing that provides access to an interior or exterior entry opening.

Lights Required at Exterior Doors

1. Install at least one switch-controlled wall or ceiling light on the exterior side of every exterior door with grade level access. Exterior lights are not required at garage vehicle doors.

Lights Required in Attics, Crawlspaces & Basements

1. Install at least one light outlet in attics, crawlspaces, utility rooms, and basements if the area is used for storage or if it contains equipment that requires service. Locate the light outlet near any equipment that requires service.

2. Locate a switch for the light at the usual point of entry into the area. You may use a pull-chain-controlled light if the light is located at the usual point of entry into the area. This means that if the light is not at the entrance to the area, the light must be switched at the entrance.

Light Fixture Support

1. You may use a securely attached box to support light fixtures weighing less than 50 pounds. Note that ceiling fans are not considered light fixtures.

2. Do not use the screw shell of a light fixture to support anything that weighs more than 6 pounds or is more than 16 inches in any dimension.

Recessed Lights

1. Use recessed lights that are labeled as being thermally protected. Thermal protection shuts off power to the light at high temperatures. Thermal protection is not required if the recessed light is made, labeled, and installed so that it functions as if it were thermally protected.

2. Use insulation contact (IC) rated recessed lights when the recessed parts are installed in an insulated attic. IC rated recessed lights may not require clearance to insulation or to combustible materials.

3. Provide at least 3 inches of clearance between insulation and recessed lights that are not labeled as being insulation contact (IC) rated. Do not install insulation above non-IC rated recessed lights.

Choose the proper type of recessed light fixture for your project. There are two types of fixtures: those rated for installation within insulation (above) and those which must be kept at least 3” from insulation (top). Self-contained thermal switches shut off power if the unit gets too hot for its rating. A recessed light fixture must be installed at least 1/2” from combustible materials.

Keep all parts of lights and ceiling fans at least 3’ horizontally and 8’ vertically from bathtubs and showers.

Lights in Wet & Damp Locations

1. Install lights in wet and damp locations so that water cannot enter or accumulate in the wiring or energized parts.

2. Use only lights labeled SUITABLE FOR WET LOCATIONS when installing lights that may be subject to direct contact with water. Refer to the definition of wet location (see here).

3. Use lights labeled either SUITABLE FOR WET LOCATIONS or SUITABLE FOR DAMP LOCATIONS when installing lights in damp locations. Refer to the definition of damp location (see here). Light fixtures, including ceiling fans, intended for indoors may not be installed in either wet or damp locations.

Ceiling Fans

1. Support ceiling fans weighing not more than 70 pounds using boxes listed and labeled to support the fan.

2. Support ceiling fans weighing more than 70 pounds independently from the box.

Light fixtures installed in damp areas should be rated for moisture exposure.

Look for heavy-duty ceiling boxes that are specifically rated for ceiling fans and heavy light fixtures.

A sturdy metal brace with an integral box that is installed between ceiling joists can be used to support ceiling fans and heavy light fixtures.

Ceiling Fans & Lights Near Tubs & Showers

1. Install ceiling fans, cord-connected lights, lights suspended by cords, chains, or cables, and track lights so that no part of the light or fan falls within an exclusion zone measuring 3 feet horizontally from the base of the tub or shower stall threshold and 8 feet vertically from the top of the tub rim or shower stall threshold. Parts include fan blades, bulb enclosures, hanging chains, and other parts connected to or hanging from the light or fan.

2. Use light fixtures that are listed for damp locations if the fixture is: (a) located within the tub or shower area and (b) within 8 feet from the top of the tub rim or shower threshold.

3. Use light fixtures that are listed for wet locations if the fixture is: (a) located within the tub or shower area, (b) within 8 feet from the top of the tub rim or shower threshold, (c) subject to shower spray.

Closet Lights

Applicable Code DefinItions for Closets:

Clothes closet: A space intended for storage of clothing, a clothes closet usually contains a horizontal rod for hanging clothing. This definition implies that this section does not apply to storage areas such as linen closets and pantries. As with all codes, application of this section depends on interpretation by the local building official.

Closet storage area: Clearances to light fixtures required by this IRC Section are between light fixtures and the closet storage area. The closet storage area is a space consisting of a hanging rod storage area and a shelf storage area. The required clearance applies to both areas. The clearances to light fixtures apply whether or not shelves or hanging rods are currently installed in the closet. This means that if a shelf or rod could be installed on a clothes closet wall, you must assume that one will be installed and that the clearances to light fixtures apply.

Hanging rod storage area: This area begins at the closet floor and ends 6 feet above the closet floor or at the highest hanging rod, whichever is higher. The hanging rod storage area includes all of the space within 24 inches horizontally from the back and sides of the closet walls.

Shelf storage area: This begins 6 feet above the closet floor or at the highest hanging rod, whichever is higher, and ends at the closet ceiling. The shelf storage area includes all of the space within 12 inches horizontally from the back and sides of the closet walls or within the width of the shelf, whichever is wider.

Light Fixture Clearances in Clothing Closets

1. Do not install any incandescent or LED light fixture in a clothes closet if any part of the lamp is exposed. This includes both surface mounted and recessed light fixtures. This includes incandescent light fixtures that have lamps such as compact fluorescent installed because the fluorescent lamp could be replaced with an incandescent lamp. This includes hanging light fixtures.

2. Provide at least 12 inches between surface mounted incandescent or LED light fixtures and the closest point of the closet storage area.

3. Provide at least 6 inches between recessed incandescent and LED light fixtures and the closest point of the closet storage area.

4. Provide at least 6 inches between fluorescent light fixtures and the closest point of the closet storage area.

5. You may install surface-mounted fluorescent and LED light fixtures within the closet storage area if the fixture is identified for use within the area.

Using Flexible Cords with Equipment

1. Use flexible cords only to connect an appliance to a receptacle and only if the appliance manufacturer’s instructions allow connection by a flexible cord.

2. Do not run or conceal flexible cords in walls, ceilings, floors, or raceways.

3. Do not splice or tap flexible cords.

4. Provide power to flexible cords through an attachment plug. Do not hard-wire flexible cords directly to a power source.

5. Do not use flexible cords as a substitute for permanent wiring.

Closet hanging rod and shelf storage areas.

Satellite Dishes, Television & Radio Antennas

This material applies to receiving antennas, such as satellite dishes, and traditional radio and television antennas. It does not apply to cable TV system wiring, and it does not apply to network-powered broadband communication system wiring. This material also applies to radio transmission antennas and towers, such as those used by amateur radio operators.

Antenna Prohibited Installation Locations

1. Do not attach or secure (guy) antennas to electric service entrance masts, poles that support electric power wires, plumbing vent pipes, or furnace vent pipes.

2. Do not attach or secure (guy) large antennas to chimneys, including framed and brick veneer chimneys. These chimneys are not designed to bear the loads imposed by large antennas. Consult a qualified contractor or chimney sweep before attaching or securing large antennas to chimneys.

3. Provide clearance between antennas and masts and electric power wires so that if the antenna falls, it is unlikely to fall on the electric power wires.

Television aerials and satellite dishes must be located well away from power lines. They should be properly grounded and protected against lightning strikes.

Antenna Wire & Cable Clearance to Electric Power Lines

1. Do not install outdoor, aboveground antenna wires and cables so that they cross over electric power wires. Avoid, if possible, installing outdoor, aboveground antenna wires that cross under electric power wires. Electric power wires include wires on overhead power poles, overhead service drop wires, and any electric power wires running between buildings.

2. Provide at least 2 feet of clearance between outdoor, aboveground antenna wires and cables and electric power lines that can swing freely.

3. Provide at least 4 inches between outdoor antenna wires and cables and most residential electric power wires when both are secured so that they cannot move.

4. Provide at least 12 inches of clearance between underground antenna wires and underground cables and electric power wires.

  1. Provide at least a 2-inch clearance between indoor antenna wires and cables and indoor electric power wires.
Grounding Antennas, Masts, Wires & Cables

1. Install a ground/bonding wire between metal antenna masts, towers, and support poles and an approved grounding point. Metal antenna masts include the short metal mast commonly found on satellite dishes.

2. Install a grounding/bonding wire between the coaxial cable shield and an approved grounding/bonding point. You must ground/bond both the coaxial cable shield and any metal antenna mast.

3. Use at least #10 AWG copper wire or #17 copper clad steel wire as the grounding/bonding wire for receiving equipment only. You may use a #8 AWG aluminum or copper-clad aluminum grounding/bonding wire for receiving equipment only if it is not in contact with masonry, and is not installed in a corrosive environment, and is installed at least 18 inches above the ground at all points, including at the connection to the grounding/bonding point.

4. Use at least #10 AWG copper, bronze, or copper-clad steel as the grounding/bonding wires for transmitting/receiving stations. Use a larger wire if the lead-in wires are larger than #10 AWG. Insulation is not required on any grounding/bonding wire. You may use solid or stranded grounding/bonding wires for transmitting or receiving stations.

5. Run the grounding/bonding wire in as straight a line as possible to an approved grounding point.

6. Connect the grounding/bonding wire(s) to one of the following approved grounding/bonding points: (a) the intersystem bonding connection terminal; (b) the building’s grounding electrode, grounding electrode wire, or other metal part of the building grounding electrode system; (c) a metal water service pipe not more than 5 feet from where the water service pipe enters the building; (d) the service equipment cabinet or non-flexible metal service equipment raceway; or (e) the other system grounding/bonding connection described in the IRC.

7. Do not connect the antenna mast or coaxial cable to its own ground rod unless the ground rod is bonded to the building grounding electrode system using at least #6 AWG copper wire.

8. Secure and support the grounding/bonding wire by fastening it to the building or other substantial structure. Insulating supports are not required.

9. Protect the grounding/bonding wire if it is exposed to physical damage. Use a wiring method, such as metallic conduit, that is approved for use in physical damage environments.

10. Bond (connect) both ends of any metallic conduit and tubing used to protect the grounding/bonding wire to the bonding/grounding wire.

Grounding Wire Connection to the Grounding Point

1. Use a listed clamp, listed pressure connector, or other listed means to connect the grounding wire to the grounding point.

2. Install the listed connector so that it is both physically and electrically connected to the grounding point. This means removing paint, lacquer, rust, and other non-conductive material before attaching the listed connector to the grounding point.

3. Connect not more than one grounding wire to a listed connector unless the connector is listed to accept more than one wire.

4. Use a listed connector that is compatible with both the grounding point and the grounding wire material. Example: an iron or steel clamp is not compatible with a copper water pipe. Both materials will corrode over time.

Broadband Cable Wiring

This material applies to network-powered broadband communication system wiring. These systems usually deliver television, telephone, Internet, and similar services. They operate at up to 150 volts and 100 watts. This material does not apply to standard cable TV system wiring, and it does not apply to satellite TV antenna wiring. Some new communication systems use fiber-optic cables. This article does not apply to fiber-optic cables.

Overhead Broadband Cable Clearance

1. Install outdoor, aboveground broadband communication cables above electric power wires whenever possible.

2. Avoid installing outdoor, aboveground broadband communication cables near electric power wires that can swing freely. Electric power wires include wires on overhead power poles, overhead service drop wires, and any electric power wires running between buildings. Provide at least 12 inches of clearance between outdoor, above-ground broadband communication cables and electric power lines that can swing freely. Increase clearance to at least 40 inches at the power pole.

3. Provide at least 4 inches between outdoor broadband communication cables and most residential electric power wires when both are secured so that they cannot move.

4. Measure the vertical clearance between overhead broadband cables and the ground, walkway, driveway, or street beginning at the lowest hanging point of the cables and ending at the surface under the lowest point.

5. Provide at least 91/2 feet vertical clearance between broadband cables and finished grade, sidewalks, or platforms accessed by pedestrians only.

6. Provide at least 111/2 feet vertical clearance between overhead broadband cables and residential property and driveways.

7. Provide at least 151/2 feet vertical clearance between overhead broadband cables and public streets, alleys, roads, or parking areas subject to truck traffic.

8. Provide the same clearance between overhead broadband cables and swimming pools, spas, and hot tubs as for electrical wires.

9. Provide at least 8 feet vertical clearance between broadband cables and most low-slope roofs.

10. Provide at least 18 inches of vertical clearance between broadband cables and roof overhangs if not more than 4 feet of cable passes over the roof and if the cable terminates at a through-the-roof raceway or support. This is similar to clearances allowed for service drop wires.

11. Provide at least 3 feet vertical clearance between broadband cables and roofs with a slope of at least 4 inches in 12 inches.

Broadband Cable Burial Depth

1. Bury broadband cables at least 18 inches deep when the cables are not covered by concrete or enclosed in conduit or other raceways. You may reduce the depth to at least 12 inches when the cables are under concrete residential driveways, patios, and similar concrete slabs. Refer to the NEC for burial depths when the cables are enclosed in conduit or raceways.

Grounding Broadband Cables

1. Install a copper (or other corrosion-resistant material) grounding/bonding wire at least #14 AWG between the broadband cable shield and an approved grounding/bonding point.

2. Connect the grounding/bonding wire to the broadband cable shield at a point as close as possible to where the outside cable terminates outside the building. If the outside cable enters the building, make this connection at a point as close as possible to where the outside cable enters the building.

3. Run the grounding/bonding wire in as straight a line and as short a distance as possible from the broadband cable shield grounding/bonding connection point to an approved grounding/bonding point.

4. Limit the length of the grounding/bonding wire to not more than 20 feet. If the broadband cable shield ground/bonding point is more than 20 feet from an approved grounding point, you may install at least an 8-foot-long ground rod near where the cable enters the building and bond the ground rod to the electrical service grounding system using at least #6 AWG copper wire.

5. Connect the grounding/bonding wire(s) to one of the following approved grounding/bonding points in other than manufactured homes: (a) the intersystem bonding connection terminal; (b) the building’s grounding electrode, grounding electrode wire, or other metal part of the building grounding electrode system; (c) a metal water service pipe not more than 5 feet from where the water service pipe enters the building; (d) the service equipment cabinet or non-flexible metal service equipment raceway; or (e) the other system grounding/bonding connection described in the IRC.

6. Connect the grounding/bonding wire(s) to one of the approved grounding/bonding points described above at manufactured homes if the home has service equipment or a grounded power disconnecting means located not more than 9 feet from the nearest wall of the home.

7. Connect the grounding/bonding wire(s) to the manufactured home’s grounding electrode if the home does not have service equipment or a grounded power disconnecting means located not more than 9 feet from the nearest wall of the home. Use at least #6 AWG copper wire to make this connection.

8. Connect the broadband cable shield to the metal frame of the manufactured home if the grounding/bonding connection is made as described in #7 above. Use at least #12 AWG copper wire to make this connection.

9. Protect the grounding/bonding wire if it is exposed to physical damage. Use a wiring method, such as metallic conduit, that is approved for use in physical damage environments.

Broadband Cable & Electric Power Wire Separation

1. Do not run low-power or medium-power broadband cables in the same conduit, tubing, raceway, junction and device box, or enclosure with electric power wires unless an exception applies.

2. You may install low-power and medium-power broadband cables and electric power wires in the same cabinet or box when the electric power wires are intended to supply power to the broadband cable system, such as for an amplifier.

3. Separate indoor broadband cables and electric power wires by at least 2 inches.

4. Separation described in number 3 is not required if the electric power wires or broadband cables are enclosed in conduit, tubing, metal cable armor or if the electric power wires and cables are permanently separated from each other by a continuous non-conductive material.

5. Separation described in number 3 is not required if the electric power wires are contained in a jacket, such as with types NM, UF, and AC cable. This means that, in most cases, separation between broadband cables and electric power wires is required only when individual electric wires are installed in conduit or tubing.

6. Provide, if possible, at least 6 feet of separation between coaxial cables and any part of a lightning protection system.

APPENDIX

Common Mistakes

An electrical inspector visiting your home might identify a number of situations that are not up to code. These situations may not be immediate problems. In fact, it is possible that the wiring in your home has remained trouble free for many years.

Nevertheless, any wiring or device that is not up to code carries the potential for problems, often at risk to your home and your family. In addition, you may have trouble selling your home if it is not wired according to accepted methods.

Most local electrical codes are based on the National Electrical Code (NEC), a book updated and published every three years by the National Fire Protection Agency. This code book contains rules and regulations for the proper installation of electrical wiring and devices. Most public libraries carry reference copies of the NEC.

All electrical inspectors are required to be well versed in the NEC. Their job is to know the NEC regulations and to make sure these rules are followed in order to prevent fires and ensure safety. If you have questions regarding your home wiring system, your local inspector will be happy to answer them.

While a book cannot possibly identify all potential wiring problems in your house, we have identified some of the most common wiring defects here and will show you how to correct them. When working on home wiring repair or replacement projects, refer to this section to help identify any conditions that may be hazardous.

Electrical inspectors are on the lookout for common mistakes. The following pages detail problems to avoid so you will pass inspection on the first try.

Service Panel Inspection

Problem: Rust stains are found inside the main service panel. This problem occurs because water seeps into the service head outside the house and drips down into the service panel.

Solution: Have an electrician examine the service head and the main service panel. If the panel or service wires have been damaged, new components must be installed.

Problem: This problem is actually a very old and very dangerous one. A penny or a knockout behind a fuse effectively bypasses the fuse, preventing an overloaded circuit from blowing the fuse. This is very dangerous and can lead to overheated wiring.

Solution: Remove the penny and replace the fuse. Have a licensed electrician examine the panel and circuit wiring. If the fuse has been bypassed for years, wiring may be dangerously compromised, and the circuit may need to be replaced.

Problem: Two wires connected to one single-pole breaker is a sign of an overcrowded panel and also a dangerous code violation unless the breaker is approved for such a connection.

Solution: If there is room in the panel, install a separate breaker for the extra wire. If the panel is overcrowded, have an electrician upgrade the panel or install a subpanel.

Inspecting the Bonding Jumper Wire

Problem: Grounding system jumper wire is missing or is disconnected. In most homes the grounding jumper wire attaches to water pipes on either side of the water meter.

Solution: Attach a jumper wire to the water pipes on either side of the water meter using pipe clamps. Use wire that is the same size and type as the grounding electrode wire.

Common Cable Problems

Problem: Cable running across joists or studs is attached to the edge of framing members. Electrical codes forbid this type of installation in exposed areas, such as unfinished basements or walk-up attics.

Solution: Protect cable by drilling holes in framing members at least 2” from exposed edges and threading the cable through the holes.

Problem: Cable running along joists or studs hangs loosely. Loose cables can be pulled accidentally, causing damage to wires.

Solution: Anchor the cable to the side of the framing members at least 11/4” from the edge using plastic staples. NM (non-metallic) cable should be stapled every 41/2’ and within 8” of each electrical box.

Problem: Cable threaded through studs or joists lies close to the edge of the framing members. NM (non-metallic) cable (shown cutaway) can be damaged easily if nails or screws are driven into the framing members during remodeling projects.

Solution: Install metal nail guards to protect cable from damage. Nail guards are available at hardware stores and home centers.

Problem: Unclamped cable enters a metal electrical box. Edges of the knockout can rub against the cable sheathing and damage the wires.

NOTE: With plastic boxes, clamps are not required if cables are anchored to framing members within 8” of the box.

Solution: Anchor the cable to the electrical box with a cable clamp. Several types of cable clamps are available at hardware stores and home centers.

Problem: Cables are spliced outside an electrical box. Exposed splices can spark and create a risk of shock or fire.

Solution: Bring installation up to code by enclosing the splice inside a metal or plastic electrical box. Make sure the box is large enough to accommodate the number of wires it contains.

Checking Wire Connections

Problem: Two or more wires are attached to a single-screw terminal. This type of connection is seen in older wiring but is now prohibited by the NEC.

Solution: Disconnect the wires from the screw terminal, then join them to a short length of wire (called a pigtail) using a wire connector. Connect the other end of the pigtail to the screw terminal.

Problem: Bare wire extends past a screw terminal. Exposed wire can cause a short circuit if it touches the metal box or another circuit wire.

Solution: Clip the wire and reconnect it to the screw terminal. In a proper connection, the bare wire wraps completely around the screw terminal, and the plastic insulation just touches the screw head.

Problem: Wires are connected with electrical tape. Electrical tape was used frequently in older installations, but it can deteriorate over time, leaving bare wires exposed inside the electrical box.

Solution: Replace electrical tape with wire connectors. You may need to clip away a small portion of the wire so the bare end will be covered completely by the connector.

Problem: Nicks and scratches in bare wires interfere with the flow of current. This can cause the wires to overheat.

Solution: Clip away the damaged portion of the wire, then restrip about 3/4” of insulation and reconnect the wire to the screw terminal.

Electrical Box Inspection

Problem: No protective sleeve on armored cable. Sharp edges of the cable can damage the wire insulation, creating a shock hazard and fire risk.

Solution: Protect the wire insulation by installing a plastic sleeve around the wires. Sleeves are available at hardware stores. Wires that are damaged must be replaced.

Problem: Insulation on wires is cracked or damaged. If damaged insulation exposes bare wire, a short circuit can occur, posing a shock hazard and fire risk.

Solution: Wrap damaged insulation temporarily with plastic electrical tape. Damaged circuit wires should be replaced by an electrician.

Problem: Open electrical boxes create a fire hazard if a short circuit causes sparks (arcing) inside the box.

Solution: Cover the open box with a solid metal cover plate, available at any hardware store. Electrical boxes must remain accessible and cannot be sealed inside ceilings or walls.

Problem: Short wires are difficult to handle. The NEC requires that each wire in an electrical box have at least 6” of workable length.

Solution: Lengthen circuit wires by connecting them to short pigtail wires using wire connectors. Pigtails can be cut from scrap wire but should be the same gauge and color as the circuit wires and at least 6” long.

Problem: A recessed electrical box is hazardous, especially if the wall or ceiling surface is made from a flammable material, such as wood paneling. The NEC prohibits this type of installation.

Solution: Add an extension ring to bring the face of the electrical box flush with the surface. Extension rings come in several sizes and are available at hardware stores.

Problem: Open electrical boxes create a fire hazard if a short circuit causes sparks (dust and dirt in an electrical box can cause hazardous, high-resistance short circuits). When making routine electrical repairs, always check the electrical boxes for dust and dirt buildup.

Solution: Vacuum the electrical box clean using a narrow nozzle attachment. Make sure power to the box is turned off at the main service panel before vacuuming.

Problem: Crowded electrical box (shown cutaway) makes electrical repairs difficult. This type of installation is prohibited because heat in the box may cause a fire.

Solution: Replace the electrical box with a deeper electrical box.

Problem: Light fixture is installed without an electrical box. This installation exposes the wiring connections and provides no support for the light fixture.

Solution: Install an approved electrical box to enclose the wire connections and support the light fixture.

Inspecting Receptacles & Switches

Problem: Octopus receptacle attachments used permanently can overload a circuit and cause overheating of the receptacle.

Solution: Use a multi-receptacle power strip with built-in overload protection. This is for temporary use only. If the need for extra receptacles is frequent, upgrade the wiring system.

Problem: Scorch marks near screw terminals indicate that electrical arcing has occurred. Arcing usually is caused by loose wire connections.

Solution: Replace the receptacle. Make sure wires are connected securely to screw terminals.

Problem: Exterior receptacle box allows water to enter the box when receptacle slots are in use.

Solution: Replace the old receptacle box with an in-use box that has a bubble cover to protect plugs from water while they are in the slots.

Problem: White neutral wires are connected to a switch. Although the switch appears to work correctly in this installation, it is dangerous because the light fixture carries voltage when the switch is off.

Solution: Connect the black hot wires to the switch, and join the grounded white wires together with a wire connector.

Problem: White neutral wires are connected to the brass screw terminals on the receptacle, and black hot wires are attached to silver screw terminals. This installation is hazardous because live voltage flows into the long neutral slot on the receptacle.

Solution: Reverse the wire connections so that the black hot wires are attached to brass screw terminals and white neutral wires are attached to silver screw terminals. Live voltage now flows into the short slot on the receptacle.

Measurement Conversions

ENGLISH TO METRIC

TO CONVERT:TO:MULTIPLY BY:
InchesMillimeters25.4
InchesCentimeters2.54
FeetMeters0.305
YardsMeters0.914
Square inchesSquare centimeters6.45
Square feetSquare meters0.093
Square yardsSquare meters0.836
OuncesMilliliters30.0
Pints (US)Liters0.473 (lmp. 0.568)
Quarts (US)Liters0.946 (lmp. 1.136)
Gallons (US)Liters3.785 (lmp. 4.546)
OuncesGrams28.4
PoundsKilograms0.454

 

TO CONVERT:TO:MULTIPLY BY:
MillimetersInches0.039
CentimetersInches0.394
MetersFeet3.28
MetersYards1.09
Square centimetersSquare inches0.155
Square metersSquare feet10.8
Square metersSquare yards1.2
MillilitersOunces.033
LitersPints (US)2.114 (lmp. 1.76)
LitersQuarts (US)1.057 (lmp. 0.88)
LitersGallons (US)0.264 (lmp. 0.22)
GramsOunces0.035
KilogramsPounds2.2

Resources

Air Diffusion Council (ADC)

Flexible air ducts

847-706-6750

www.flexibleduct.org

American Concrete Institute

Document ACI 332

248-848-3800

www.concrete.org

American Society of Home Inspectors (ASHI)

Information and references

847-759-2820

www.ashi.org

American Wood Council

“Prescriptive Residential Deck Construction Guide”

202-463-2766

www.awc.org

Black & Decker Corporation

Power tools & accessories

800-544-6986

www.blackanddecker.com

International Association of Plumbing and Mechanical Officials (IAPMO)

Publishes Uniform Plumbing Code® and Uniform Mechanical Code®

909-472-4100

www.iapmo.org

International Code Council (ICC)

Develops residential and commercial building codes

Publishes International Residential Code®

888-422-7233

www.iccsafe.org

National Fire Protection Association (NFPA)

Publishes National Electrical Code® (NEC)

800-344-3555

www.nfpa.org

Photo Credits

Bruce Barker: 52, 188, 207

City of Swainsboro: 11 (top)

iStock: 35 (left), 39 (bottom), 70 (top), 218

Moberg Fireplaces (www.mobergfireplaces.com): 104

Shutterstock: 21 (top left), 25 (top right), 30, 34 (both), 35 (right), 62, 101 (both)

Index

aboveground exhaust duct construction, 38

aboveground service, 180, 182

ABS plastic pipe joints, 144

accessible (readily), 170

accessible (wires), 170

air, prohibited sources for return and outdoor, 117

air admittance valve, 126, 155

air conditioners. See also heating and air conditioning

condensate disposal for, 114

parts for central, 110

room units, 190

air gaps, 166

air intake vents, 111

air movement requirements, 37

airtight construction, 119

aluminum wire, recognizing, 224

American Concrete Institute, 49

anchor bolts, 51

anchor straps, 51

antennas, 218

appliances

chimney as vent for, 105

circuits for, 190

fuel-burning, 118

HVAC, 110

not requiring a vent, 123

prohibited locations for, 111

arc-fault (AFCI) protection, 203

area requirements, 20

area wells, 31

armored cable, 217

attics

access to, 95

lights required in, 214

storage in, 91

wiring protection in, 197

Authority Having Jurisdiction (AHJ), 11

band board, 65

bars, 30

baseboard heating systems, 112

basements

ceiling height for, 20

concrete for, 50

escape openings in, 30

lights required in, 214

receptacles in, 201, 203

bathrooms

ceiling fans and lights near, 215

circuits for, 190

design standards for, 21

receptacles in, 201, 202

windows in, 35

bedroom floor joist spans, 62

bend (elbow), 140

bonding, 170, 184

bonding jumper wire, 225

bottom plate construction, 75

braced wall, 78

branch circuit

definition of, 170

load limits for, 189

quantity of receptacles on, 191

requirements for, 189

branch drain, 126

branch vent, 126

braze (brazing), 126

brick veneer, 103

bridging, 66

broadband cable wiring, 220

building departments, 11

building design and safety

about, 19

door and window hazards, 34

egress doors, 32

emergency escape openings, 30

exterior doors, 33

fire separations, 22

habitable rooms, 20

smoke and carbon monoxide alarms, 42

stairways, 24

ventilation and exhaust, 36

building drain, 126

building sewer, 126

cable

common problems with, 225

definition of, 170

secured to cabinet, 207

carbon monoxide alarms, 42

ceiling fans, 215

ceiling height, minimum, 20

ceiling joist

bearing on support, 88

bridging and lateral support for, 88

deflection for, 92

nailing to rafter, 89

notches and holes in, 88

span definitions for, 91, 92

ceilings, fire separation and, 23

central air conditioner parts, 110

certificates of occupancy, 15

chimney crickets, 102

chimneys, 104

circuit breaker panels, 210

clay soil, 48

cleanout openings, 146

closed-cut valley flashing, 101

closet bend, 140

closet flange, 139, 140, 161

closet lights, 216

clothes dryer exhaust requirements, 40

clothes washing machines, 163

code compliance, 11

codes & permits, basics of, 8

cold water supply system, 131

collar ties, 88

combustion air

for fireplaces, 105

for fuel-burning appliances, 118

concrete, foundation, 50

concrete encased electrodes, 187

condensate disposal, 114

conduit and tubing installation, 196

connections and joints, drain and sewer pipe, 142

continuity, 29

corrugated stainless steel gas tubing, bonding, 188

coupling, 140

crawlspaces, 52, 203, 214

cripple wall framing, 77

cutoff valves, 136

damp locations, 206, 215

dead load, 46, 91

decks, 54

beams, 58

bracing, 61

flashing, 59

flooring, 60

footings, 56

guards and handrails, 60

joists, 56

posts, 58

stairs, 60

decorative chimney covers, 107

deflection of structural components, 46

device boxes, 204

discharge tubes, 114

dishwashing machines, 162

door hazards, 34

doors

exterior, 33, 214

how to flash, 85

lights required at, 214

downdraft ventilation, 39

draftstopping, 68

drainpipe, 126, 137

drip edge, 99

drip pans, 159

drop wire clearances, 182

ducts

combustion air, 119

construction of, 40

installation of HVAC, 116

length of, 40

sizing of HVAC, 114

edge spacing, 70

egress doors, 32

egress requirements, 30

egress wells, 31

egress windows, 30

elastomeric gaskets, 127, 138, 144, 145

electric equipment grounding, 217

electric radiant (baseboard) heating systems, 112

electrical boxes

inspection of, 229

length of wires extending from, 177

non-metallic, 204

specifications for, 209

supports for, 206

types of, 208

unclamped cable entering, 227

electrical branch circuit requirements, 189

electrical currents, understanding, 173

electrical panels

identification of circuits in, 174

inspecting for proper grounding, 185

prohibited locations for, 174

working clearances around, 175

electrical receptacle installation, 198

electrical rough-in inspection, 17

electrical service

disconnecting, 179

identifying, 180

electrical system

about, 169

broadband cable wiring, 220

electrical branch circuit requirements, 189

electrical grounding and bonding, 184

electrical receptacle installation, 198

ground-fault (GFCI) and arc-fault (AFCI) protection, 202

junction boxes, device boxes and enclosures, 204

light fixture installation, 214

satellite dishes, television and radio antennas, 218

switch installation, 212

understanding electrical circuits, 173

electrodes, grounding, 186

emergency escape openings, 30

enclosures, 204

endnailing, 70

environmental load, 46

exhaust, 36

exhaust fan labels, 37

exhaust hoods, 38

exterior components

about, 97

fireplaces and chimneys, 104

shingle roof-covering installation, 98

exterior doors, 33, 214

exterior receptacles, 201, 202

exterior stairways, 24, 25

facenailing, 70

factory-built fireplaces, 106

fall hazard rules, 34, 35

fasteners, roofing, 103

final inspections, 15

fire separation, 22

fireblocking, 82

fireplaces, 104

fire-rated doors, 22

fittings

definition of, 126

DMV, 140

for water supply lines, 133

fixture drain, 126

fixtures

definition of, 126

flow rate at, 132

flashing

roof, 101

for skylights, 102

vent, 150

wall penetration, 84

flexible cords, 197

flexible HVAC duct installation, 116

flexible water connectors, 134

floor joist openings, 66

floor joist span tables, 62

floor sheathing, 67

floor systems, 62

floor trusses, 68

food disposers, 163

footings

inspection of, 16

width and depth for, 49

forced air heating system, 111

foundation anchors, 51

foundation walls inspection, 16

foundations, 48

four-way switches, 212

FOUR-wire feeder, 186

framing inspection, 17

framing materials, wood nailing to, 71

freeze proof yard hydrant, 129

furnaces, 110

fuses, common problems with, 223

garage

appliances installed in, 113

concrete for, 50

definition of, 22

fire separation and, 22

receptacle circuits for, 190

receptacles in, 201, 202

gas fireplaces, 106

gas furnace parts, 110

gas pipe bonding, 188

girders, on supports, 64

grade plane, 10

grandfathering existing work, 13

gravel soil, 48

ground fault, 170, 184

grounded (definition), 170

grounded wire, 170

ground-fault (GFCI), 202

grounding, 184, 220

grounding electrode, 170

grounding electrode wire, 170, 186, 219

grounding wire, 170

grounding wire continuity, 178

guards, 28, 60

gypsum drywall, 23

habitable rooms, 20, 214. See also individual rooms

handrails, 28, 60

hardware

for decks, 54, 55

for joists, 65

headers, on supports, 64

headwalls, 103

hearth extension, 104

heat alarms, 42

heat producing devices, insulation clearance to, 95

heating and air conditioning

about, 109

combustion air for fuel-burning appliances, 118

in garage, 23

HVAC appliances, 110

HVAC duct installation, 116

inspection of, 17

vents for fuel-burning appliances, 121

high wind, 46

hip rafter framing, 86

home wiring system, 172

hose bibs, 136

hot water supply system, 131

house numbers, 33

hub, 127

hurricane ties/clips, 46, 57, 90

ice dams, 100

I-joists, 68

indirect waste receptor, 127

inlet, 140

inspections

of electrical boxes, 229

of electrical panels, 185

of electrical rough-in, 17

final, 15

of footings, 16

of foundation walls, 16

framing, 17

of heating and air conditioning, 17

overview of, 14

of plumbing rough-in, 17

of receptacles, 232

required, 15

of service panel, 223

of switches, 232

inspectors, working with, 11

installation instructions, 13

insulation clearance to heat producing devices, 95

intake openings, 37, 117

interior stairways, 24

intermediate spacing, 70

International Building Code (IBC), 9, 10

International Code Council (ICC), 8

International Energy Conservation Code (IECC), 9

International Fuel Gas Code (IFG), 9

International Mechanical Code (IMC), 9

International Plumbing Code (IPC), 9

International Residential Code (IRC), 7, 8, 9, 10

ionizing alarms, 42

irrigation systems, 167

island fixture vent, 154

jumper wire, 225

junction boxes, 204

kick-out flashing, 84, 103

kitchens. See also individual appliances

exhaust fan rates, 39

exhaust requirements, 38

receptacle installation, 200

kneewall areas, 20

laminated beam, 68

laminated glass, 34

landing, 24, 27, 32, 33

lateral load connector hardware, 55

laundry receptacle, 201

laundry receptacle circuits, 190

laundry tray, 127

ledger attachment, 55

light fixtures

boxes for, 204

common problems with, 231

installation of, 214

lighting, for stairways, 24, 25

live loads, 29, 46, 91, 93

living area floor joist spans, 63

load-bearing walls

floor joists under, 64

stud size and spacing for, 73

loads, 46

local building codes, 8

local code amendments, 9

location (damp), 170

location (wet), 170

locks, 30, 32

lumber

for decks, 54, 60

nailing structural, 72

manufacturer’s instructions, 13

masonry fireplace clearance, 104

measurement conversions, 234

microwave ovens, 39

mildew, 36

mistakes, common, 222

moisture, 36

mold, 36

multiwire branch circuit, 171, 191

nail guards, 226

nailing definitions, 70

National Electric Code (NEC), 9, 222

National Fire Protection Agency, 222

NM cable, 193, 217

non-grounding type receptacles, 199

nonload-bearing walls, stud size and spacing for, 74

nosing, 24, 27

notches and holes

in ceiling joist, 88

in joists and rafters, 68

in joists and studs, 193

in rafters, 69, 88

in top plate, 75

in wall studs, 76

O.C. (on center), 70

offset, 127

offset joints, 75

on-center spacking, 58

open risers, 26

OSB panel labels, 67

outdoor air, prohibited sources for, 117

outlet, 171

overcurrent protection device, 171

permit expiration, 15

permits, 14

pet doors, 22

photoelectric alarms, 42

pipe support, 135

pipes

connections and joints between, 142

drain and sewer, 138

joints between different types, 145

protecting, 136

size reduction, 145

slope of, 145

plate constructions, 75

plumbing rough-in inspection, 17

plumbing systems

about, 125

drain, waste and vent piping (DWV), 137

home plumbing system, 130

plumbing appliances and fixtures, 157

plumbing traps, 156

plumbing vents, 148

water supply piping, 131

plywood labels, 67

point load, 46, 47

polarized receptacles, 217

post cap hardware, 59

pressure-reducing valve, 132

private inspectors, 12

pull-down stairs, 23

purlins, 87

PVC plastic pipe joints, 144

raceways, box support by, 206

radio antennas, 218

rafters

bearing on support, 88

bridging and lateral support for, 88

ceiling joist nailed to, 89

deflection for, 92

notches and holes in, 69, 88

span definitions for, 91, 93

truss connection to walls and, 90

rain cap, 105

range hoods, 38, 39

receptacles

definition of, 171

inspecting, 232

installation of, 198

types of, 217

receptor (indirect waste), 127

recessed lights, 214

relief valves, 158

required inspections, 15

resources, 234

return air, prohibited sources for, 117

ridge framing, 86

ridgeboards, 86

rim joist connections, 57

riser, 24

riser height, 26

rod and pipe electrodes, 187

roof, vent height above, 123

roof deck type restriction, 98

roof flashing, 101

roof slope

restrictions for, 98

underlayment application for, 99

roof systems, 86

roof truss installation, 94

roofing fasteners, 103

rust stains, 223

saddle fitting, 128

safety, wiring, 173, 189, 211

safety glazing, 34

sandy gravel soil, 48

sandy soil, 48

sanitary tee, 141

satellite dishes, 218

seismic risk areas, 46

service clearance, 182

service current capacity requirements, minimum, 174

service drop, 171

service entrance wires, 171

service panel, 179

service panel inspection, 223

sewer pipe, 138

shield plate, 75

shingle roof-covering installation, 98

showers, 21, 165

silt soil, 48

sinks, 20, 21

site address, 33

skylights, 102

slip joint, 128, 139

smoke alarms, 42

snow loads, 91, 93

soil (plumbing term), 128

soil load-bearing capacities, 48

soil types, common, 48

solder (soldering), 128

solvent cement, 144

sone ratings, 37

spark arrestor, 105

splices, 176, 227

spread footing, 50

stack, 128

stack vent, 128

stairways, 24

on decks, 60

dimensions for, 25

exterior, 24, 25

guards for, 28

headroom height for, 27

landings for, 27

lighting and switching for, 24

terms for, 24

width for, 25

windows in, 35

standpipe, 129

staples as shingle fasteners, 103

state building codes, 8

steel pipe joints, 144

step flashing, 102

step footing, 50

stop-and-waste valve, 129

street fitting, 141

structural components

about, 45

crawlspaces, 52

decks, 54

floor systems, 62

foundations, 48

roof systems, 86

wall penetration flashing, 84

wall systems, 70

structural panel wall bracing, 78, 80, 82

subfloor, nailing one-piece, 72

support posts, 58

supports, for flooring system, 64

sweep, 141

switches

inspecting, 232

installation of, 212

load limits for, 212

for stairways, 24, 25

tailpiece, 129, 139

tamper-resistant receptacles, 198

tee, 141

television antennas, 218

tempered glass, 34

three-slot receptacles, 217

three-way switches, 212

timer switches, 213

toenailing, 70

toilets, 20, 21, 160

top plate construction, 75

transition cement, 144

transition duct, 41

traps, 129, 137, 148, 156

tread, 24

tread depth, 26

tread nosing, 27

tread slope, 27

trusses

alteration and repair of, 94

connection to walls, 90

design and bracing requirements for, 94

floor, 68

installation tolerances for, 94

roof, 94

tubs, 21

Type X drywall, 23

UF cable, 193

underground service lateral, 181

underground water pipe electrodes, 187

underlayment

application of, 99

specifications for, 99

ungrounded conductor, 171

Uniform Plumbing Code (UPC), 9

unused openings, closure of, 174

valley framing, 86

vent (plumbing term), 129

vent pipes, 137, 148

vent stack, 129

vent termination, 150

vents and ventilation, 36

chimney as appliance vent, 105

clearance for, 122

connectors and fittings for, 121

for crawlspaces, 52

for fireplaces, 104

for fuel-burning appliances, 121

joints between, 123

plumbing, 148

slope of, 123

volume units, 205

wall bracing, 78

wall footing, 50

wall penetration flashing, 84

wall studs

notches and holes in, 76

size and spacing for, 73

wall systems, 70

walls, fire separation and, 23

waste, 129

waste tee, 163

water distribution pipes, 133

water flow, 132

water heaters, 157

water pipe bonding, 188

water pressure, 132

water supply backflow protection, 166

water supply riser, 165

water-hammer arrestors, 163

web-type trusses, 68

wet locations, 206, 213, 215

wet surfaces, safety glazing near, 35

wet vents, 153

whirlpool bathtubs (jetted baths), 164, 203

wind, high, 46

winder stair tread, 27

winder tread, 24

window hazards, 34

window wells, 31

windows

above bathtubs and showers, 35

fall hazard rules for, 35

how to flash, 85

wire, recognizing aluminum, 224

wire connections, checking, 228

wire volume unit, 205

wires

color codes for, 178

connecting to terminals, 177

size chart for, 178

splicing, 176

wiring methods, 192

wiring safety, 173, 189, 211

wiring support requirements, 196

wood grades, in wall construction, 73

wood nailing

definitions for, 70

requirements for, 71

wood structural panel wall bracing, 82

wood-burning fireplace energy efficiency requirements, 105

woven valleys, 101

wye, 141

yard hydrant (freeze proof), 129

zoning ordinances, 10

Rather have me do it?

I know the codes so you pass inspection the first time.